{"rows":500,"os":"0","page":"1","total":"22729","projects":{"P505244":{"id":"P505244","countryname":["Republic of Rwanda"],"lendinginstr":"Development Policy Lending","project_name":"Boosting Green Finance, Investment and Trade in Rwanda","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-12-20T00:00:00Z","closingdate":"12/20/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505244","status":"Active","project_abstract":{"cdata!":"The development objective of the Boosting Green Finance, Investment and Trade in Rwanda Project is to support reforms aimed at creating a level playing field and mobilizing investment, particularly green. The is aligned with the GoR’s vision for transformative growth, targeting the advancement of private sector-led and eco-conscious development as encapsulated in Rwanda’s Vision 2050. This programmatic DPF series is structured around a comprehensive reform agenda that addresses key barriers impeding private sector investment and green growth. entral to this operation is its alignment with the World Bank Group’s Country Partnership Framework (CPF) for Rwanda for FY2021–2026, focusing on mobilizing private capital, enlarging the private sector’s economic footprint, and promoting green growth. This operation is aligned with the goals of the Paris Agreement. This DPF aims to stimulate green, private sector-led growth that is aligned with Rwanda’s priorities for climate mitigation, adaptation, and resilience.  The design of this operation gives continuity to the reforms initiated in the first year of the series. It embodies lessons learned from implementing previous DPF operations in Rwanda, particularly from the Human Capital for Inclusive Growth programmatic DPF series. It has the following two pillars: (i) Creating a level playing field; and (ii) Mobilizing investment, particularly green."}},"P176429":{"id":"P176429","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Chattogram Water Supply Improvement Project","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"280,000,000","boardapprovaldate":"2024-12-19T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176429","status":"Active"},"P181587":{"id":"P181587","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Transforming Agri-food Systems in Morocco","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-12-19T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181587","status":"Active"},"P180283":{"id":"P180283","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Program-for-Results Financing","project_name":"Health, Nutrition and Population Sector Development Program","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"379,000,000","boardapprovaldate":"2024-12-19T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180283","status":"Active"},"P507508":{"id":"P507508","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Amaravati Integrated Urban Development Program","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-19T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P507508","status":"Active","project_abstract":{"cdata!":"The development objective of the Amaravati Integrated Urban Development Program Project for India is to strengthen the institutional framework and infrastructure planning and delivery for inclusive and sustainable urban growth in Amaravati. To achieve the long-term development objectives of Amaravati, the GoAP program aims to put in place city governance, a financing framework and service delivery institutions, implement green and resilient urban infrastructure, deliver reliable urban services, attract private investments, and strengthen socioeconomic support programs to enhance the jobs skills and economic opportunities for existing and future residents of Amaravati. Together with the ADB financing, this PforR will support selected priority interventions within the government’s program. Specifically, the Program supports all key activities on institutional strengthening, sustainable financing, skills training and investment promotion under the government’s program, green and resilient housing apartments in the AGC, a structuring network of trunk infrastructure and flood mitigation works, and connectivity in selected LPS neighborhoods to transport and public services. These activities are grouped under three interrelated results areas (RAs) aimed at establishing the foundations for Amaravati’s long-term development as an economically dynamic, inclusive, resilient, and sustainable city as follows: RA1: Strengthened Governance and Financing Framework; RA2: Inclusive Socioeconomic Growth and Community Development; and RA3: Resilient Infrastructure and Sustainable Service Delivery. The Program Expenditure Framework (PEF), derived from the Government program, outlines the financial structure and budgetary allocations necessary to achieve the expected outcomes under the three RAs."}},"P180439":{"id":"P180439","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Development Policy Lending","project_name":"Second Bangladesh Green and Climate Resilient Development Credit","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-12-19T00:00:00Z","closingdate":"1/15/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180439","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Bangladesh Green and Climate Resilient Development Credit Project is to support the government of Bangladesh in transitioning to green and climate-resilient development. This will be achieved by enhancing public planning, financing, and delivery of green and climate-resilient interventions, and promoting key sector reforms for clean and resource-efficient production and services. The project aligns with Bangladesh’s 8th Five-Year Plan (FY21–25), which aims to eliminate extreme poverty, achieve upper-middle-income country status by 2031, and high-income country status by 2041. The plan includes comprehensive structural reforms to accelerate sustainable growth, build climate resilience, enhance public services, and manage the environment and natural resources better. The Development Policy Credit  (DPC) series supports priority areas of the Government Program, contributing to the 8th FYP, Bangladesh Delta Plan 2100 (BDP), National Adaptation Plan (NAP), and Nationally Determined Contribution (NDCs) by integrating green and climate resilience priorities in public investment planning, incentivizing local actions, enabling access to carbon markets, promoting sustainable public procurement, and setting a legal and institutional framework for effective implementation. The project is aligned with the WBG Country Partnership Framework (CPF) FY23–FY27 and the goals of the Paris Agreement, incorporating lessons from previous DPCs in Bangladesh and other countries."}},"P180864":{"id":"P180864","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Burundi Colline Climate Resilience Project","p2a_updated_date":"2024-12-22 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-12-19T00:00:00Z","closingdate":"3/31/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180864","status":"Active","project_abstract":{"cdata!":"The development objective of the Colline Climate Resilience Project for Burundi is to increase land productivity and climate resilience of fragile communities in targeted collines. The project has four components. The first component, enabling environment for climate resilience, will tackle constraints related to the lack of an integrated policy and coordinated institutional response to land degradation and livelihood resilience. This will be achieved through establishing the enabling environment needed and increasing support for building capacity at national, sub-watershed and colline levels for effective climate risk management, sustainable watershed management, climate resilience, and integrated water resource management. This component has two sub-components. The first subcomponent, strengthening policy and regulatory framework, will provide support to policies and capacity at national and local levels for planning and implementing integrated watershed management and for climate resilient practices benefitting socially vulnerable groups (women and youth). The second subcomponent, institutional capacity strengthening at national, watershed, and community level, will directly support national agencies, and provincial and communal administrations, to implement and manage climate and land risks. The second component, adaptive capacity for sustainable watershed management will address the constraints of fragmented and degraded watersheds and limited access to sustainable finance. It aims to reduce the risks of soil erosion, restore degraded lands and natural resources, and improve the longer-term resilience of the watersheds to climate shocks. It will achieve this through supporting sub-watershed level planning, scaling up landscape restoration, and promoting integrated watershed management (IWM), including management of vulnerable slopes and protected areas. Specifically, project activities will support 87 sub-watersheds targeted by the project, covering 80 collines, and restore 38,639 ha of degraded lands. This component has three subcomponents. The first subcomponent, watershed management planning, will address gaps in coordinated planning of land management interventions. The second subcomponent, sustainable watershed management, will implement the watershed management plans prepared under sub-component 2.1. The third subcomponent, improved management of protected areas (PAs) and reserves, will support the effective and sustainable development of Burundi’s protected area system to conserve biodiversity. The third component, community livelihood resilience support, will address constraints related to limited access to finance and the lack of an integrated response to communities’ needs for resilient livelihoods in the face of rising climate and land risks. This component consists of three sub-components. The first subcomponent, climate-resilience planning, will support the development of Colline-level Climate Action Priorities (or CCAPs). The second subcomponent, climate-resilient agriculture and livelihoods, will support implementation of the CCAPs’ identified priorities and interventions with the aim of enhancing climate-resilient livelihoods and climate-smart agriculture for the most fragile collines. The third subcomponent, land certification, will improve land security through systematic land certification in each target colline, as an enabling condition for land security, access to financing, and climate-resilient livelihood investments. The fourth component, project management, will finance the project management, coordination, communication, monitoring and evaluation (M&E) activities, as well as the environmental and social framework (ESF)."}},"P507116":{"id":"P507116","countryname":["Republic of Zambia"],"lendinginstr":"Development Policy Lending","project_name":"First Zambia Climate and Economic Resilience Programmatic DPF with Cat-DDO","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-18T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P507116","status":"Active","project_abstract":{"cdata!":"The development objective for the First Zambia Climate and Economic Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option Project for Zambia is to: (i) enhance fiscal management and resilience, (ii) promote private-sector investment and resilience in enabling sectors, and (iii) strengthen disaster risk management and climate resilience. The DPF supports Zambia in carrying out reforms aimed at increasing resilience to economic and climate shocks, while promoting private sector-led growth and providing financing for immediate and potential liquidity needs following disasters. It aims to enhance the government’s capability to address the effects of climate change and economic shocks and to improve fiscal resilience. The operation strengthens Zambia’s DRM systems and enhances the resilience of households and the private sector to climate shocks, addressing critical gaps in the current institutional framework. Alongside the World Bank’s ongoing efforts to support Zambia in emerging from the current catastrophic drought, this DPF series provides readily available financing in case of a future shock. It also aligns with the international commitment to help the country restore macroeconomic stability and debt sustainability under the Common Framework. The program is structured around three pillars and eight prior actions, fully aligned with the GRZ priorities. Pillar A enhances fiscal management and resilience, creating buffers against economic and climate shocks and improving the sovereign credit risk assessment framework. Pillar B promotes private-sector investment and resilience in enabling sectors, bolstering private-sector participation in the transport, energy, and water sectors and reducing the financial impacts of future natural disasters in these sectors. Pillar C strengthens disaster risk management and climate resilience, improving the coordination and effectiveness of the GRZ in managing disasters, enhancing household resilience to climate shocks, and making water resource management more climate resilient. The Cat DDO can be drawn once a “state of disaster” in case of adverse natural or public health-related events has been issued according to the process indicated in the Disaster Management Act of 2010."}},"P179138":{"id":"P179138","countryname":["Republic of Togo"],"lendinginstr":"Investment Project Financing","project_name":"Togo Digital Acceleration Project","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-12-18T00:00:00Z","closingdate":"1/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179138","status":"Active","project_abstract":{"cdata!":"The development objective of the Digital Acceleration Project for Togo is to expand access to affordable and climate-resilient broadband connectivity, enhance digital skills and digital entrepreneurship. This project has four components. 1) The first component, Expanding Broadband Connectivity, has the following sub-components: (i) Backhaul Network Deployment; and (ii) Expanding Last-Mile Connectivity. 2) The second component, Boosting Digital Skills and Entrepreneurship Ecosystem, has the following sub-components: (i) Tech Hub; and (ii) Knowledge Network. 3) The third component, Strengthening Legal, Regulatory, and Institutional Environment for Digital Economy, has the following sub-components: (i) Strengthening Enabling Environment for Digital Economy; and (ii) Capacity-building for Public Officials. 4) The fourth component, Project Management, will provide support for the management and implementation of project activities."}},"P506463":{"id":"P506463","countryname":["Ukraine"],"lendinginstr":"Development Policy Lending","project_name":"Second Growth Foundations Development Policy Operation","p2a_updated_date":"2024-12-19 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-17T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506463","status":"Active","project_abstract":{"cdata!":"The Second Growth Foundations Development Policy Operation (DPO) supports the authorities’ efforts to (i) strengthen the economic policy framework to facilitate a structural shift towards sustainable growth and (ii) enhance macro-financial stability to create a growth-conducive environment. This is the second operation in a programmatic series of two and provides financing of US1.051 billion dollars using International Bank for Reconstruction and Development (IBRD) resources credit-enhanced through the Advancing Needed Credit Enhancement (ADVANCE) Ukraine Trust Fund, supported by the Ministry of Finance of Japan and the Government of the United Kingdom (UK). Disbursement of the portion of the loan guaranteed by the UK is subject to signing the guarantee agreement between the World Bank and the UK. The portion of the loan amount supported by the credit enhancement is subject to the deposit of the equivalent amount of promissory notes by the Ministry of Finance of Japan into the ADVANCE Ukraine Trust Fund. Ukraine’s Ministry of Finance has agreed with the Ministry of Finance of Japan on a partial2 capitalization of interest accruing and fees due under the terms of the loan for the proposed operation for the period for which the operation is active, which would be paid out of the proceeds of the loan and reduce the disbursed amount. Recognizing the importance of increasing growth, the authorities and their international partners have embarked on an ambitious reform agenda. This agenda aims to achieve four outcomes simultaneously: (i) maintaining macroeconomic stability, (ii) accelerating short-term growth through targeted interventions, (iii) strengthening institutional alignment with the EU, and (iv) increasing the country’s medium-term potential growth. Development partner support has been strategically aligned with these areas. The International Monetary Fund (IMF) is supporting a 48-month US$15.6 billion Extended Fund Facility (EFF) program focused on maintaining economic stability. The EU, through the accession negotiation process and the 4-year, EUR50 billion “Ukraine Facility”, supports improved institutional alignment with the EU. The World Bank Group (WBG), in close collaboration with and with financial support from other development multilateral and bilateral partners, has been advising the authorities on structural growth issues and has played a pivotal role in helping mitigate adverse impacts since February 2022."}},"P506611":{"id":"P506611","countryname":["Republic of Tajikistan"],"lendinginstr":"Investment Project Financing","project_name":"Tajikistan Digital Foundations Project","p2a_updated_date":"2024-12-19 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-17T00:00:00Z","closingdate":"12/13/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506611","status":"Active","project_abstract":{"cdata!":"The development objective of Digital Foundations Project for Tajikistan is to improve the delivery of digitally-enabled public services and to enhance digital skills of the population. This project has three components. 1) The first component, Strengthening Foundations for Safe Digital Government Systems and Services, has the following sub-components: (i) Digital Public Infrastructure; and (ii) Digital Safeguards and Enablers. 2) The second component, Enhancing Digital Skills, has the following sub-components: (i) Digital Literacy and Skills; and (ii) Modernization of Learning Environments. 3) The third component, Project Management, will finance project implementation and activities to strengthen the technical, institutional, and project management capacity of implementing entities."}},"P181166":{"id":"P181166","countryname":["Republic of Honduras"],"lendinginstr":"Investment Project Financing","project_name":"Honduras Sustainable Connectivity Project","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"187,000,000","boardapprovaldate":"2024-12-17T00:00:00Z","closingdate":"12/31/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181166","status":"Active","project_abstract":{"cdata!":"The development objective of Sustainable Connectivity Project for Honduras is to improve climate-resilient and safe transport access in the northwestern region of Honduras and promote sustainable livelihoods in selected areas through landscape management and women-led economic initiatives. This project has four components. 1) The first component, Construction of the CA-4 – CA-13 Connection Road Corridor, aims to finance the construction of a new two-lane 46-km climate-resilient and safe road connecting the CA-4 (near Macuelizo) and the CA-13 (near Corinto), close to the Guatemalan border. 2) The second component, Resilient improvement of feeder roads, finance the paving of about 41 km of existing unpaved feeder roads that are directly or indirectly connected to the new corridor to improve climate-resilient and safe access of the rural population in an area where climate change-exacerbated flooding has been identified as a key threat to the sustainability of the unpaved road network. 3) The third component, Inclusive and integrated sustainable landscape management, will combine gender-inclusive sustainable landscape management with community-driven economic development in priority areas adjacent to the CNP (including declared micro-basins) along the new road alignment West to the CNP. 4) The fourth component, Institutional strengthening, capacity building, and project management, has the following sub-components: (i) Institutional capacity building; (ii) Road Safety; and (iii) Project Management Support."}},"P181029":{"id":"P181029","countryname":["Republic of Tajikistan"],"lendinginstr":"Investment Project Financing","project_name":"Sustainable Financing for Rogun Hydropower Project","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-12-17T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181029","status":"Active","project_abstract":{"cdata!":"The objective of the Sustainable Financing for Rogun Hydropower Project for Tajikistan is to increase the supply of clean, affordable, and climate-resilient hydroelectricity for consumers in Tajikistan and the Central Asia region. There are four components to the project, the first component being construction activities. Activities include: (i) design and supply of replacement runners for generating units 5 and 6 and design, supply, and installation of electro-mechanical equipment for generating units 3 and 4 with a combined installed capacity of approximately 1,260 MW, including turbines, generators, frequency governor, excitation system, electrical systems, unit-related monitoring system, cooling water system, compressed air system for the governor, fire detection and suppression systems (lot 1); and (ii) installation of replacement runners for generating units 5 and 6 and other turbine rehabilitation works and control system integration (lot 1A). The design of electromechanical equipment includes design specifications that account for projected increases in precipitation due to climate change, thereby minimizing the risk of damage or dam failure. The second component is the project implementation support. This component includes project management consultants, employer costs, and implementation support. The third component is implementing a resettlement action plan (rap) and livelihood restoration plan. Finally, the fourth component is the hydro-meteorological activities. This component includes hydromet investments, TA for improved water use, and monitoring water use."}},"P181627":{"id":"P181627","countryname":["Republic of Uzbekistan"],"lendinginstr":"Investment Project Financing","project_name":"Uzbekistan - Khorezm Solar IPP Project","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"3,500,000","boardapprovaldate":"2024-12-16T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181627","status":"Active"},"P503960":{"id":"P503960","countryname":["Republic of Sierra Leone"],"lendinginstr":"Development Policy Lending","project_name":"Sierra Leone First Macro Stability and Resilience DPO with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-13T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503960","status":"Active","project_abstract":{"cdata!":"Sierra Leone is susceptible to economic and climate shocks, which, along with structural bottlenecks, have undermined macroeconomic stability and the ability to sustain growth. The development policy financing (DPF) operation with a Catastrophe Deferred Drawdown Option (Cat DDO) is the first in a programmatic series of three to help restore macro-fiscal stability and strengthen economic resilience. The financing is an International Development Association (IDA) grant of US60 million dollars equivalent with a Cat DDO of US20 million dollars equivalent, of which US5 million dollars is from the Crisis Response Window (CRW). The program development objective is to (i) improve fiscal management, (ii) enable conditions for inclusive growth, and (iii) build climate and disaster resilience. Reforms under the first pillar aim to increase revenue collection, strengthen public financial management (PFM), and improve accountability and transparency in public procurement. Reform under the second pillar aims to improve the energy sector's operational efficiency, enhance access to finance, and foster gender equality in employment and economic opportunities. Reforms under the third pillar aim to strengthen the country’s ability to respond to climate shocks and natural disasters. The operation is closely aligned with the Government’s Medium-term National Development Plan (MTNDP 2024-2030) priorities. The government’s commitment to reforms is further reflected in the Letter of Development Policy (annex 4). This DPF builds on the strong foundation established by the previous Inclusive and Sustainable Growth\nDPF series and earlier operations, and is complementary to the support from other development partners."}},"P504629":{"id":"P504629","countryname":["Republic of the Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Sudan Health Assistance and Response to Emergencies","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"86,000,000","boardapprovaldate":"2024-12-13T00:00:00Z","closingdate":"1/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504629","status":"Active","project_abstract":{"cdata!":"The development objective of the Health Assistance and Response to Emergencies Project for Sudan is to restore access to a basic package of health and nutrition services and preserve the main elements of essential public health functions. The project comprises of three components. The first component, improving access to basic health and nutrition services aims to enhance access to basic health and nutrition services in Sudan through low-cost, high impact interventions using a primary health care (PHC) approach. It consists of following sub-components: (i) strengthening the integration of primary health care model; (ii) supporting health and nutrition services at the first level referral centers and hospitals; (iii) climate change adaptive health service delivery; (iv) climate change resilient health facilities; and (v) integrating digital solutions to service delivery. The second component, preserving the main elements of the health system will focus on strengthening health systems and public health programs and improving the main elements of the health system to prepare for and respond to health emergencies and control diseases by strengthening emergency preparedness, laboratory, and disease control systems. The third component, monitoring and evaluation (M and E) and project management will finance costs related to M and E and management of project activities. It consists of following sub-components: (i) third party monitoring (TPM) (competitively selected TPM agency); (ii) data analysis and knowledge management; and (iii) project management."}},"P505963":{"id":"P505963","countryname":["Republic of the Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Sudan SANAD - Emergency Crisis Response Safety Net Project","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-12-13T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505963","status":"Active","project_abstract":{"cdata!":"The development objective of the Sanad: Emergency Crisis Response Safety Net Project for Sudan is to provide emergency safety nets support to vulnerable and food insecure populations in selected areas of the Republic of the Sudan. The project comprises of three components. The first component, unconditional cash transfers will be implemented by World Food Program (WFP) and will deliver unconditional cash transfers. The second component, human capital sensitive cash transfers will be implemented by United Nations Children’s Fund (UNICEF) and will provide cash transfers to vulnerable and food insecure pregnant and lactating women (PLW) in selected areas and localities with a strong link to health and nutrition services. The third component, project management finances costs associated with the implementation of the first two components of the project."}},"P180640":{"id":"P180640","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Investment Project Financing","project_name":"Rural Access and Agricultural Marketing Project - Scale Up","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-12-13T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180640","status":"Active","project_abstract":{"cdata!":"The development objective of Rural Access and Agricultural Marketing Project Scale Up for Nigeria is to improve rural access and climate resilience of communities in targeted rural areas and strengthen institutional capacity for management of the rural road network and in case of an Eligible Crisis or Emergency, respond promptly or effectively to it. This project has four components. 1) The first component, Improvement of Resilient Rural Access, has the following sub-components: (i) Climate-informed Rural Roads Rehabilitation/Upgrade; (ii) Supplemental Technical Support for Rural Roads Rehabilitation/Upgrade; and (iii) Support for Social Inclusion.2) The second component, Climate-Resilient Asset Management, has the following: (i) Asset Management Improvement and Resilience Scale up; and (ii) Development and Implementation of a Climate Risk-Informed Road Asset Management System. 3) The third component, Institutional Strengthening and Project Management, has the following sub-components: (i) Project Management; and (ii) Institutional Strengthening and Sector Reforms. 4) The fourth component, Contingent Emergency Response Component (CERC), is included in the project in accordance with Investment Project Financing (IPF) Policy, paragraphs 12 and 13, for Situations of Urgent Need of Assistance and Capacity Constraints."}},"P506425":{"id":"P506425","countryname":["Republic of Kiribati"],"lendinginstr":"Investment Project Financing","project_name":"Kiribati Kiritimati Infrastructure Project","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-13T00:00:00Z","closingdate":"3/31/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506425","status":"Active","project_abstract":{"cdata!":"The development of the Kiritimati Infrastructure Project in Kiribati aims to improve the safety and climate resilience of Kiritimati’s regional and national connectivity by air and road, and to respond promptly and effectively in case of an eligible crisis or emergency. This project has four components. The first component, Safe and Climate Resilient Regional Connectivity, includes the following sub-components: (i) Technical assistance (TA) under a design and supervision consultancy (DSC) for all design and supervision activities related to the airport and the airport precinct and connection roads; (ii) Civil works, including remediation of the runway, taxiway, and apron, installation of perimeter security fencing, and construction of the airport precinct and connection roads; (iii) Supply and installation of plant and equipment for navigation, communications, safety, and security at the airport; (iv) Development of an airport website with differential access for the public and CXI staff; (v) TA through the DSC for maintenance and operations guidance; and (vi) TA to update the aeronautical information publication (AIP) to reflect the aviation upgrades. The second component, Safe and Climate Resilient Connectivity by Road, includes the following sub-components: (i) TA through the DSC for all necessary design and supervision activities related to the project; (ii) Civil works for the town roads; (iii) TA through the DSC for road maintenance planning and operational guidance; and (iv) Purchase of motorcycle helmets specifically for children to be distributed under arrangements through MLPID. The third component, Project Implementation Support, includes the following sub-components: (i) TA for the Project Coordinating Unit (PCU); (ii) support to engage additional individual national consultants needed by KFSU; (iii) Purchase of up to three project vehicles for use by the PCU, MLPID, and MICT focal points, and KFSU when on Kiritimati; (iv) Renovations to an existing building on the MLPID London site; (v) Incremental Operating Costs (IOC) and training and workshops; and (vi) Support to implement measures to mitigate and respond to project-related cases of sexual exploitation and abuse and sexual harassment (SEA/H), including an SEA/H Action Plan. The fourth component, Contingent Emergency Response Component (CERC), aims to reallocate project funds to support emergency response and reconstruction."}},"P181643":{"id":"P181643","countryname":["Islamic  Republic of Afghanistan"],"lendinginstr":"Investment Project Financing","project_name":"Education Emergency Response in Afghanistan Additional Financing","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-12-12T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181643","status":"Active"},"P181310":{"id":"P181310","countryname":["Republic of Cabo Verde"],"lendinginstr":"Development Policy Lending","project_name":"Cabo Verde Second Fiscal Space and Sustainable Growth Development Policy Financing","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-12-12T00:00:00Z","closingdate":"12/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181310","status":"Active","project_abstract":{"cdata!":"The Development Policy Financing (DPF) operation supports Cabo Verde’s overarching goal to achieve sustainable and climate-resilient development. The operation, the second in a programmatic series of three, comprises International Development Association (IDA) credits of SDR 1 million (US1.3 million dollars equivalent) on small economy terms and US23.7 million dollars on shorter maturity loan (SML) terms, of which US$6.6 million is from the Scale-Up Window (SUW)- SML. The Program Development Objective (PDO) is to (i) strengthen fiscal resilience; (ii) enable the uptake of digital services and renewable energy; and (iii) enhance economic opportunity. The DPF aligns with the GoCV’s Strategic Plan for Sustainable Development II (Plano Estratégico de Desenvolvimento Sustentável II, PEDS II, 2022-2026) and IDA20 priorities, such as women’s labor force participation, transparency and efficiency in governance, and climate-resilient public investments. The reforms supported through this proposed operation complement the World Bank’s broader engagement in Cabo Verde. The DPF series is aligned with the World Bank FY20-25 Country Partnership Framework (CPF), and reflects the One World Bank approach by leveraging operations from across the World Bank and International Finance Corporation (IFC). It also contributes to several outcome areas of the World Bank’s Scorecard – including (i) effective macroeconomic and fiscal management; (ii) green and blue planet and resilient populations; (iii) affordable, reliable and sustainable energy for all; (iv) digital services; and (v) gender equality."}},"P171422":{"id":"P171422","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Second Karachi Water and Sewerage Services Improvement Project (KWSSIP-2)","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"240,000,000","boardapprovaldate":"2024-12-12T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P171422","status":"Active","project_abstract":{"cdata!":"The objective of the Urban Water, Sanitation, and Hygiene (WASH) Services Program Multiphase Programmatic Approach (MPA) Including first phase loan for the Second Karachi Water and Sewerage Services Improvement Project is to provide safely managed WASH services in urban areas in Pakistan. There are four components to the project, the first component being capacity building and reform of KWSC. This component will finance capacity building and reform support activities to enable KWSC’s evolution into a well-functioning utility resilient to climate change. The second component is the safely managed water supply and sanitation services. This component includes seven subcomponents: provision of safely managed drinking water and sanitation services in selected unplanned settlements (katchi Abadis), priority sewer network rehabilitation and expansion, priority water distribution network rehabilitation and expansion, improvement of energy efficiency, K-IV Augmentation, rehabilitation and reconstruction of existing water treatment plants, and construction of Malir basin wastewater interceptor, wastewater treatment, recycling plant, and new recycled water distribution network. The third component is the project management and studies. This component finances (i) project management and coordination, including design review and construction supervision, project management support, E&S risk management, and project results monitoring and evaluation, as well as beneficiary surveys and the Project’s impact evaluation. Finally, the fourth component is the contingent emergency response component."}},"P178687":{"id":"P178687","countryname":["Nepal"],"lendinginstr":"Development Policy Lending","project_name":"NEPAL SECOND GREEN, RESILIENT, AND INCLUSIVE PROGRAMMATIC DEVELOPMENT POLICY CREDIT","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-12-12T00:00:00Z","closingdate":"12/15/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178687","status":"Active","project_abstract":{"cdata!":"The Green, Resilient, and Inclusive Development (GRID) programmatic Development Policy Credit (DPC) series is a catalyst for Nepal’s ongoing transition to a GRID path. The series of three operations is a key instrument for Nepal to operationalize its homegrown GRID Platform across the economy. This ambition is articulated in the 2021 Kathmandu Declaration on GRID, 2023 Joint Communiqué on GRID, Nepal’s 16th Five-Year Development Plan, and Nepal’s GRID Strategic Action Plan 2024-2034 (SAP) which is now being finalized after a series of provincial consultations. The GRID SAP includes over US10 billion dollars of ongoing and pipeline investments for ten key transitions. The World Bank and 15 other Development Partners (DPs) back this effort, including the International Monetary Fund (IMF), International Finance Corporation (IFC), Asian Development Bank (ADB), the United Nations, and other multilateral, bilateral, and nongovernmental organizations that coordinate on policy, knowledge, and investment via Nepal’s GRID Platform. Nepal’s political situation remains fluid, yet commitment to GRID and this DPC series has been maintained by four successive coalition governments that have taken office since the November 2022 federal and provincial elections. The current coalition took over on July 14, 2024, led by the two largest parties in Parliament. This change has impacted the provincial government set up. At the sub-national level, funds, functions, and staff are managed by the seven provinces and 753 local governments for which legislation, institutions, and administrative procedures have been formalized as constitutionally prescribed. The federalization process is supported by this DPC series."}},"P178253":{"id":"P178253","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"Uttar Pradesh Agriculture Growth and Rural Enterprise Ecosystem Strengthening Project","p2a_updated_date":"2024-12-16 00:00:00.0","totalcommamt":"325,100,000","boardapprovaldate":"2024-12-12T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178253","status":"Active","project_abstract":{"cdata!":"The objective of the Uttar Pradesh Agriculture Growth and Rural Enterprise Ecosystem Strengthening Project for India is to increase farmers' income through improved crop productivity, climate resilience, and commercialization of agri-food systems in Selected Regions of Uttar Pradesh. The project has five components, the first being productivity enhancement. This component focuses on strengthening agricultural productivity and resilience against the backdrop of high levels of climate risks and variability in productivity across the project areas. This component includes four subcomponents: resource use efficiency, seed systems, agri-extension, and leveraging climate action mechanisms. The second component is the commodity clusters. This component will support the integration of smallholder farmers into value chains for select high-value commodities. The project will help ‘commodity clusters’, networks of producers, agribusinesses, and public institutions within a defined geographic area engaged in the same agricultural subsector. This component includes three subcomponents: crop clusters, agri special economic zones, fisheries, and integrated agriculture export hubs. The third component is the digital and financial ecosystems. This component includes two subcomponents: digital architecture, technology services, and agri finance ecosystem. The fourth component is project management, learning, and partnerships. Finally, the fifth component is the Contingent Emergency Response Component (CERC)."}},"P500536":{"id":"P500536","countryname":["Kingdom of Bhutan"],"lendinginstr":"Development Policy Lending","project_name":"Bhutan Climate and Disaster Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2024-12-13 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-11T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500536","status":"Active","project_abstract":{"cdata!":"The operation will provide the Royal Government of Bhutan (RGoB) access to immediate liquidity in the aftermath of natural disasters including disease outbreaks through an IDA US$40 million Climate and Disaster Resilience Development Policy Financing (DPF) with a Catastrophe Deferred Drawdown Option (Cat DDO). The partnership between the RGoB and the World Bank over the last decade has sustained and deepened reforms toward a safe and resilient Bhutan, including the DPF with a Cat DDO (P173008; the First Cat DDO), which was fully disbursed (US14.8 million dollars) for the RGoB’s initial COVID-19 emergency response efforts. The Project Development Objective (PDO) is to strengthen the technical and institutional capacity of the RGoB to manage the risk of climate change and natural disasters. This would be achieved by supporting reforms under two pillars: (i) integrating climate and disaster resilience into critical infrastructure and buildings; and (ii) strengthening systems for natural disasters early warning and financial resilience of property. The operation builds on the partnership between the RGoB and the World Bank over the last decade, which has sustained and deepened policy and institutional reforms toward a resilient Bhutan."}},"P181428":{"id":"P181428","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Agriculture Sector Recovery in Türkiye's Earthquake-affected Provinces","p2a_updated_date":"2024-12-13 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-12-11T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181428","status":"Active","project_abstract":{"cdata!":"The objective of the Agriculture Sector Recovery in Türkiye’s Earthquake-affected Provinces Project is to support the resilient recovery of the agriculture sector in Türkiye’s earthquake-affected provinces and target adjacent areas. The project has three components, the first being enabling service provision for a climate-resilient agricultural sector. This component includes two subcomponents: investing in irrigation for enhanced water efficiency and climate resilience and promoting common machinery utilization models for improved access to mechanization. The second component is supporting the climate-smart recovery of the livestock sector. These component activities aim to support the recovery and modernization of the livestock sector in earthquake-affected provinces by adhering to building-back-better principles, under climate-smart livestock approaches and disaster risk principles. This component includes two subcomponents: recovering the productive capacity of livestock farmers and businesses and restoring pastureland for enhanced livelihoods and resilient animal production systems. Finally, the third component is project management, monitoring and evaluation. Activities within this component will include: (i) project management support for the Project Coordinating Unit (PCU) and implementing General Directorates, including capacity strengthening in technical, fiduciary, environmental and social (E&S) aspects; (ii) ensuring compliance with E&S risk management, including grievance redress, gender considerations, and citizen engagement (CE); (iii) preparing and implementing a project communication and visibility plan; (iv) monitoring and evaluation (M&E); and (v) operational expenses."}},"P181238":{"id":"P181238","countryname":["Republic of Togo"],"lendinginstr":"Development Policy Lending","project_name":"Togo's Second Sustainable and Inclusive Development Policy Financing","p2a_updated_date":"2024-12-12 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-12-10T00:00:00Z","closingdate":"5/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181238","status":"Active","project_abstract":{"cdata!":"This Second Sustainable and Inclusive Development Policy Financing is the second in a series of two operations to support the foundation for Green, Resilient and Inclusive Development (GRID) in Togo. The Program Development Objectives (PDO) are to (i) promote sustainable agriculture, rural electrification, and climate action; (ii) boost human capital and the resilience of vulnerable populations; and (iii) rebuild fiscal space for priority interventions. The operation will help address Togo’s key development challenges in ending extreme poverty and promoting shared prosperity on a livable planet identified in recent World Bank diagnostics1 by boosting economic opportunities in rural areas in an equitable and climate-conscious way, strengthening the resilience of vulnerable populations, improving learning outcomes in underserved areas, empowering women and supporting macroeconomic stability. It will also help leverage the private sector to meet development needs, focusing on attracting new investments in the agriculture and energy sector. The proposed operation includes an International Development Association (IDA) credit of EUR 178.8 million (US200 million dollars equivalent) provided on standard 50-year IDA credit terms."}},"P181645":{"id":"P181645","countryname":["Commonwealth of Dominica"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing III Dominica Disaster Vulnerability Reduction Project","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-12-06T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181645","status":"Active"},"P181174":{"id":"P181174","countryname":["Republic of Costa Rica"],"lendinginstr":"Investment Project Financing","project_name":"Costa Rica Results in Education (CORE)","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-12-06T00:00:00Z","closingdate":"5/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181174","status":"Active","project_abstract":{"cdata!":"The objective of the Results in Education (CORE) Project for Costa Rica is to enhance MEP efficiency and improve foundational learning, digital competencies, and employability skills of students in MEP-administered schools. The project has four components: the first component being support for the management transformation of MEP and the modernization of its information systems. This component has two subcomponents: management transformation of MEP, and information systems modernization. The second component is the support for Pedagogical Transformation. This component includes three subcomponents: support for foundational learning, support of digital competencies and hybrid learning, and supporting the automation of learning assessments. The third component is the support for employability and inclusion in education programs. This component includes two subcomponents: support for employability, and development of targeted programs for indigenous, migrant and refugee students. Finally, the fourth component is the project management and operational analytical support. This component includes two subcomponents: project management, and operational analytical support."}},"P181633":{"id":"P181633","countryname":["Republic of Yemen"],"lendinginstr":"Investment Project Financing","project_name":"Third Additional Financing Yemen Emergency Human Capital Project","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"142,000,000","boardapprovaldate":"2024-12-06T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181633","status":"Active"},"P181752":{"id":"P181752","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Development Policy Lending","project_name":"Cote d'Ivoire DPO3 Guarantee","p2a_updated_date":"2024-12-10 00:00:00.0","totalcommamt":"543,500,000","boardapprovaldate":"2024-12-05T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181752","status":"Active","project_abstract":{"cdata!":"The development objective of Third Investment for Growth Development Policy Financing Project for Côte d'Ivoire is to: (1) strengthen competition in key enabling sectors and domestic revenue mobilization; (2) expand equitable access to health and education services; (3) promote the sustainable use of natural resources. In December 2021, Côte d’Ivoire adopted the National Development Plan (PND) 2021-2025, as its main strategic planning document to sustain high economic growth and inclusion in the medium-term. This operation directly supports the first three categories of actions of the PND and is aligned with the country’s climate change commitments and the Paris Agreement. The operation also supports outcome area four of the new corporate score card: effective macroeconomic and fiscal management. By improving tax revenue collection, it supports a stable fiscal environment that can help government manage debt and marshal resources to deliver services such as health, education, and infrastructure. The operation has three pillars: Pillar 1: Strengthen competition in key enabling sectors and domestic revenue mobilization; Pillar 2: Expand equitable access to health and education services; and Pillar 3: Promote the sustainable use of natural resources."}},"P502012":{"id":"P502012","countryname":["Republic of The Gambia"],"lendinginstr":"Development Policy Lending","project_name":"The Gambia Second Boosting Resilience and Unlocking Productive Potential DPF","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-12-05T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502012","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Boosting Resilience and Unlocking Productive Potential Development Policy Financing Project for Gambia, The are to (i) accelerate private sector participation in the economy; (ii) strengthen procurement, economic governance of SOEs, and domestic revenue mobilization; and (iii) strengthen climate and social resilience. The proposed operation is the second in a programmatic series of two single-tranche DPF operations designed to unlock The Gambia’s productive potential and improve its macro-fiscal stability and resilience to shocks. The series selectively addresses binding constraints to inclusive and sustainable growth identified in the 2020 Systematic Country Diagnostic (SCD). The reform program aims to promote inclusive growth and reduce poverty by supporting the development of commercial agriculture, increasing financial inclusion, accelerating digital development, and expanding access to affordable financial services. Improving the management of public resources is essential for fiscal consolidation and improving the efficiency of public expenditure, to achieve higher and sustainable growth. Strengthening disaster risk management and the country’s disaster recovery framework (DRF) would help ensure that climate change-related threats and responses are integrated into public decision-making and planning. Together, these reforms support The Gambia Recovery Focused NDP 2023–2027 and seek to improve the potential to achieve higher, more resilient, and more inclusive growth. The DPF series aligns with the priorities of the Country Partnership Framework (CPF). Several investment projects and International Finance Corporation (IFC) interventions directly complement this operation and provide financial and institutional capacity-building support in mutually reinforcing areas to ensure the sustainability of the reform agenda. The DPF series is consistent with The Gambia’s climate change commitments and the goals of the Paris Agreement."}},"P502565":{"id":"P502565","countryname":["Republic of Liberia"],"lendinginstr":"Development Policy Lending","project_name":"Liberia First Resilient and Inclusive Growth Development Policy Financing","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-05T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502565","status":"Active","project_abstract":{"cdata!":"Liberia’s vulnerability to frequent natural disasters, including floods, disease outbreaks, and health crises, has hampered macroeconomic stability and derailed progress on inclusive growth. This development policy financing (DPF) operation with a Catastrophe Deferred Drawdown Option (Cat DDO) is the first in a proposed programmatic series of three. This proposed financing is an International Development Association (IDA) credit of US40 million dollars with a Cat DDO of US20.0 million dollars. US 5 million dollars equivalent is from the Crisis Response Window (CRW) to the Republic of Liberia. The operation is closely aligned with the objectives of the new government’s forthcoming development strategy, known as the Agriculture, Roads, Rule of Law, Sanitation, and Tourism (ARREST) Agenda for Inclusive Development (AAID), and the World Bank Group’s (WBG) Country Partnership Framework (CPF) for Liberia. The Cat DDO of this operation will help by providing immediate liquidity in the event of a natural disaster or health emergency while, in parallel, strengthening the ongoing risk reduction efforts supported by this operation."}},"P180781":{"id":"P180781","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Türkiye Preparedness for Public Health Emergencies Project","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-12-05T00:00:00Z","closingdate":"10/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180781","status":"Active","project_abstract":{"cdata!":"The development objective of Preparedness for Public Health Emergencies Project for Türki̇ye is to strengthen Türkiye's capacity to (i) produce vaccines, and (ii) detect and initiate a rapid response to public health emergencies. This project has four components. 1) The first component, Strengthen vaccine production capacity, will focus on preventing infectious diseases by enabling vaccine production to improve access to vaccines, which proved critical during COVID-19. 2) The second component, Strengthen national and subnational capacities for detection of and response to health emergencies, has the following sub-components: (i) Early warning and surveillance; (ii) Laboratory and diagnostics systems; and (iii) National planning and emergency response coordination for emergency-ready health systems. 3) The third component, Project Management and Monitoring, and Institutional Capacity, will support routine project management, including coordination of technical activities in all components, fiduciary functions, audits of project financial statements, environmental and social (E&S) compliance, and regular monitoring of and reporting on implementation. 4) The fourth component, Contingent Emergency Response, aims to improve the government’s response capacity in the event of an emergency."}},"P180234":{"id":"P180234","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Development Policy Lending","project_name":"Cote d'Ivoire Investment for Growth DPF3/PBG/D4D","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"310,600,000","boardapprovaldate":"2024-12-05T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180234","status":"Active","project_abstract":{"cdata!":"The development objective of Third Investment for Growth Development Policy Financing Project for Côte d'Ivoire is to: (1) strengthen competition in key enabling sectors and domestic revenue mobilization; (2) expand equitable access to health and education services; (3) promote the sustainable use of natural resources. In December 2021, Côte d’Ivoire adopted the National Development Plan (PND) 2021-2025, as its main strategic planning document to sustain high economic growth and inclusion in the medium-term. This operation directly supports the first three categories of actions of the PND and is aligned with the country’s climate change commitments and the Paris Agreement. The operation also supports outcome area four of the new corporate score card: effective macroeconomic and fiscal management. By improving tax revenue collection, it supports a stable fiscal environment that can help government manage debt and marshal resources to deliver services such as health, education, and infrastructure. The operation has three pillars: Pillar 1: Strengthen competition in key enabling sectors and domestic revenue mobilization; Pillar 2: Expand equitable access to health and education services; and Pillar 3: Promote the sustainable use of natural resources."}},"P179128":{"id":"P179128","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Eastern Türkiye Middle Corridor Railway Development Project","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"660,000,000","boardapprovaldate":"2024-12-05T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179128","status":"Active","project_abstract":{"cdata!":"The development objective of the Eastern Türkiye Middle Corridor Railway Development Project for Türkiye is to improve the rail connectivity of eastern Türkiye along the Divrigi-Kars-Georgia border railway section of the Trans-Caspian Middle Corridor. The project comprises 2 components. 1) The first component, Rehabilitation and Modernization of the Divrigi-Kars-Georgia Border Railway Line, has the following sub-components: (i) Design and infrastructure and superstructure works for the Divrigi-Kars section of the target line, plus electrification and signalization of the entire Divrigi-Kars-Georgia border line; (ii) Design and infrastructure and superstructure works for the Kars-Georgia border section of the target line; and (iii) Design supervision and construction supervision services for the rehabilitation and modernization of the Divrigi-Kars-Georgia border railway line. 2) The second component, Project Management, will finance the mobilization of a specialized firm with expertise in project management, engineering design and construction (including climate resilience), social and environmental monitoring, citizen engagement, results monitoring and evaluation, and other aspects of project implementation oversight, to staff the Project Implementation Unit (PIU)."}},"P181090":{"id":"P181090","countryname":["Kingdom of Tonga"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for Tonga Safe and Resilient Schools Project","p2a_updated_date":"2024-12-08 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2024-12-05T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181090","status":"Active"},"P505964":{"id":"P505964","countryname":["Montenegro"],"lendinginstr":"Investment Project Financing","project_name":"Montenegro Energy Sector Decarbonization Project","p2a_updated_date":"2024-12-06 00:00:00.0","totalcommamt":"20,200,000","boardapprovaldate":"2024-12-04T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505964","status":"Active","project_abstract":{"cdata!":"The development objective of the Energy Sector Decarbonization Project is to improve energy efficiency of public buildings and enable the integration of additional renewable energy capacity into the power distribution grid in Montenegro. This project has three components. 1) The first component, Improving Energy Efficiency (EE) of Public Buildings, has the twofold objective of reducing the energy consumption of selected public buildings and institutionalizing an implementation setup for EE investments in the public sector. 2) The second component, Enabling the Integration of Additional Renewable Energy Capacity into the Power Distribution Grid, has the following sub-components: (i) Retrofit of 35 kV switchgear in 100/35 kV substations; (ii) (Replacement of old MV/MV and MV/LV transformers; and (iii) Pilot investments to improve the visibility of the Low Voltage (LV) network. 3) The third component, Technical Assistance and Project Implementation Support, has the following sub-components: (i) Implemented by the MoE with fiduciary support from Technical Services Unit (TSU); and (ii) implemented by Montenegrin National Power Distribution Company (CEDIS) with fiduciary support from TSU."}},"P504398":{"id":"P504398","countryname":["Kingdom of Morocco"],"lendinginstr":"Investment Project Financing","project_name":"Morocco Second Identity and Targeting for Social Protection Project","p2a_updated_date":"2024-12-06 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-12-04T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504398","status":"Active","project_abstract":{"cdata!":"The development objective of Second Identity and Targeting for Social Protection Project for Morocco is to support the expansion of the coverage of the Digital Civil and Social Identifier (DCSID) for the Moroccan population and foreign residents and the strengthening of the inclusion of NPR and SR, including in rural and remote areas to improve the targeting and access to social protection programs. This project has three components. 1) The first component, Strengthening and extending coverage of the NPR and the operationalization of the NRA, has the following sub-components: (I) Enhancing the NPR systems; (ii) Enrollment, attribution of the DCSID, and updating of NPR data; and (iii) Operationalization of the NRA. 2) The second component, Expanding and enhancing the SR System, has the following sub-components: (i) Strengthening of the SR inclusion and information systems; and (ii) Quality of the SR data. 3) The third component, Project Management, Capacity Building, and Monitoring and Evaluation (ME), will support MoI’s strategy to strengthen the ecosystem around the NPR and the SR and warrant PDO sustainability."}},"P181463":{"id":"P181463","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Maharashtra Strengthening Institutional Capabilities in Districts for Enabling Growth Operation","p2a_updated_date":"2024-12-05 00:00:00.0","totalcommamt":"188,280,000","boardapprovaldate":"2024-12-03T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181463","status":"Active","project_abstract":{"cdata!":"The development objective of the Maharashtra Strengthening Institutional Capabilities in Districts for Enabling Growth Operation Project for India is to strengthen institutional capabilities, services, and the data ecosystem for enabling inclusive growth in districts of Maharashtra. The MahaSTRIDE Operation supports a portion of the government program for 2024–2030 across three results areas (RAs) aiming at strengthening district-level systems for enabling growth, improving access for businesses to time-bound e-government services, and strengthening state institutions for data-driven policy and decision-making. RA I: Strengthened district-level systems for enabling growth, will incentivize coordination, evidence-based planning, partnerships with private sector, and strong monitoring and evaluation (M&E) systems; RA II: Improved access for businesses to time-bound e-government services, will focus on government services captured under the BRAP issued periodically by the Department for Promotion of Industry and Internal Trade, GoI; and RA III: Strengthened state institutions for data-driven policy and decision-making, aims to build capacity for data sharing, dissemination, and use. It seeks to strengthen MITRA to enable it to lead coordination in the implementation of the One Trillion Dollar (OTD) Roadmap."}},"P505179":{"id":"P505179","countryname":["Argentine Republic"],"lendinginstr":"Program-for-Results Financing","project_name":"Supporting the Federal Policy for Enhancing Foundational Literacy","p2a_updated_date":"2024-11-29 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-11-27T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505179","status":"Active","project_abstract":{"cdata!":"The development objective of Argentina - Supporting the Federal Policy for Enhancing Foundational Literacy Project is to improve foundational learning outcomes in Argentina. The program aims to address the Program-for-Results Financing (PforR) Theory of Change (TOC) challenges by focusing on two Results Areas (RAs) supporting the National Literacy Plan (PNA) axes and the government program. Each of the RAs have a specific objective and comprise a specific set of budgetary programs that will be supported with Bank financing. RA 1: Improving the quality of foundational literacy, aims to support programs, activities, initiatives, and TA to improve the level of and bridge the existing provincial disparities in terms of learning outcomes, particularly literacy, in primary schools. RA 2: Strengthening federal financing, information, and evaluation systems for impact, aims to improve the existing information and evaluation systems, both at the national and subnational level, as well as to improve the coordination between government levels. The PforR will support the PNA government program for the period 2024-2028, considering the strategic program budget lines and activities that are linked to two RAs that are key to achieving the PforR development goals."}},"P505675":{"id":"P505675","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Integrated Early Childhood Development Project","p2a_updated_date":"2024-11-29 00:00:00.0","totalcommamt":"700,000,000","boardapprovaldate":"2024-11-27T00:00:00Z","closingdate":"12/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505675","status":"Active","project_abstract":{"cdata!":"The development objective of the Integrated Early Childhood Development (ECD) Project is to improve the effectiveness and efficiency of cash transfer programs for vulnerable populations, including pregnant women and children up to 48 months, and to increase their access to early childhood development services in targeted areas of Argentina. This project has four components. The first component, Improving cash transfer programs for households with pregnant women and children up to 48 months, will improve the effectiveness and efficiency of the GoA’s cash transfer programs Universal Pregnancy Allowanc (AUE), Universal Child Allowance (AUH) for children up to 48 months of age, Nutritional Supplemental Allowance (ACN), and Comprehensive Health Care Allowance (ACSI). The second component, Enhancing access to prioritized ECD services for vulnerable populations, has the following sub-components: (i) Enhancing the capacities for the management of Federal Program for Early Childhoood (PFPI) at the national level; (ii) Support for quality improvement of Early Childhood Development Centers (CDI) in prioritized districts; and (iii) Support the expansion of Family Support Services in prioritized districts. The third component, Strengthening integration of human capital information systems, will contribute to improve targeting of social benefits in Argentina and for the first time move toward the creation of an integrated social registry, leveraging existing systems and parallel financing from the Inter-American Development Bank (IDB). The fourth component, Support for the Ministry of Human Capital  (MCH) in project management, will support the General Directorate of Sectoral and Special Programs and Project (DGPYPSYE) capacity in financial management (FM), procurement, environmental and social (E&S), and monitoring functions, and the technical verification for Components 1 and 2."}},"P506960":{"id":"P506960","countryname":["Republic of Seychelles"],"lendinginstr":"Development Policy Lending","project_name":"Seychelles First Sustainable and Inclusive Growth Development Policy Operation","p2a_updated_date":"2024-11-29 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-27T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506960","status":"Active","project_abstract":{"cdata!":"The Development Policy Operation (DPO) supports the Government of the Republic of Seychelles’ (GoS) to: (i) strengthen financial stability and the business environment; (ii) promote fiscal transparency; and (iii) enhance environmental and social resilience. The DPO is the first in a programmatic series of two operations and will provide an IBRD loan of US15 million dollars. The DPO aligns with the Seychelles National Development Strategy (NDS) 2024- 2028 which outlines its reform priorities to achieve diversified, inclusive, and climate-resilient economic and social development. Given Seychelles’ high-income status (Gross National Income (GNI) per capita of US16,940 dollars, Atlas method), the DPO adheres to the principles of engagement for countries above the Graduation Discussion Income, to help address the country’s limited access to international markets and continued need for institutional strengthening. The DPO provides a strong platform to drive capacity development via technical assistance, accelerate the completion of high-quality reforms, and continue to support the post-COVID fiscal consolidation and decline in public debt towards the GoS’ 50 percent of Gross Domestic Product (GDP) target by 2030. The DPO series builds on the strong implementation and results of four consecutive DPOs over the past four years, highlighting the GoS’ prudent macroeconomic management, its commitment to consistent, steady reforms, and its capacity for implementation, despite being a small island state. The DPO aligns with the World Bank Group’s Country Partnership Framework (CPF) for Seychelles FY25-FY30. General elections are scheduled for September 2025. With well-established democratic institutions, the political environment is expected to remain stable."}},"P176924":{"id":"P176924","countryname":["Republic of The Gambia"],"lendinginstr":"Program-for-Results Financing","project_name":"The Gambia Public Administration Modernization for Citizen Centric Service Delivery","p2a_updated_date":"2024-11-29 00:00:00.0","totalcommamt":"47,700,000","boardapprovaldate":"2024-11-27T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176924","status":"Active","project_abstract":{"cdata!":"The development objective of Public Administration Modernization for Citizen Centric Service Delivery Project for Gambia, The is to enhance domestic resource mobilization and financial reporting, human resource management, and citizen engagement in education. The program for results (PforR) focuses on a subset of RF-NDP priority actions related to enhancing domestic resource mobilization and financial reporting, human resources management, and citizen engagement in the education sector. It will support implementation of the Recovery Focused National Development Plan (RF-NDP) 2023-2027. The PforR Program includes a combination of upstream and downstream interventions. It includes: (i) Results Area 1: Enhanced Domestic Resource Mobilization and Financial Reporting, which supports upstream or government-wide improvements with downstream externalities; (ii) Results Area 2: Enhanced Human Resource Management, including a specific focus on the education and health sectors, contributing to better management of the public administration; and (iii) Results Area 3: Enhanced Citizen Engagement in Education which focuses on downstream transparency and citizen engagement in the education sector, including for the benefit of demand side actors."}},"P500764":{"id":"P500764","countryname":["Republic of Indonesia"],"lendinginstr":"Investment Project Financing","project_name":"Indonesia Supporting Health Transformation Project (I-SeHat)","p2a_updated_date":"2024-11-29 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-27T00:00:00Z","closingdate":"1/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500764","status":"Active","project_abstract":{"cdata!":"The development objective of the Supporting Health Transformation Project for Indonesia is to improve coordination of partner support and enhance integration of cross-cutting themes in Indonesia’s health system transformation agenda, with a focus on primary health care and digital health. This project has two components: the first component, Improving Coordination of Partner Support, aims to enhance the coordination of development partners in supporting capacity-building activities to improve the Ministry of Health’s (MOH) capacities in leading, coordinating, and managing development partners' support in loan and grant operations for the implementation of the Health System Transformation Agenda (HSTA). The second component, Improving Integration of Cross-cutting Issues, supports knowledge creation and technical capacity-building activities for the implementation of HSTA in a manner that ensures improved integration and intersectionality of relevant cross-cutting issues, including gender, people with disabilities, climate change, quality assurance, and geospatial equity, as well as monitoring, supervision, and evaluation of these activities."}},"P178768":{"id":"P178768","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Morocco Municipal Solid Waste Management Support Program","p2a_updated_date":"2024-11-28 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-11-26T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178768","status":"Active","project_abstract":{"cdata!":"The objective of the Municipal Solid Waste Management Support Program for Morocco is to enhance the financial and environmental performance of the Municipal Solid Waste Management sector in the program area. Building on both the achievements and the lessons learned from the PNDM, the GoM has laid down the foundations for a new MSW management vision. To tackle the persisting environmental and financial challenges in MSW, the GoM formulated a new sector development program, the PNVDM spanning over twelve (12) years (2023-2034), with an estimated investment plan of US 2.18 billion dollars. The PNVDM materializes the Government’s vision to gradually shift to a more environmentally sustainable MSW service management, through minimized landfilling and improved waste recovery, while also keeping a focus on the financial viability of the proposed business models. In this context, the PNVDM aims at (a) ensuring a universal coverage of professionalized waste collection in urban areas; (b) improving MSW valorization rates, from 7 to 25 percent in 2034; (c) upgrading the country’s-controlled landfills and establishing new ones when relevant; and (d) closing of a number of abandoned uncontrolled landfills. To ensure enhanced sector performance and business models viability, private sector participation has been embedded as one of the key pillars of the PNVDM with the signing of a Memorandum of Understanding (MoU) between key sector public stakeholders and the cement industry to secure the offtake of RDF by cement factories. This would allow for the development of viable industrial processes for the recycling and recovery of MSW and hence minimize waste landfilling, in line with the objectives of the PNVDM26. A detailed description of investments to be carried out under the PNVDM is provided in the Program’s technical assessment’s background document. Complementing the investment efforts, the GoM has launched a set of policy, institutional and regulatory reforms as well as capacity building activities, to support the shift in the MSW management systems towards a more integrated, environmentally, and financially sustainable path."}},"P181372":{"id":"P181372","countryname":["Republic of Costa Rica"],"lendinginstr":"Development Policy Lending","project_name":"Costa Rica Social Risk Management DPL DDO","p2a_updated_date":"2024-11-27 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-11-25T00:00:00Z","closingdate":"12/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181372","status":"Active","project_abstract":{"cdata!":"The objective of the Social Risk Management Development Policy Loan with a Deferred Drawdown Option Program is to strengthen the targeting and efficiency of Costa Rica’s social protection system. It is comprised of two pillars that reflect priorities identified in the 2023 Costa Rica SCD update: improvements of social assistance’s targeting and reforms to lessen fragmentation and enhance coordination. The first pillar focuses on improving the poverty targeting of social spending in Costa Rica by strengthening the uptake, robustness, and inclusiveness of its integrated social registry. The second pillar addresses the need to enhance the efficiency of social spending in Costa Rica by reducing fragmentation, improving and coordinating the delivery of social assistance programs, and reducing costs of the delivery of social protection interventions. The stand-alone DPL/DDO modality offers the option of quickly mobilizing liquidity to finance priority spending, including if Costa Rica is hit by climate, social, or economic shocks and needs to cover a targeted and temporary social assistance response. The DPL-DDO supports the government in developing and implementing policies aimed at improving social spending, strengthening adaptation to climate change, and improving opportunities, with a focus on poor and vulnerable groups. The operation also supports outcome area one of the new corporate-score card: protection for the poorest. By improving the targeting and coverage of social assistant programs among the lower income segments of the population the operation directly contributes to advancing these outcome areas. Additionally, by helping improve the adaptiveness of the social protection system, the operation contributes to the prevention and mitigation of the impact of climate shocks among these segments."}},"P179935":{"id":"P179935","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"Enhancing Landscape and Ecosystem Management (ELEMENT) Project","p2a_updated_date":"2024-11-27 00:00:00.0","totalcommamt":"225,520,000","boardapprovaldate":"2024-11-25T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179935","status":"Active","project_abstract":{"cdata!":"The objective of the Enhancing Landscape and Ecosystem Management (ELEMENT) Project for India is to improve landscape management and increase benefits for targeted forest dependent communities in Tripura and Nagaland. There are five components to the project, the first component being strengthening capacities for integrated landscape management. This component includes four subcomponents: strengthening the capacity of participating states relevant institutions in participatory planning, implementation, and monitoring; strengthening capacity of participating states institutions for Research and Development (R&D) and value chain development; Strengthening the capacity of existing and new community institutions for decentralized natural resources management; and knowledge and information sharing on innovation. The second component is the restoring landscapes for improved ecosystem services. This component includes two subcomponents: developing community landscape management plans, and implementation of community landscape management plans in targeted catchments. The third component is the enhancing landscape-based value-chains for economic transformation. This component includes two subcomponents: agroforestry, forestry, and NTFP in value chain development and forest landscape enterprises and augmenting eco-tourism opportunities. The fourth component is the project management, monitoring, and evaluation.  Finally, the fifth component is the Contingent Emergency Response Component (CERC). Provision of immediate response to an Eligible Crisis or Emergency, as needed. This will include reallocation of loan proceeds from other components to provide immediate response (which may include recovery and reconstruction support) following an eligible crisis or emergency, as needed."}},"P507190":{"id":"P507190","countryname":["Barbados"],"lendinginstr":"Investment Project Financing","project_name":"Barbados – Beryl Emergency Response and Recovery Project","p2a_updated_date":"2024-11-25 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-21T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P507190","status":"Active","project_abstract":{"cdata!":"The development objective of the Beryl Emergency Response and Recovery Project for Barbados is to: (i) restore disaster-affected targeted sectors; (ii) enhance climate-resilient infrastructure; and (iii) strengthen emergency preparedness and response capacity. This project has four components. 1) The first component, Immediate recovery from a hurricane, has the following sub-components: Recovery of the affected sectors; Repair and rehabilitation of Bridgetown Port; and Climate resilient coastal protection.2) The second component, Strengthening Barbados' resilience for future catastrophic events, has the following sub-components: (i) Strengthening the emergency management services; and Studies and support for port and fisheries infrastructure resilience. 3) The third component, Contingent emergency response (CERC), will finance eligible response and early recovery activities in the event of a disaster caused by natural hazards. 4) The fourth component, Project management, will be implemented by the Ministry of the Environment and National Beautification, Green and Blue Economy (MENB) through a dedicated Project Execution and Coordination Unit (PECU)."}},"P506846":{"id":"P506846","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Support to the Sustainability and Equity of Public Transport Project","p2a_updated_date":"2024-11-21 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-19T00:00:00Z","closingdate":"12/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506846","status":"Active","project_abstract":{"cdata!":"The objective of the  Support to the Sustainability and Equity of Public Transport Project is to improve the affordability of bus public transport for vulnerable populations in Argentina and the sustainability of the bus public transport system in the Metropolitan Area of Buenos Aires. The project is structured into three components. The first component involves the provision of demand-side subsidies to public transport users through the national government’s social fare program and the integrated fare system. The second focuses on institutional strengthening activities. This component includes five subcomponents: improvement of the social fare program, improvement of the bus system supply, improvement of metropolitan transport governance, strengthening bus public transport inclusion, and climate change mitigation and adaptation in bus transport.  The third supports project management activities."}},"P504621":{"id":"P504621","countryname":["Republic of the Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Sudan Primary Education Emergency Support Project","p2a_updated_date":"2024-11-20 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-19T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504621","status":"Active","project_abstract":{"cdata!":"The development objective of Primary Education Emergency Support Project is to support reopened schools in target states and learning continuity in the Republic of the Sudan. This project has three components. 1) The first component, Provision of School Grants, has the following sub-components: Provision of school grants; and Capacity building of school management. 2) The second component, Facilitating Learning Continuity, has the following sub-components: Implementation of remedial program for targeted grades in selected public primary schools; Supporting learning during school closures; and Enhancing the remote learning provision. 3) The third component, Project Management, Coordination, Technical Assistance, and M&E, has the following sub-components: Project management, coordination, and monitoring; Knowledge generation; and Development of capacity of national experts to strengthen local capacity."}},"P506430":{"id":"P506430","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Supporting the Transition to a Sustainable Electricity Sector in Argentina","p2a_updated_date":"2024-11-21 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-19T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506430","status":"Active","project_abstract":{"cdata!":"The objective of the Supporting the Transition to a Sustainable Electricity Sector Project is to strengthen institutional capacity to rationalize energy subsidies in Argentina. There are two components to the project, the first component being project management, capacity building, and instruments to foster sector sustainability. This component will focus on strengthening the GoA’s capabilities for the implementation of component 2 to ensure ongoing efforts and potential subsidy reforms can be effective, efficient, and clearly communicated. The component will also seek to support the improvement of capacities to assess and address key impacts of subsidy reform, particularly on the most vulnerable households, as well as key drivers of the energy sector’s sustainability. This component includes two subcomponents: project management and strengthening institutional capacities and processes to improve sector sustainability. The second component is the financing rationalized electricity subsidies for users with validated eligibility criteria."}},"P500565":{"id":"P500565","countryname":["Republic of Kazakhstan"],"lendinginstr":"Investment Project Financing","project_name":"Transport Resilience and Connectivity Enhancement Project (Jezkazgan-Karagandy Section of TCITR (Middle Corridor))","p2a_updated_date":"2024-11-18 00:00:00.0","totalcommamt":"326,630,000","boardapprovaldate":"2024-11-15T00:00:00Z","closingdate":"6/30/2032 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500565","status":"Active","project_abstract":{"cdata!":"The development objective of Transport Resilience and Connectivity Enhancement Project is to strengthen the resilience of transport systems in Kazakhstan and improve climate-adapted road connectivity along the Jezkazgan - Karagandy section of the Middle Corridor. This project has three components. 1) The first component, Resilient and Safe Road Connectivity, has the following sub-components: (i) Corridor Connectivity; (ii) Last Mile Connectivity; (iii) Road Sustainability; and (iv) Safety Audit. 2) The second component, Transport Systems Development, has the following sub-components: (i) Framework for Transport Resilience, Decarbonization, and Safer Roads; and (ii) Multimodal Middle Corridor Development. 3) The third component, Project Management, will support Project implementation by establishing and operating a Project Implementation Unit (PIU) within KAZh and utilizing specialist consulting services."}},"P505025":{"id":"P505025","countryname":["Republic of Mali"],"lendinginstr":"Investment Project Financing","project_name":"Mali Community Resilience and Inclusive Services Project - Malidenko","p2a_updated_date":"2024-11-18 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-14T00:00:00Z","closingdate":"11/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505025","status":"Active","project_abstract":{"cdata!":"The development objective of Community Resilience and Inclusive Services Project for Mali is to improve access to basic services responsive to community priorities in at-risk areas. This project has four components. 1) The first component, Provision of essential village infrastructure and services, will finance socio-economic infrastructure and agricultural livelihood activities at the village level. 2) The second component, Provision of essential commune infrastructure and services, will finance more substantial investments at the municipal level, with the criterion that they benefit several villages. 3) The third component, Restoring trust and reconciliation through inclusive planning and facilitation, will finance social and technical facilitation. 4) The fourth component, Project Management, will finance the operational costs of the project, including staff, technical assistance, monitoring and evaluations, the management information system, training, travel, fiduciary and environmental and social risk management, establishment of a grievance redress mechanism, equipment, and other management costs."}},"P178190":{"id":"P178190","countryname":["Mongolia"],"lendinginstr":"Investment Project Financing","project_name":"Third Energy Sector Project","p2a_updated_date":"2024-11-15 00:00:00.0","totalcommamt":"51,800,000","boardapprovaldate":"2024-11-13T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178190","status":"Active"},"P181127":{"id":"P181127","countryname":["Republic of the Philippines"],"lendinginstr":"Development Policy Lending","project_name":"Philippines Second Digital Transformation DPL","p2a_updated_date":"2024-11-15 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2024-11-12T00:00:00Z","closingdate":"3/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181127","status":"Active","project_abstract":{"cdata!":"The development objective of Second Digital Transformation Development Policy Loans Project for Philippines is to support government reforms to foster an enabling environment for greater digital technology adoption by (a) improving digital transformation of government and digital infrastructure policies, (b) expanding financial inclusion through digital finance and (c) boosting business growth in digital services. This DPL program is aligned with the goals of the Paris Agreement and is expected to strengthen resilience to natural disasters and climate change and reduce emissions. The reform program, while not directly captured in the Philippines NDCs (submitted 2021) and National Climate Change Action Plan (2011-2018), will not hinder the achievement of the country’s climate goals and commitment. The reform program builds on the Philippines Country Climate and Development Report (CCDR), which emphasizes the intertwined objectives of green, resilient, and inclusive development and the importance of the digital economy in achieving this set of goals. On mitigation, prior actions (PAs) 1, 2, 3, 4, 5, 6, and 7 are not likely to cause a significant increase in GHG emissions. While PA8 could spur greater investment in air transportation services and cause an increase in GHG emissions, it is not likely to introduce or reinforce a persistent barrier to transition to the Philippines’ low-GHG emissions development pathways."}},"P504773":{"id":"P504773","countryname":["Ukraine"],"lendinginstr":"Program-for-Results Financing","project_name":"Supporting Reconstruction through Smart Fiscal Governance (SURGE)","p2a_updated_date":"2024-11-11 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2024-11-07T00:00:00Z","closingdate":"3/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504773","status":"Active","project_abstract":{"cdata!":"The development objective of the Supporting Reconstruction Through Smart Fiscal Governance: Surge Program for Results for Ukraine is to establish the institutional foundations for implementation and financing of climate-smart recovery and reconstruction. The Ukraine facility plan outlines the country’s vision for medium-term socio-economic growth and aims to accelerate Ukraine’s European Union (EU) accession path, with targeted reforms across key sectors to promote growth and attract priority investments while aligning with EU standards. The facility establishes a framework that coordinates reforms and investments in public administration, fiscal governance, anti-corruption, digital transition, and green transition to enhance resilience, ensure efficient public funds use, and promote sustainable growth, in line with EU standards and principles of good governance and transparency."}},"P180429":{"id":"P180429","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Bahia Sustainable Rural Development Project","p2a_updated_date":"2024-11-11 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-11-07T00:00:00Z","closingdate":"10/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180429","status":"Active","project_abstract":{"cdata!":"The development objective of the Bahia Sustainable Rural Development Project for Brazil is to enhance resilience of family farmers in targeted states. The project comprises of five components. The first component, increasing agricultural productivity, access to markets, and resilience to shocks will finance technical studies, technical assistance (TA), and matching grants to co-finance business and the development plans of Producer Organizations (POs) and to support investments in climate-smart agriculture (CSA). It consists of following sub-components: (i) development of business plans and strengthening capacities of POs and family farmers; (ii) implementation of business and ethno-development plans; and (iii) improving access to complementary agricultural public policies. The second component, supplying safe drinking water services to rural communities will fund water infrastructure to improve food and nutrition security of low-income rural households through the expansion of access to drinking water services from rural dwellers, its main objective will be to support the Bahia’s efforts to develop a rural water state policy and bringing about institutional changes in the water sector to mainstream a strategy for managing rural water services. It consists of following sub-components: (i) strengthening and consolidating the multi-community management model for rural water supply services; and (ii) investments in rural water infrastructure and monitoring of service delivery. The third component, designing and scaling innovative solutions for agrifood production and commercialization will finance the scaling of innovations that can have a positive impact on the long-term sustainability of the interventions on POs (Component 1). It consists of following sub-component: (i) scaling innovations to improve productivity and access to markets. The fourth component, contingency emergency response component (CERC) is a mechanism for Borrowers (Bahia) to access funds rapidly to respond to an eligible crisis or disasters and health emergency. The fifth component, project management and institutional development will support the participation of the Project Management Unit (PMU) in the multiphase programmatic approach (MPA) coordination, learning and, monitoring efforts."}},"P506476":{"id":"P506476","countryname":["Ukraine"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening Government Capacity for Fiscal Reform Implementation","p2a_updated_date":"2024-11-06 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-11-05T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506476","status":"Active","project_abstract":{"cdata!":"The development objective of Strengthening Government Capacity for Fiscal Reform Implementation Project for Ukraine is to enhance the government's capacity to plan and finance recovery and reconstruction. This project has five components. 1) The first component, Public Investment Management for Reconstruction, will finance advisory services and training to strengthen public investment management for reconstruction. 2) The second component, Local Urban Planning, will finance advisory services and capacity building to support the strengthening of urban planning systems at the local levels and the development of comprehensive spatial development plans in cities. 3) The third component, Local Government Fiscal Governance for Recovery, will finance advisory services and capacity building to strengthen financial management, resource allocation, and budget transparency. 4) The fourth component, Integrity and Compliance in Revenue Administration, will finance advisory services and capacity building to enhance integrity and compliance in revenue administration processes. 5) The fifth component, Public Procurement Management for Recovery, supports the review of procurement and budgeting systems, policy preparation for advance contracting, and addressing implementation bottlenecks for national and IFI-funded projects."}},"P178254":{"id":"P178254","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"Kerala Climate Resilient Agri- Value Chain Modernization (KERA) Project","p2a_updated_date":"2024-11-04 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-10-31T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178254","status":"Active","project_abstract":{"cdata!":"The objective of the Kerala Climate Resilient Agri-Value Chain Modernization (KERA) Project is to promote the resilience and commercialization of Kerala’s food and agriculture sector. There are five components to the project, the first component being climate resilience in agriculture. This component focuses on strengthening the agricultural production base in the face of CC across all 14 districts in Kerala and piloting mechanisms for encouraging farmers to enable reductions in emissions through low carbon rice. This component includes two subcomponents: scale-up adoption of CRA practices and supporting low carbon paddy production. The second component is the enhancing small-holder commercialization for value addition. This component augments the commercialization of market-based agricultural production systems by investing in market linkages and promoting climate smart value addition. This component includes three subcomponents: the first subcomponent provides support to generate up to 150 productive alliances (PAs) between farmers (or farmer groups, especially FPCs) and agribusinesses, the second subcomponent will support the replanting of certified climate resilient varieties of coffee, cardamom and rubber in a total of 8 districts, with the on-farm investment costs largely leveraged from the financial sector via a partial credit guarantee (PCG). Finally, subcomponent the third subcomponent will develop context-specific measures to address land-related issues in Kerala. The third component is the strengthening agribusiness and the food system. The fourth component is the project management. Finally, the fifth component is the contingent emergency response component"}},"P181457":{"id":"P181457","countryname":["Republic of Benin"],"lendinginstr":"Development Policy Lending","project_name":"Benin Second Boosting Inclusive Growth and Resilience DPF and PBG","p2a_updated_date":"2024-11-04 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-10-31T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181457","status":"Active","project_abstract":{"cdata!":"The development objective of Second Boosting Inclusive Growth and Resilience Development Policy Financing (DPF) Project for Benin is to support the recipient's efforts to: (i) enhance private sector-led growth, (ii) boost domestic revenue collection, and (iii) strengthen social and climate resilience. The operation is aligned with the priority areas identified in the PAG II 2021-2026 as well as with other World Bank strategies. The program is also aligned with the Government of Benin (GoB’s) civilian-centered strategy to mitigate security risks in the North. The DPF series is aligned with Benin’s climate change commitments and the goals of the Paris Agreement. The reform program supports the green, resilient, and inclusive development agenda by strengthening the country’s adaptation and resilience to climate change through improved prevention, preparedness, and response capacity. The second Boosting Inclusive Growth and Resilience (BIGR) DPF supports reforms under three pillars: Pillar 1 – Enhancing private sector-led growth; Pillar 2 – Boosting domestic revenue collection; and Pillar 3 – Strengthening social and climate resilience."}},"P181746":{"id":"P181746","countryname":["Republic of Benin"],"lendinginstr":"Development Policy Lending","project_name":"Benin Boosting Inclusive Growth and Resilience DPF2 FY25 Guarantee","p2a_updated_date":"2024-11-12 00:00:00.0","totalcommamt":"221,500,000","boardapprovaldate":"2024-10-31T00:00:00Z","closingdate":"12/13/2039 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181746","status":"Active"},"P505616":{"id":"P505616","countryname":["Ukraine"],"lendinginstr":"Program-for-Results Financing","project_name":"Resilient, Inclusive and Sustainable Enterprise Program for Results","p2a_updated_date":"2024-11-04 00:00:00.0","totalcommamt":"3,429,890,000","boardapprovaldate":"2024-10-31T00:00:00Z","closingdate":"10/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505616","status":"Active","project_abstract":{"cdata!":"The objective of the Resilient, Inclusive and Sustainable Enterprise Program for Results is to improve the enabling environment for a sustainable private sector-led recovery in Ukraine. Successful recovery and reconstruction, and progress toward European Union (EU) standards, will require significant institutional reforms that both strengthen public sector capacity and facilitate a resilient and competitive private sector. Implementation of extensive reforms, both prior to February 2022 and during the past two years, has played a major role in enabling the government to deliver on its core functions and initiate recovery. But further changes are needed. Experience from other countries highlights the central role of government in managing resource allocation and ensuring coordination during the reconstruction process. Moreover, given the scale of financing needs and the capacity of the Ukrainian private sector, there is a significant opportunity and need to take full advantage of the potential for the private sector to finance and execute recovery and reconstruction investments. In this context, the Ukraine Plan, which includes economy-wide and sectoral reforms, increasing the capacity to absorb investment, and crosscutting issues such as European integration, digital transformation, green transition, environmental protection, as well as human capital, plays a critical role over the coming years. The National Economic Strategy (NES) (2021-2030), the Ukraine Plan (2024-2027) and Ukraine’s Reforms Matrix 2024 lay out key reforms to support SMEs and stimulate business activity. Key relevant reform areas of the NES focus on entrepreneurship development, regulatory environment, investment attractiveness and international economic policy and trade. The recently adopted Ukraine Plan (2024-2027) focuses on three key directions as regards to the private sector reform agenda: improving the regulatory environment, facilitating access to finance and markets, and closing the gap between EU and Ukrainian policy frameworks, through a series of micro, sector-wide reforms with the transition to a green, digital, and inclusive economy being stipulated as cross-cutting themes. Relevant reforms are also outlined in Ukraine’s Reforms Matrix’s pillar on economic competitiveness."}},"P180965":{"id":"P180965","countryname":["Kingdom of Tonga"],"lendinginstr":"Investment Project Financing","project_name":"Health Enhancement and Resiliency in Tonga Project","p2a_updated_date":"2024-11-01 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-10-30T00:00:00Z","closingdate":"6/28/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180965","status":"Active","project_abstract":{"cdata!":"The objective of the Health Enhancement and Resiliency in Tonga Project is to strengthen the management of non-communicable diseases (NCDs) in Tonga, increase the availability of climate resilient health services in the Northern Islands, and, in case of an eligible crisis or emergency, respond promptly and effectively to it. There are four components to the project. The first component being strengthen Tonga’s prevention, detection, and control of NCDs. This component includes three subcomponents: refine the model of care to provide more effective integrated prevention, detection, early intervention, and management of NCDs, Develop priority HRH, and support behavior change communication and policy change for NCD risk reduction. The second component is to improve the accessibility to resilient health services in the Northern Islands. This component will improve the accessibility to quality and climate-resilient infrastructure in Vava’u by retrofitting, rebuilding, and equipping PWNH. This component includes two subcomponents: infrastructure support for a resilient and appropriately designed PWNH hospital, and essential equipment and supplies for PWNH and health facilities in the Northern Islands. The third component is the project and portfolio management. This component includes two subcomponents: project management with enhanced hospital development advisory support, and Central Services Unit (CSU), capacity building, and technical assistance. Finally, the fourth component is the Contingent Emergency Response Component (CERC)."}},"P180807":{"id":"P180807","countryname":["Samoa"],"lendinginstr":"Investment Project Financing","project_name":"Digitally Connected and Resilient Samoa Project","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"20,050,000","boardapprovaldate":"2024-10-18T00:00:00Z","closingdate":"10/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180807","status":"Active","project_abstract":{"cdata!":"The development objective of the Digitally Connected and Resilient Samoa Project for Samoa is to increase resilient, and inclusive use, of broadband internet and enhancing delivery of digitally enabled services. The project comprises of three components. The first component, digital connectivity and digital government infrastructure will support the development of climate and disaster-resilient national digital connectivity and digital government infrastructure in Upolu and Savai’i. It consists of following sub-components: (i) National fiber network to improve service delivery; (ii) enhancement of the capacity, coverage, security, and resilience of the government’s intranet; and (iii) upgrade and establishment of secure and resilient government data center and support for the rollout of broadband pilot(s). The second component, strengthening and enhancing the enabling environment for the digital transformation will provide support for the design and implementation of the Public-Private Partnerships (PPP) arrangements under component 1, strengthen the Recipient’s enabling environment for digital government and the digital economy, and provide ongoing support to traditional regulatory priorities for the telecommunications sector, particularly to promote investment, technological innovation and evolution, and the long-term interests of users of digital services. It consists of following sub-components: (i) transactional, policy and regulatory support for PPP and feasibility assessment; (ii) regulatory support, policy and legal framework for digital government and economy; and (iii) enhancement of cybersecurity. The third component, project implementation support will finance technical and operational assistance for project management and implementation."}},"P181584":{"id":"P181584","countryname":["Republic of Haiti"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing: Haiti Renewable Energy For All","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-10-18T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181584","status":"Active"},"P181456":{"id":"P181456","countryname":["Samoa"],"lendinginstr":"Investment Project Financing","project_name":"Samoa Finance Sector Resilience and Development Project","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"21,000,000","boardapprovaldate":"2024-10-18T00:00:00Z","closingdate":"12/17/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181456","status":"Active"},"P181624":{"id":"P181624","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing: Türkiye Irrigation Modernization Project","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"95,000,000","boardapprovaldate":"2024-10-17T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181624","status":"Active"},"P507316":{"id":"P507316","countryname":["St. Vincent and the Grenadines"],"lendinginstr":"Investment Project Financing","project_name":"Saint Vincent and the Grenadines: Beryl Emergency Resilient Recovery Project","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-10-17T00:00:00Z","closingdate":"10/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P507316","status":"Active"},"P501648":{"id":"P501648","countryname":["Republic of Kenya"],"lendinginstr":"Program-for-Results Financing","project_name":"Kenya Secondary Education Equity and Quality Improvement Program","p2a_updated_date":"2024-10-20 00:00:00.0","totalcommamt":"540,000,000","boardapprovaldate":"2024-10-17T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501648","status":"Active","project_abstract":{"cdata!":"The development objective of the Secondary Education Equity and Quality Improvement Program for Kenya is to improve equitable access to quality secondary education and strengthen systems. The project comprises of following result areas (RA): RA 1: expand equitable access to quality secondary education; RA 2: improve teaching quality in junior school; and RA 3: strengthen systems for equitable service delivery in secondary education."}},"P181295":{"id":"P181295","countryname":["Solomon Islands"],"lendinginstr":"Investment Project Financing","project_name":"Community Access and Urban Services Enhancement Project II","p2a_updated_date":"2024-10-17 00:00:00.0","totalcommamt":"20,200,000","boardapprovaldate":"2024-10-15T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181295","status":"Active","project_abstract":{"cdata!":"The objective of the Second Community Access and Urban Services Enhancement Project is to improve access to climate resilient infrastructure and services, enhance economic inclusion, and strengthen the capacity of public authorities to deliver services in Targeted Urban Centers. There are five components to the project. The first component being resilient township development.  This component will enhance economic productivity and growth, as well as climate and disaster resilience by improving access to basic services and climate-resilient economic infrastructure in Honiara City and selected townships, aligning with NUP Goals 3 and 5. The second component is the safe and inclusive communities. This component will enhance the safety and resilience of residents in informal, densely populated settlements by improving access to community infrastructure and waste collection services, and by building local capacity for essential infrastructure maintenance. The third component is the enhanced urban productivity. This component includes three subcomponents: Literacy and Numeracy Skills Development, Work Readiness and Skills Training, and Support and Referral Services. The fourth component is the land administration and urban management and maintenance. This component will develop the capacity, tools, policies, and resources for improved urban management focused on land administration, revenue mobilization systems and management of public assets. This component includes three subcomponents: land administration, revenue mobilization, and urban management and maintenance. Finally, the fifth component is the project management. This component will support joint Project management, oversight, monitoring, and evaluation audits, communications, media support, technical assistance, training, financial management, procurement, and provision of goods and operating costs."}},"P178237":{"id":"P178237","countryname":["Federated States of Micronesia"],"lendinginstr":"Investment Project Financing","project_name":"Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience: Federated States of Micronesia (FSM PROPER)","p2a_updated_date":"2024-10-17 00:00:00.0","totalcommamt":"56,000,000","boardapprovaldate":"2024-10-15T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178237","status":"Active","project_abstract":{"cdata!":"The objective of the Pacific Islands Regional Oceanscape Program: Second Phase for Economic Resilience for Federated States of Micronesia is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend. There are four components to the project, the first component being oceanic fisheries. This component includes two subcomponents: Strengthening the enabling environment for oceanic fisheries and maximizing the value of oceanic resources to the FSM. The second component is the coastal fisheries. This component supports improved management of coastal fisheries through strengthening institutional and legal capacity. This component includes three subcomponents: strengthening coastal fisheries institutional and legal framework, delivering critical marina infrastructure, and fish processing and value chain addition. the third component is the marine habitats. This component addresses impacts of land-based and marine pollution on coastal and marine ecosystems, which affect the health of fish stocks and fisheries, as well as sanitary conditions. This component includes two subcomponents: environmental protection and marine habitat management, and Improvements to waste management. Finally, the fourth component is the project management. The project has an extensive array of stakeholders and implementing agencies and is set within an FCV country context with capacity and geographic constraints. As such, the Project is investing in robust project management to facilitate timely implementation of activities and to reflect the lessons from implementation of PROP."}},"P178842":{"id":"P178842","countryname":["Republic of Peru"],"lendinginstr":"Investment Project Financing","project_name":"Improving Lima Traffic Management and Supporting Sustainable Transport Project","p2a_updated_date":"2024-10-17 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-10-15T00:00:00Z","closingdate":"10/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178842","status":"Active","project_abstract":{"cdata!":"The objective of the Improving Lima Traffic Management and Supporting Sustainable Transport Project  using the Multiphase Programmatic Approach (MPA) for Peru is to increase accessibility to job opportunities for the province of Lima population in a green, safe, and inclusive urban mobility system. There are five components to the project, the first component being Traffic lights system. This component focuses on expanding and improving the centralized traffic lights network and strengthening the TCC, including the application of Traffic Signal Priority (TSP).  This component includes two subcomponents: : Centralized traffic lights network, and Traffic Control Center. The second component is the Automated traffic violation detection system. This component will implement an automated Traffic Violation Detection and Control Center (TVDCC) and equip the intersections with the highest rates of traffic-related incidents with an electronic traffic violation detection system, prioritizing control of traffic violations that affect safety of NMT and efficient flow of public transport services. The third component is the Safe intersections and neighborhoods. This component will finance the implementation of low-cost, high-impact interventions at intersections with high crash rates and improve safety and public life in selected neighborhoods to promote mode shift to walking and cycling. This component includes two subcomponents: immediate traffic actions plan, and traffic calming zones. The fourth component is the urban mobility, cycle-infrastructure and complete streets. This component will implement bicycle infrastructure as part of comprehensive complete streets interventions to improve travel conditions for pedestrians and cyclists and integrate NMT with public transport, thereby promoting modal shift from motorized modes. Finally, the fifth component is the project management and capacity building. This component includes two subcomponents: technical and administrative project management, and environmental and Social management, and sectoral strategies."}},"P176317":{"id":"P176317","countryname":["Republic of the Philippines"],"lendinginstr":"Investment Project Financing","project_name":"Philippines Digital Infrastructure Project","p2a_updated_date":"2024-10-14 00:00:00.0","totalcommamt":"287,240,000","boardapprovaldate":"2024-10-10T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176317","status":"Active","project_abstract":{"cdata!":"The development objective of the Digital Infrastructure Project for Philippines is to improve climate resilient, secure, and inclusive broadband connectivity. The project has five components: (i) backbone network, (ii) middle-mile network, (iii) access network (Last-Mile), (iv) network security, and (v) project management support. The first three components of the Project will invest in the government fiber optic backbone and middle-mile at the national level, and in last-mile connectivity in Mindanao. The network security component will strengthen the digital resilience in the country through ensuring secure and efficient functioning of fiber optic cables and increase the confidence in digital adoption by the government, businesses, and citizens. The project management component will build DICT’s project management, technical, and coordination capacity. These components are consistent with the Philippines Government’s goals under this project, which are to support the buildup and completion of the government-owned broadband infrastructure network through the NBP to: (a) accelerate the provision of broadband connectivity particularly in remote and disadvantaged areas to enable digital transformation and socioeconomic development opportunities; (b) augment the country’s digital infrastructure to help close the digital divide and catalyze private sector investments; and (c) strengthen capacity for cybersecurity and for protecting critical information infrastructure."}},"P181344":{"id":"P181344","countryname":["Nepal"],"lendinginstr":"Development Policy Lending","project_name":"Nepal Disaster Resilience Development Policy Credit with Cat DDO (NDRC)","p2a_updated_date":"2024-10-10 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-10-08T00:00:00Z","closingdate":"11/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181344","status":"Active","project_abstract":{"cdata!":"The development objective of Disaster Resilience Development Policy Credit with Catastrophe Deferred Drawdown Option Project for Nepal is to strengthen the capacity of the government of Nepal to manage disaster and climate risks, including disease outbreaks. This operation is aligned with the goals of the Paris Agreement. First, the operation is fully aligned with the policy recommendations that have emerged from the Nepal’s Country Climate and Development Report (CCDR) and is consistent with the climate priorities outlined in its Second Nationally Determined Contributions (NDC), National Adaptation Plan (NAP), and Long-term Strategy (LTS). Second, on mitigation goals, the reforms under this operation do not significantly increase greenhouse gas (GHG) emissions and do not introduce or reinforce persistent barriers to the country’s transition to low-GHG emissions. Third, on adaptation and resilience goals, risks from climate hazards are not likely to have an adverse effect on the prior actions’ contribution to the PDO. Prior Action 1 (PA1) aids the NAP and NDC goals to enhance disaster response, while PA2 focuses on updating building designs for climate resilience, in line with NDC and NAP. PA3 targets the NDC goal of expanding multi-hazard early warning systems. PA4 supports the NAP's capacity building initiatives for climate-informed policies and water infrastructure design. PA5 is in sync with the Disaster Risk Reduction (DRR) National Strategic Plan of Action, NAP, and NDC objectives to improve climate-sensitive disease surveillance by 2025. Therefore, all prior actions of the program are aligned with the adaptation and resilience goals of the Paris Agreement."}},"P178646":{"id":"P178646","countryname":["Montenegro"],"lendinginstr":"Development Policy Lending","project_name":"Montenegro First Resilient Fiscal and Sustainable Development DPF","p2a_updated_date":"2024-10-07 00:00:00.0","totalcommamt":"86,600,000","boardapprovaldate":"2024-10-04T00:00:00Z","closingdate":"3/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178646","status":"Active","project_abstract":{"cdata!":"The development objective of First Resilient Fiscal and Sustainable Development DPF Project for Montenegro is to support the government of Montenegro to: (i) strengthen fiscal sustainability and (ii) enable sustainable development. The DPF program supports reforms to strengthen the resilience of fiscal and development policy. These reforms are consistent with the government’s Economic Reform Program for 2024-2026. The operation is the first in a series of two programmatic loans organized under two pillars: (i) strengthening fiscal sustainability; and (ii) enabling sustainable development. These pillars closely complement each other in reinforcing the impact of the reform program. The program is informed by the findings of the World Bank 2022 Montenegro Country Economic Memorandum (CEM) and builds on the programmatic Policy-Based Guarantee operations, approved in 2017 and 2020. The programmatic series of two DPFs is also an integral part of the authorities’ medium-term debt strategy. The objectives of the operation are fully aligned with the Country Partnership Framework (CPF) FY2025-2029. The reforms supported by this operation benefit from the coordinated support and targeted technical assistance from the European Commission (EC), French Development Agency (AFD), the International Monetary Fund (IMF), and the World Bank."}},"P501037":{"id":"P501037","countryname":["Republic of Uzbekistan"],"lendinginstr":"Development Policy Lending","project_name":"Second Inclusive and Resilient Market Economy Development Policy Operation","p2a_updated_date":"2024-10-07 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-10-03T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501037","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Inclusive and Resilient Market Economy Development Policy Operation for Uzbekistan is to support Uzbekistan’s transition to an inclusive and resilient market economy through: (i) creating markets, (ii) improving fiscal risk management and public procurement, and (iii) supporting social inclusion and climate change action. The operation supports key government priorities. The first program development objective (PDO) pillar supports measures to improve the business and investment environment, and to enhance efficiency and reduce state dominance in the key sectors of agriculture, rail, and energy. The second pillar supports measures to improve fiscal risk management, especially relating to public-private partnership (PPPs) and public procurement. The third pillar supports measures to expand in-work social protection, further measures to protect victims of domestic violence, and measures to strengthen environmental sustainability and climate change action."}},"P180501":{"id":"P180501","countryname":["Lebanese Republic"],"lendinginstr":"Investment Project Financing","project_name":"Lebanon Renewable Energy and System Reinforcement Project","p2a_updated_date":"2024-10-03 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-10-01T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180501","status":"Active","project_abstract":{"cdata!":"The development objective of the Renewable Energy and System Reinforcement Project for Lebanon is to enable cleaner, more reliable, and efficient grid electricity services in Lebanon. The project comprises of four components. The first component, strengthening of Electricité du Liban (EDL) operational and commercial systems will directly strengthen the ability of EDL to better anticipate, identify, and address network disruptions and strengthen the resilience of EDL’s system. It consists of following sub-components: (i) strengthening of EDL operational systems; and (ii) strengthening of EDL commercial systems. The second component, increase of grid-connected renewable energy supply and network reinforcement will have the following sub-components: (i) development of grid-connected solar photovoltaic (PV) plant; (ii) rehabilitation of Litani River Authority (LRA) hydro power plant (HPPs) and strengthening of dam safety; and (iii) rehabilitation and reinforcement of EDL transmission network. The third component, technical assistance will have the following sub-components: (i) project implementation support and technical studies for EDL; and (ii) project implementation support, technical studies for LRA, and dam safety panel of experts. The fourth component, contingent emergency response component (CERC) will have zero funding allocation at the onset and will only be triggered in emergency circumstances."}},"P180860":{"id":"P180860","countryname":["Republic of Indonesia"],"lendinginstr":"Investment Project Financing","project_name":"Integrated Land Administration and Spatial Planning Project","p2a_updated_date":"2024-10-02 00:00:00.0","totalcommamt":"653,000,000","boardapprovaldate":"2024-09-30T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180860","status":"Active","project_abstract":{"cdata!":"The development objective of Integrated Land Administration and Spatial Planning Project for Indonesia is to strengthen climate-informed spatial planning, land tenure security and land administration in Indonesia. The project comprises five components. 1) The first component, Climate-Informed Spatial Planning, will finance data development and consulting services for the formulation of Detailed Spatial Plans (RDTRs) and integrated Spatial Plans for National Strategic Areas (RTR KSNs). 2) The second component, Strengthening Land Tenure and Landscape Management, will finance systematic land registration, registration of customary lands, and setting of village boundaries to strengthen land tenure security. 3) The third component, Land Information System and Valuation, will finance the development of a modern Land Information System (LIS), and production of ZNT maps to strengthen integrated land administration. 4) The fourth component, Large-Scale Base Maps for Climate Action, will be implemented by the Geospatial Information Agency (BIG), the national mapping authority of Indonesia. 5) The fifth component, Project Management and Capacity Building, will finance policy, regulatory and procedural assessments and reforms, project management under the Project Management Unit (PMU) and Project Implementation Units (PIU), monitoring, coordination, and institutional capacity building."}},"P179513":{"id":"P179513","countryname":["Republic of Angola"],"lendinginstr":"Development Policy Lending","project_name":"Second Green, Resilient, Inclusive Growth and Diversification Development Policy Loan","p2a_updated_date":"2024-10-02 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-09-30T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179513","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Green, Resilient, Inclusive Growth, and Diversification Development Policy Loan for Angola is to support the Government of Angola (GoA) to promote green, resilient, and inclusive growth by: (i) reducing economic distortions and strengthening fiscal and financial sector resilience; (ii) boosting inclusion by strengthening social protection; and (iii) improving markets and infrastructures to build climate resilience. The following filters were applied to guide the choice of reforms included in the Development Policy Loan (DPL) series: (i) criticality and robustness of reforms; (ii) strong analytical underpinnings to inform the actions; (iii) robustness of implementation arrangements to support reforms, including through complementary investment operations and technical assistance; (iv) GoA ownership to implement the reforms within the operation’s timeframe; and (v) coordination with other development partners."}},"P179284":{"id":"P179284","countryname":["Lao People's Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Lao PDR Climate Resilient Road Connectivity Improvement Project","p2a_updated_date":"2024-10-02 00:00:00.0","totalcommamt":"56,000,000","boardapprovaldate":"2024-09-30T00:00:00Z","closingdate":"8/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179284","status":"Active","project_abstract":{"cdata!":"The development objective of the Climate Resilient Road Connectivity Improvement Project for Lao People’s Democratic Republic is to improve climate resilient road access in targeted provinces, enhance capacity to manage the road network, and, in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, climate resilient road access will support: (i) improvement of approximately 300 km of district roads and rural roads in the provinces of Khammouan, Savannakhet, and Saravan to the standards of road design class V/VI as per Ministry of Public Works and Transport (MPWT’s) road design manual, addressing climate and disaster resilience aspects, and maintenance of the Project roads post improvement during the Project period through output and performance-based road contracts (OPBRC) and or hybrid performance-based contracts (Hybrid PBC) and, (ii) construction supervision of the project road improvement works. The second component, project management will support: (i) financial audit, (ii) technical audits of the project road improvement works during construction, (iii) environmental and social monitoring and audits, (iv) road safety audit of the project, road designs at three stages (at design, construction, and completion stages), and awareness campaigns, (v) road user satisfaction surveys carried out at the start of implementation of works, at mid-term, and at the close of the project, (vi) incremental operating costs, (vii) technical and operational assistance for the day-to-day management, monitoring and evaluation of the Project, and (viii) land acquisition, resettlement, and rehabilitation costs, including the implementation of resettlement action plan(s). The third component, institutional development will support MPWT in: (i) capacity building of local contractors in the areas of OPBRCs, climate resilience, road safety, and environmental and social risk management, (ii) a study on climate resilient road network planning and prioritization and capacity building of MPWT and Department of Public Works and Transport (DPWTs), (iii) preparation of a road sector financing strategy, (iv) capacity building of selected MPWT and DPWT staff on cross-cutting issues including road maintenance, OPBRC contract management, road safety, gender, citizen engagement, and climate disaster risk, (v) institutional support for a female internship program, and (vi) preparation of selected environmental, social, technical, and economic documents as well as feasibility studies, through the provision of technical advisory services in the road sector in targeted provinces. The fourth component, contingent emergency response will support MPWT in case of an eligible crisis or emergency in responding promptly and effectively to it as per the contingent emergency response manual."}},"P503941":{"id":"P503941","countryname":["Republic of Zambia"],"lendinginstr":"Investment Project Financing","project_name":"Zambia Refugee and Host Communities Project - ZRHCP","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-09-26T00:00:00Z","closingdate":"10/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503941","status":"Active","project_abstract":{"cdata!":"The development objective of the Refugee and Host Communities Project for Zambia is to improve access to socio-economic opportunities for refugees and host communities. The project comprises of four components. The first component, strengthening the enabling environment objective is two-fold. First, it is to build an enabling legal framework for refugees related to documentation, basic services, and livelihoods and self-reliance. Secondly, it aims to support the rollout of new national ID cards to refugees in all three of the refugee hosting districts. It consists of following sub-components: (i) building an enabling legal framework; and (ii) issuing of ID cards to refugees and former refugees nationally. The second component, climate-resilient community infrastructure objective is to address profound infrastructure deficits both in the Meheba refugee settlement and the surrounding community. The third component, climate-resilient agriculture objective is to support small-scale farmers to improve their productivity, income, and resilience to climate shocks. The fourth component, project management will finance the staffing of two Project Management Units (PMUs), one at the national level hosted by the Ministry of Home Affairs and Internal Security (MoHAIS) and a second Satellite Project Management Unit (SMPU) at the Kalumbila District level."}},"P181485":{"id":"P181485","countryname":["Republic of Serbia"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for the Serbia Accelerating Innovation and Growth Entrepreneurship Project","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"26,700,000","boardapprovaldate":"2024-09-26T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181485","status":"Active"},"P181476":{"id":"P181476","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Program-for-Results Financing","project_name":"Nigeria Human Capital Opportunities for Prosperity and Equity (HOPE) - Governance","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-09-26T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181476","status":"Active","project_abstract":{"cdata!":"The development objective of the Human Capital Opportunities for Prosperity and Equity: Governance (HOPE-GOV) for Nigeria is support the Federal Republic of Nigeria in strengthening financial and human resource management in basic education and primary health care sectors. The government programs that the HOPE-GOV program for results (PforR) will support focus on improving service delivery in the basic education and primary healthcare sectors. The government programs are: (i) the universal basic education (UBE) program established by the Universal Basic Education Act of 2004 (UBE Act), now being refocused through the new universal basic education roadmap (UBER), 2021 - 2030; and (ii) the basic healthcare provision program established by the National Health Act of 2014, now being implemented through the National Health Sector Renewal Investment Initiative (NHSRII), 2024 - 2028. The program focuses on three result areas (RA): RA 1: increased availability and effectiveness of financing for basic education and primary healthcare service delivery; RA 2: enhanced transparency and accountability for basic education and primary healthcare financing; and RA 3: improved recruitment, deployment and performance management of basic education teachers and primary healthcare workers by federal, state, and local governments."}},"P179684":{"id":"P179684","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Investment Project Financing","project_name":"Sustainable Power and Irrigation for Nigeria Project","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-09-26T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179684","status":"Active","project_abstract":{"cdata!":"The development objective of the Sustainable Power and Irrigation for Nigeria Project is to strengthen dam safety and improve management of water resources for hydropower and irrigation in selected areas of Nigeria. The project comprises of four components. The first component, institutional strengthening and capacity building for water resources management (WRM) supports policy, institutions, and regulation at the federal, state, and river basin levels and collaboration among irrigation, dam safety, and hydropower stakeholders to promote integrated WRM (IWRM) and help achieve the food water-energy nexus in Nigeria. It consists of following sub-components: (i) institutional strengthening and capacity building for WRM and hydropower planning at federal level; (ii) institutional strengthening and national knowledge exchange on WRM at state level; and (iii) improving WRM at river basin level. The second component, irrigation modernization will support the rehabilitation and revitalization of 40,000 ha of irrigated command area, through a comprehensive modernization program combining improving irrigation and drainage infrastructure while implementing the policy, institutional, and regulatory reforms presented in Component 1. It consists of following sub-components: (i) Mobilization and Development of Water User Associations (WUAs); (ii) irrigation and drainage infrastructure investments; and (iii) irrigation management modernization. The third component, improvements in dam operations and enhancing dam safety will strengthen the dam safety management system in the country and will rehabilitate and improve the safety of prioritized dams and associated appurtenances. The fourth component, project management objective is to effectively implement, monitor, and evaluate project activities."}},"P504693":{"id":"P504693","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Program-for-Results Financing","project_name":"Nigeria: Primary Healthcare Provision Strengthening Program","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"450,000,000","boardapprovaldate":"2024-09-26T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504693","status":"Active","project_abstract":{"cdata!":"The development objective of the Primary Healthcare Provision Strengthening (HOPE-PHC) Program for Nigeria is to improve utilization of quality essential health care services and health system resilience in the Federal Republic of Nigeria. The program-for-results (PforR) Program is grounded in the Nigeria Health Sector Renewal Investment Initiative (NHSRII), an ambitious and transformative initiative launched in December 2023 with a view to improving Nigeria’s health outcomes and economic potential by drastically reducing maternal and under-five mortality rates. The HOPE-PHC Program is also consistent with the National Strategic Health Development Plan II (2018-2022), medium-term national development plan 2021-2025, and Agenda 2050. The basic health care provision program (BHCPP’s) essential benefit package prioritizes cost-effective services, focusing on reproductive health, maternal care and nutrition, childhood illnesses, and non-communicable disease (NCD) screening. The HOPE-PHC Program is built around three key results areas: (1) improving quality of services; (2) improving utilization of essential services; and (3) improving the resilience of the health system."}},"P180000":{"id":"P180000","countryname":["Republic of Chad"],"lendinginstr":"Investment Project Financing","project_name":"Chad Digital Transformation Project","p2a_updated_date":"2024-09-27 00:00:00.0","totalcommamt":"92,200,000","boardapprovaldate":"2024-09-25T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180000","status":"Active","project_abstract":{"cdata!":"The development objective of the Digital Transformation Project for Chad is to expand access to affordable and resilient broadband connectivity and improve government capacity to deliver public services digitally. The project comprises of four components. The first component, climate-resilient broadband connectivity and digital inclusion will aim at closing the digital access gap by bringing affordable broadband services to rural communities and vulnerable populations, bringing public services (Component 2) and enhancing the presence of state in fragility, conflict, and violence (FCV) areas to strengthening resilience by building digital capabilities and services for conflict zones (addressing drivers of fragility in East and North of Chad). Digital infrastructure will be subject to quality standards for climate resilient and low-carbon digital connectivity. It consists of following sub-components: (i) strategic, policy, legal, regulatory, and institutional frameworks for resilient and affordable broadband access; (ii) rural broadband access; (iii) urban and peri-urban broadband access; and (iv) training and digital inclusion. The second component, laying key foundations for digital government services will provide support to build Government of Chad (GoC’s) digital platforms, strengthen institutional capacity for digital public service delivery to the Chadian population, enhance data security and personal data protection capabilities, digitalize prioritized services and systems, and enhance the government’s operational efficiency. It consists of following sub-components: (i) strategic, policy, legal, regulatory, and institutional frameworks for trusted digital services; (ii) enhancing foundations of digital government; (iii) digitization of payments; and (iv) digitalization of selected services. The third component, project management and knowledge transfer will finance project management costs and institutional coordination, including setting up a dedicated Project Implementation Unit (PIU) and coordination mechanisms. The fourth component, contingent emergency response component (CERC) is included in the project per the investment project financing policy, paragraphs 12 and 13, for situations of urgent need of assistance and capacity constraints."}},"P181250":{"id":"P181250","countryname":["Republic of the Marshall Islands"],"lendinginstr":"Investment Project Financing","project_name":"Renewable Energy Generation and Access Increase Project","p2a_updated_date":"2024-10-10 00:00:00.0","totalcommamt":"60,000,000","boardapprovaldate":"2024-09-24T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181250","status":"Active"},"P173194":{"id":"P173194","countryname":["The Independent State of Papua New Guine"],"lendinginstr":"Investment Project Financing","project_name":"National Energy Access Transformation Project","p2a_updated_date":"2024-10-10 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-09-24T00:00:00Z","closingdate":"12/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P173194","status":"Active"},"P181555":{"id":"P181555","countryname":["East Asia and Pacific"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Sustainable Energy Transition Program","p2a_updated_date":"2024-09-29 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2024-09-24T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181555","status":"Active","project_abstract":{"cdata!":"The development objective of the Accelerating Sustainable Energy Transition Program for East Asia and Pacific is to help accelerate renewable energy scale up in the Association of Southeast Asian Nations (ASEAN) countries, including through regional power trade. The project comprises of three components. The first component is regional renewable energy policy support and climate financing; the second component is regional power trade; and the third component is knowledge sharing, consultations, and capacity building."}},"P180664":{"id":"P180664","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Second Higher Education Improvement Project","p2a_updated_date":"2024-09-25 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2024-09-23T00:00:00Z","closingdate":"11/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180664","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Higher Education Improvement Project for Cambodia is to improve quality and relevance of higher education and research mainly in science, technology, engineering, and mathematics (STEM) at targeted higher education institutions, and to provide immediate and effective response in case of an eligible crisis or emergency. The project comprises of three components. The first component, improving quality and relevance of academic programs and research aims to enhance the quality and relevance of higher education and research at the targeted Higher Education Institution (HEIs) in the fields of STEM, and potentially other complementary fields, including English, architecture, and archaeology, which are deemed necessary for the country’s development. It consists of following sub-components: (i) improving quality and relevance of academic programs; (ii) improving quality and relevance of research; and (iii) strengthening institutional governance. The second component, strengthening higher education sectoral governance and research management capacity aims to strengthen the system of higher education sector by improving sectoral governance, research management and development, and project management. It consists of following sub-components: (i) strengthening higher education sectoral governance; (ii) building research management capacity; and (iii) strengthening project management and evaluation. The third component, contingent emergency response component (CERC) with zero allocation will provide swift response in the event of an eligible crisis or emergency, by enabling Cambodia to request the World Bank for reallocation of uncommitted project funds to support emergency response and reconstruction."}},"P506072":{"id":"P506072","countryname":["Republic of Guinea"],"lendinginstr":"Investment Project Financing","project_name":"Guinea Enhancing Health System Transformation (GUEST) Project","p2a_updated_date":"2024-09-25 00:00:00.0","totalcommamt":"85,000,000","boardapprovaldate":"2024-09-23T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506072","status":"Active","project_abstract":{"cdata!":"The development objective of the Enhancing Health System Transformation (GUEST) Project for Guinea is to improve the utilization of quality reproductive, maternal, neonatal, child, and adolescent health and nutrition services in selected regions. The project comprises of four components. The first component, supply of quality basic reproductive, maternal, newborn, child, and adolescent health and nutrition (RMNCAH-N) services consists of following sub-components: (i) strengthening of basic RMNCAH-N service readiness; (ii) expansion of results-based financing (RBF) for improved quality RMNCAH-N service delivery in poor-performing and climate sensitive regions; and (iii) enhancing quality through digital health services. The second component, stimulating demand for and access to basic RMNCAH-N services consists of following sub-components: (i) expanding the district-level free health care for the poorest in low-performing and climate vulnerable regions; and (ii) strengthening community health and nutrition. The third component, project coordination, management, and monitoring and evaluation (M and E) consists of following sub-components: (i) project coordination and management; (ii) project monitoring and evaluation; and (iii) strengthening the health information system. The fourth component, contingent emergency response component (CERC) will allow for the rapid reallocation of uncommitted International Development Association (IDA) grant funds in the event of an eligible emergency as defined in OP 8.00."}},"P502111":{"id":"P502111","countryname":["Romania"],"lendinginstr":"Development Policy Lending","project_name":"Romania Second Disaster Risk Management Development Policy Loan with a Cat DDO","p2a_updated_date":"2024-09-23 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-09-19T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502111","status":"Active"},"P506528":{"id":"P506528","countryname":["Burkina Faso"],"lendinginstr":"Investment Project Financing","project_name":"Human Capital Protection Project","p2a_updated_date":"2024-09-23 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-09-19T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506528","status":"Active","project_abstract":{"cdata!":"The development objective of the Human Capital Protection Project for Burkina Faso is to support the Recipient’s efforts to ensure the provision of essential social services. The project comprises of two components. The first component, ensuring the provision of essential health and education services will finance essential health and education services under the goods and services economic classification. It consists of following sub-components: (i) ensuring the provision of essential health services; and (ii) ensuring the provision of essential education services. The second component, project management will finance the operating costs required for implementing the project, including managing its fiduciary risk."}},"P181415":{"id":"P181415","countryname":["Republic of Djibouti"],"lendinginstr":"Investment Project Financing","project_name":"Horn of Africa Initiative: Djibouti Regional Economic Corridor  AF","p2a_updated_date":"2024-09-18 00:00:00.0","totalcommamt":"160,000,000","boardapprovaldate":"2024-09-16T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181415","status":"Active"},"P504400":{"id":"P504400","countryname":["Republic of Ecuador"],"lendinginstr":"Investment Project Financing","project_name":"Ecuador Guayas: Resilient Rural Roads","p2a_updated_date":"2024-09-16 00:00:00.0","totalcommamt":"250,000","boardapprovaldate":"2024-09-13T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504400","status":"Active","project_abstract":{"cdata!":"The development objectives of the Guayas: Resilient Rural Roads Project for Ecuador are to improve resilient, sustainable, and safe road connectivity in rural areas of the Province of Guayas and, in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of three components. The first component, rural road construction and rehabilitation comprises two mutually reinforcing sub-components aimed at enhancing resilient connectivity in selected lagging rural areas of the Provincial Decentralized Autonomous Government of Guayas (PoG) vulnerable to climate change effects. It consists of following sub-components: (i) rehabilitation of rural roads; and (ii) reconstruction and construction of bridges in rural areas. The second component, project management and capacity building will primarily focus on supporting PoG with managing the operation and increasing capacity for sustainable management of the transportation infrastructure. It consists of following sub-components: (i) project management; (ii) technical support; and (iii) community engagement, protection, gender, and inclusion. The third component, contingency emergency response (CERC) will have no funding allocation initially and will draw resources from the unallocated expenditure category in the case of activation."}},"P181495":{"id":"P181495","countryname":["Republic of Angola"],"lendinginstr":"Investment Project Financing","project_name":"Enhancing the Social Protection System for Human Capital and Resilience Project","p2a_updated_date":"2024-09-16 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-09-12T00:00:00Z","closingdate":"10/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181495","status":"Active","project_abstract":{"cdata!":"The development objective of the Enhancing the Social Protection System for Human Capital and Resilience Project for Angola is to increase access to opportunities to build foundational human capital and household resilience, and to strengthen the social protection system. The project comprises of four components. The first component, human capital and resilience building consists of following sub-components: (i) increasing investments in human capital among beneficiary households; (ii) strengthening beneficiary households’ resilience and adaptiveness to climatic shocks; and (iii) enhancing productive opportunities. The second component, improving social protection implementation and institutional capacity will be implemented by FAS- Local Development Institute (IDL) (Subcomponent 2A) and Ministry of Social Action, Family and Promotion of Women (MASFAMU) (Subcomponent 2B) in accordance with their respective legal mandates, with each having independent fiduciary and management responsibility. It consists of following sub-components: (i) improving efficiency of Kwenda program delivery systems; and (ii) strengthening social protection systems, policy, and develop social protection (SP) skills. The third component, project management, and monitoring and evaluation (M and E) consists of following sub-components: (i) FAS-IDL project management and M and E; and (ii) MASFAMU project management and capacity building. The fourth component, contingency emergency response component (CERC) will allow the government to quickly reallocate and mobilize funds to support response to an eligible crisis or emergency."}},"P181681":{"id":"P181681","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Building Skills for Human Capital Development in South Sudan","p2a_updated_date":"2024-09-13 00:00:00.0","totalcommamt":"44,000,000","boardapprovaldate":"2024-09-11T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181681","status":"Active"},"P180549":{"id":"P180549","countryname":["Democratic Socialist Republic of Sri Lan"],"lendinginstr":"Development Policy Lending","project_name":"Sri Lanka Second Resilience, Stability and Economic Turnaround Development Policy Operation","p2a_updated_date":"2024-09-13 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-09-11T00:00:00Z","closingdate":"9/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180549","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Resilience, Stability, and Economic Turnaround Development Policy Operation for Sri Lanka is to support foundational reforms that restore macroeconomic stability and sustainability, mitigate the impact of current and future shocks on the poor and vulnerable, and support an inclusive and private-sector-led recovery and growth path. This will be achieved through three pillars aimed at: (i) improving economic governance through better fiscal and debt management, improving tax policy and administration, and addressing financial sector risks; (ii) enhancing growth and competitiveness through regulatory reforms, institutional restructuring and increasing competition in core sectors (i.e., electricity and broadband), and reforms to the trade regime; and (iii) protecting the poor and vulnerable through the rolling out of a new Welfare Benefit Payment Scheme (WBPS) and reducing gender discrimination. The operation supports results areas in the World Bank’s corporate scorecard related to macroeconomic and fiscal management, protecting the poorest, digital connectivity, and providing affordable and sustainable energy."}},"P178808":{"id":"P178808","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Governance Modernization to Enable Efficient Service Delivery Project","p2a_updated_date":"2024-09-12 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-09-10T00:00:00Z","closingdate":"10/9/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178808","status":"Active","project_abstract":{"cdata!":"The development objective of the Governance Modernization to Enable Efficient Service Delivery Project for Ethiopia is to improve government institutional capacity to mobilize and manage public financial and human resources efficiently. The project comprises of four components. The first component, improving public administration capabilities will focus on three fundamental building blocks aligned with the Government of Ethiopia (GoE’s) draft Homegrown Economic Reform Agenda (HGER) 2.0, civil service reform roadmap and civil service policy. It consists of following sub-components: (i) developing an evidence-based and data-informed approach to human resource management; (ii) competency-based human resource management; (iii) institutionalizing training, capacity building, and change management; and (iv) reform innovation facility. The second component, improving domestic revenue mobilization capabilities will support the GoE in implementing key tax administration reforms to help it achieve the national medium term revenue strategy. It consists of following sub-components: (i) leveraging technology and data analytics to support risk-based tax administration; and (ii) improving the quality and availability of taxpayer services. The third component, improving public financial management capabilities will support the GoE in scaling up the use of technology, addressing critical deficiencies along the public financial management (PFM) cycle, the professionalization of accountants and procurement professionals within the public service, and the institutionalization of core training and government-to-government capacity building. It consists of following sub-components: (i) scaling up the use of technology for improved public financial management; (ii) address critical public financial management deficiencies; and (iii) institutionalizing professional training, capacity building, and change management. The fourth component, project management will support the management, coordination, and monitoring and evaluation (M and E) of project activities and funds."}},"P180555":{"id":"P180555","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Brazil Proactive, Safe, and Resilient Road Asset Management Program - State of Bahia","p2a_updated_date":"2024-09-12 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-09-10T00:00:00Z","closingdate":"11/30/2032 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180555","status":"Active","project_abstract":{"cdata!":"The development objective of the State of Bahia Proactive, Safe, and Resilient Road Asset Management Program Project for Brazil is to improve access to sustainable, safe, and resilient transport in selected states of Brazil. The project comprises of four components. The first component, proactive maintenance based on a long-term (8 to 25 years) performance-based contract for rehabilitation and road maintenance (CREMA) model using performance-based contract (PBCs) consists of following sub-components: (i) proactive maintenance CREMA- design-build-maintain (DBM): long-term performance-based road management contracts for safe and resilient state or federal road corridors; and (ii) proactive maintenance CREMA- public-private partnership (PPP): long-term performance-based contracts using the PPP modality for selected safe and resilient state roads. The second component is institutional strengthening, covering three sets of activities: proactive, safe, and resilient road asset management; green mobility and logistics; and social inclusion and gender. The third component, safe and resilient improvements of road infrastructure will focus on promoting road safety in areas where interactions between vehicles and pedestrians and cyclists are frequent, and on climate resilient and all-season access in selected areas identified by the participant states. It consists of following sub-components: (i) construction of bypasses in areas prone to flooding and logistical bottlenecks along selected state road corridors; (ii) safe active mobility infrastructure in selected urbanized areas; and (iii) improvement to all-season access to transport in rural areas. The fourth component, project management will support management and coordination of the different phases of the Program."}},"P178774":{"id":"P178774","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"CAR Inclusive and Resilient Cities Project","p2a_updated_date":"2024-09-12 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-09-10T00:00:00Z","closingdate":"8/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178774","status":"Active","project_abstract":{"cdata!":"The development objective of the Inclusive and Resilient Cities Project for Central African Republic is to improve access to climate-resilient infrastructure and basic services in selected cities. The project comprises of four components. The first component, investments in flood and erosion risks reduction consists of following sub-components: (i) infrastructure for flood and erosion risks reduction; and (ii) institutional support for climate risk integrated planning and urban management. The second component, neighborhood infrastructure and basic services will support investments in local-level, climate resilient socioeconomic infrastructure. The third component, project management will support activities including: (a) the planning, implementation, and technical oversight of program activities; (b) effective social and environmental risk management; and (c) financial management (FM) and procurement. The fourth component, contingency emergency response component (CERC) will allow for rapid reallocation of project uncommitted funds in the event of an eligible emergency as defined in OP 8.00."}},"P181050":{"id":"P181050","countryname":["Republic of Rwanda"],"lendinginstr":"Program-for-Results Financing","project_name":"Priority Skills for Growth and Youth Empowerment","p2a_updated_date":"2024-09-12 00:00:00.0","totalcommamt":"275,000,000","boardapprovaldate":"2024-09-09T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181050","status":"Active","project_abstract":{"cdata!":"The development objective of the Priority Skills for Growth and Youth Empowerment (PSGYE) Program for Rwanda is to improve employability for target beneficiaries and strengthen institutional capacity for enhanced service delivery in skills development. The Program scope draws from lessons learned and evidence of five principles for building effective and efficient tertiary education and optimizing its contribution to equitable and green growth: (i) building diversified systems, (ii) investing smartly in new technologies, (iii) ensuring equity in access and financing, (iv) achieving efficiency in resource utilization, and (v) acquiring resilience in service delivery so that learning continues. Within the Government of Rwanda (GoR’s) overarching program (NSDEPS), the PSGYE seeks to: (a) increase opportunities for the acquisition of market-demanded skills by vulnerable and not in education, employment, or training (NEET) youths; (b) improve the quality and market-relevance of technical and vocational education and training (TVET) and degree programs for the workforce; and (c) strengthen governance of the overall skills development system. As such, these objectives comprise the Results Areas (RAs) of the program for results (PforR) operation. RA 1: increase opportunities for the acquisition of market-demanded skills by vulnerable and NEET youths; RA 2: improve quality and market relevance of target TVET and degree programs for the workforce; and RA 3: strengthen governance of the overall skills development system."}},"P504278":{"id":"P504278","countryname":["Republic of Moldova"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening Moldova's Disaster Risk Management and Resilience Project","p2a_updated_date":"2024-09-10 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-09-05T00:00:00Z","closingdate":"9/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504278","status":"Active","project_abstract":{"cdata!":"The development objective of the Strengthening Moldova’s Disaster Risk Management and Resilience Project for Moldova is to enhance Moldova’s preparedness and response to natural hazards and climate-related shocks, and in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of five components. The first component, investments and institutional strengthening for emergency preparedness and response will finance the installation and implementation of a national cell phone (cell broadcast) based public warning system (PWS) with its respective instrumentation and data servers and integration with existing meteorological, hydrological, and geological information systems. It consists of following sub-components: (i) public warning system; (ii) emergency response vehicles; and (iii) community emergency preparedness. The second component, improving hydrometeorological services will support the strengthening of the state hydrometeorological service (SHS’s) meteorological and hydrological monitoring networks; production of forecasts and warnings capacity; and delivery of weather, hydrological, and climate services. It consists of following sub-components: (i) modernization of hydrometeorological monitoring systems and information and communication technology (ICT) capabilities; and (ii) improving SHS service delivery by enhancing SHS forecasting capabilities, institutional strengthening, and regional collaboration. The third component, policy and regulatory support for risk reduction of critical infrastructure and fiscal resilience will provide support for policy and regulatory measures and technical studies to better assess and manage natural hazards and climate-related risks. It consists of following sub-components: (i) policy, regulatory, and feasibility study support to reduce seismic risk; and (ii) financial protection to mitigate disaster impacts. The fourth component, contingent emergency response component (CERC) will enable the reallocation of loan proceeds from other components to provide immediate recovery and reconstruction support following an eligible crisis, as needed. The fifth component, project management will cover operational costs, consulting services, non-consulting services, goods, and training to finance the overall project management cost, including consultants hired by the Project Implementation Unit (PIU) to carry out project management and technical support functions to ensure efficient project implementation and close cooperation between the line ministries and implementing agencies as well as other project stakeholders."}},"P181549":{"id":"P181549","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Productive Safety Net for Socioeconomic Opportunities Project Additional Financing","p2a_updated_date":"2024-09-06 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-09-03T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181549","status":"Active"},"P500500":{"id":"P500500","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Building Institutional Foundations for an Effective Public Service Project","p2a_updated_date":"2024-09-06 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-09-03T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500500","status":"Active"},"P504171":{"id":"P504171","countryname":["Ukraine"],"lendinginstr":"Program-for-Results Financing","project_name":"Lifting Education Access and Resilience in times of Need in Ukraine Program","p2a_updated_date":"2024-09-02 00:00:00.0","totalcommamt":"22,000,000","boardapprovaldate":"2024-08-30T00:00:00Z","closingdate":"9/1/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504171","status":"Active","project_abstract":{"cdata!":"Russia's invasion of Ukraine has resulted in substantial civilian casualties, increased poverty, and displacement of millions of people. As a response to the challenges described above, the MoES’ Strategic Action Plan for 2024-27 prioritizes students’ safety and the improvement of teaching and learning according to the NUS reform, while providing the policy framework for investments and reforms to transform the education system. 22 The Strategic Action Plan is the instrument the government developed to strengthen the education sector and transition out of emergency. It presents the MoES’ strategic goals and priorities until 2027; it was endorsed by the highest level of government and is based on consultations with stakeholders and experts. The Strategic Action Plan outlines a clear vision for improving teaching and learning conditions, starting with safe access to high-quality in-person education, and aims to transform the education system, with investments and reforms planned at each level of education, each with 3-5 strategic goals and targets to implement the directions outlined above. The priorities are: (i) early childhood and preschool education, (ii) school education (grades 1 to 12) and the NUS, (iii) extracurricular education, (iv) vocational education and training, (v) Higher education, (vi) Science and innovation, (vii) European integration in education and science, (viii) digitalization of education and science, and (ix) support for people with special educational needs."}},"P502591":{"id":"P502591","countryname":["Pacific Islands"],"lendinginstr":"Investment Project Financing","project_name":"Pacific Strengthening Correspondent Banking Relationships Project","p2a_updated_date":"2024-09-02 00:00:00.0","totalcommamt":"120,000,000","boardapprovaldate":"2024-08-29T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502591","status":"Active","project_abstract":{"cdata!":"The development objective of Pacific Strengthening Correspondent Banking Relationships (CBR) Project is to enable continuous access to correspondent banking services in the participating Pacific Island countries. The project has two components. 1) The first component, Ensuring Continuous Access to CBR Services, will ensure continuous access to CBR services by a qualifying financial institution operating in eligible Pacific Island Countries (PICs) facing the complete loss of CBRs in a key currency. 2) The second component, Improving the Enabling Environment and Regulatory Harmonization, will support improved Anti-Money Laundering/Combating the Financing of Terrorism (AML/CFT) supervision, payment systems oversight, regional harmonization, and project management."}},"P181501":{"id":"P181501","countryname":["Federative Republic of Brazil"],"lendinginstr":"Development Policy Lending","project_name":"BR Enhancing Prosperity and Sustainability in the State of Sergipe Development Policy Financing","p2a_updated_date":"2024-08-30 00:00:00.0","totalcommamt":"110,000,000","boardapprovaldate":"2024-08-27T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181501","status":"Active","project_abstract":{"cdata!":"The development objective of Enhancing Prosperity and Sustainability in the State of Sergipe Development Policy Financing Project for Brazil is to support the State of Sergipe to: (i) strengthen fiscal sustainability and (ii) improve the management of natural resources in the areas of water, sanitation, solar energy and solid waste. The government of Sergipe’s program outlines a multifaceted strategy to address key challenges, emphasizing poverty reduction, economic development, infrastructure, sustainability, strengthened governance and efficient state management. Highlighting a strong commitment to strong environmental stewardship, the government’s program also sets strategic goals for improving environmental sustainability and natural resource management, including through sanitation. Key aspects include the expansion and improvement of access to water and sanitation with a focus on improving service delivery. Further, the program focuses on promoting regionalized and integrated solid waste management and strengthening water resources management to enhance resilience to the impacts of climate change. Reforms supported under the program are instrumental to achieving these objectives. The first pillar of the Development Policy Finance (DPF) supports reforms that improve fiscal sustainability. The second pillar of the DPF supports selected policies to improve the management of natural resources. The two pillars of the DPF are closely aligned with the guiding themes of the government’s Multiannual Plan (Plano Plurianual – PPA). The proposed operation is aligned with the goals of the Paris Agreement. The project is compliant with the Maximizing Finance for Development (MFD) approach by implementing fiscal management and regulatory reforms that will enable new private sector investment."}},"P500390":{"id":"P500390","countryname":["Lebanese Republic"],"lendinginstr":"Investment Project Financing","project_name":"Community-based Wildfire Risk Management in Lebanon’s Vulnerable Landscapes","p2a_updated_date":"2024-08-30 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-08-27T00:00:00Z","closingdate":"7/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500390","status":"Active"},"P506127":{"id":"P506127","countryname":["Lebanese Republic"],"lendinginstr":"Investment Project Financing","project_name":"Support for Social Recovery Needs of Vulnerable Groups Phase II","p2a_updated_date":"2024-08-30 00:00:00.0","totalcommamt":"5,600,000","boardapprovaldate":"2024-08-27T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506127","status":"Active","project_abstract":{"cdata!":"The development objective of Second Phase of Support for Social Recovery Needs of Vulnerable Groups Project is to expand support for the immediate social recovery needs of vulnerable groups in Lebanon. This project has three components. 1) The first component, Support for Social Services for Vulnerable Groups, has the following sub-components: (i) Enhanced Support for Survivors and those at-risk of Gender Based Violence (GBV) and Children; (ii) Enhanced Support for Psychosocial Wellbeing; and (iii) Enhance Support for Older Persons and Persons with Disabilities. 2) The second component, Sub-grantee Capacity Building for Impact and Sustainability, aims to ensure that Non-Governmental Organization (NGO) partners continue to improve, amongst other aspects, their project management, financial management, procurement, environmental and social safeguards capabilities over the course of the project. 3) The third component, Project Management, will be utilized to finance project operating and management costs."}},"P179703":{"id":"P179703","countryname":["Republic of Serbia"],"lendinginstr":"Investment Project Financing","project_name":"Serbia Railway Sector Modernization Phase 2","p2a_updated_date":"2024-08-14 00:00:00.0","totalcommamt":"65,000,000","boardapprovaldate":"2024-08-13T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179703","status":"Active"},"P179923":{"id":"P179923","countryname":["Republic of Peru"],"lendinginstr":"Investment Project Financing","project_name":"Improving MIDIS’s Information Services within the National Targeting System (SINAFO) at the National Level Project","p2a_updated_date":"2024-08-12 00:00:00.0","totalcommamt":"55,000,000","boardapprovaldate":"2024-08-09T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179923","status":"Active","project_abstract":{"cdata!":"The development objective of the Improving Ministry of Social Development and Inclusion (MIDIS’s) Information Services within the National Targeting System (SINAFO) at the National Level Project for Peru is to make MIDIS’s information services within Peru’s SINAFO more inclusive, dynamic, and interoperable for use by public institutions for their regular and emergency interventions. The project comprises of three components. The first component, enhancing the capacity to include poor and vulnerable households in the General Household Registry (PGH) addresses four underlying challenges in the implementation of PGH that have hindered it from becoming a reliable and sustainable targeting instrument. It consists of following sub-components: (i) enhancing the capacity of local registration units (ULEs) to implement the PGH; and (ii) improving the household experience with PGH. The second component, enhancing capacities for the management of SINAFO at the central level addresses three challenges present in the implementation of SINAFO. It consists of following sub-components: (i) enhancing capacities of General Directorate of Targeting and Social Information (DGFIS) to lead and manage SINAFO; (ii) improving interoperability among the members of SINAFO; and (iii) strengthening the targeting procedures of MIDIS ’s targeted programs. The third component, project management and monitoring will support the operation of the Project’s Implementation Unit (PIU)."}},"P180554":{"id":"P180554","countryname":["Republic of Peru"],"lendinginstr":"Development Policy Lending","project_name":"Peru First Fiscal Policy and Sustainable Growth DPF-DDO","p2a_updated_date":"2024-08-12 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-08-09T00:00:00Z","closingdate":"11/1/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180554","status":"Active","project_abstract":{"cdata!":"The development objective of the First Fiscal Policy and Sustainable Growth Development Policy Financing - Deferred Drawdown Option (DPF-DDO) for Peru is to support Government reforms to: (a) strengthen fiscal management, and (b) foster a more productive and greener economy. It advances development areas that are prioritized in the Peru Country Partnership Framework (CPF) objectives and the Systematic Country Diagnostic (SCD) update high level outcomes (HLOs). Reforms supported by this operation benefit from broad policy consensus, are aligned with the government’s strategic plans and help advance Peru’s Organization for Economic Co-operation and Development (OECD) accession. This DPF-DDO complements the World Bank Group’s (WBG) ongoing and pipeline program of investment projects, particularly in innovation. Finally, in the context of high uncertainty and financial market volatility, the authorities value the DDO instrument as an important part of their debt management strategy and a hedge against increasing global interest rates and international capital markets’ volatility, and climate shocks."}},"P181702":{"id":"P181702","countryname":["Republic of Ghana"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing to GAMA Sanitation and Water Project","p2a_updated_date":"2024-08-21 00:00:00.0","totalcommamt":"155,000,000","boardapprovaldate":"2024-08-08T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181702","status":"Active"},"P180909":{"id":"P180909","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"National Community Initiatives Project","p2a_updated_date":"2024-08-02 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-07-31T00:00:00Z","closingdate":"7/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180909","status":"Active","project_abstract":{"cdata!":"The development objective of the National Community Initiatives Project for Kyrgyz Republic is to improve access to climate-resilient socio-economic infrastructure and increase economic opportunities for women and youth in target communities. There are four components to the project, the first component being Village infrastructure investments and institution strengthening. This component includes two subcomponents: socio-economic infrastructure investments, and mobilization and institution strengthening of communities and LSGs. The second component is the local economic development and livelihood opportunities for women and youth. This component will support local economic development to improve the economic well-being and the quality of life for the targeted community with special focus on women and youth. The third component is the project management. This component will finance project management and implementation of project-associated activities. It will finance the incremental operating costs and other eligible expenses associated with project implementation including coordination and supervision of implementation activities. ARIS will also be responsible for preparing annual work plans and budgets for the Ministry of Economy and Commerce (MoEC) approval, respectively, hiring of external auditors, and ensuring that the project maintains strong focus on gender inclusion and citizen engagement. Finally, the fourth component is the Contingent Emergency Response Component (CERC). The project would include a zero-dollar component that would provide support in the event of an eligible crisis or emergency, including climate-related disasters, to reallocate project funds to support emergency response. This component would draw from the uncommitted credit/grant resources under the project from other components to cover emergency response. An emergency eligible for financing is an event that has caused or is likely imminently to cause, a major adverse economic and/or social impact to the Borrower, associated with disaster."}},"P505747":{"id":"P505747","countryname":["Republic of Ecuador"],"lendinginstr":"Development Policy Lending","project_name":"Ecuador Carbon-Conscious Fiscal and Growth Development Policy Financing","p2a_updated_date":"2024-08-02 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-07-31T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505747","status":"Active","project_abstract":{"cdata!":"The development objective of the Carbon-Conscious Fiscal and Growth Development Policy Financing for Ecuador is to support reforms by the Government of Ecuador (GoE) to enhance fiscal sustainability and to enable private investment and female labor force participation. The National Development Plan (NDP) focuses on the country’s medium- and long-term development goals of reducing poverty and increasing shared prosperity. The plan has four pillars: social pillar; economic pillar; infrastructure, energy, and environment pillar; and institutional pillar."}},"P500471":{"id":"P500471","countryname":["United Republic of Tanzania"],"lendinginstr":"Investment Project Financing","project_name":"Financial Access for Sustainable and Transformational (FAST) Growth Project","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-07-30T00:00:00Z","closingdate":"7/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500471","status":"Active","project_abstract":{"cdata!":"The development objective of the Financial Access for Sustainable and Transformational Growth Project for Tanzania is to promote access to finance and growth of small and medium enterprises (SMEs) in Tanzania. The project comprises of five components. The first component, facilitate access to finance to SMEs and innovative startup’s objective is to stimulate financing for SMEs and innovative start-ups by financial institutions. It consists of following sub-components: (i) commercial wholesale finance entity; and (ii) restructuring of the People’s Bank of Zanzibar (PBZ). The second component, strengthening the credit infrastructure and value chain financing objective is to narrow the information gap on potential borrowers to help lower their perceived risk and encourage banks and other financial institutions to develop appropriate products for SMEs and underserved groups such as women and farmers who remain outside the banking sector. It consists of following sub-components: (i) strengthening credit reporting systems (CRS); and (ii) value chain financing. The third component, promoting SMEs growth in select value chains will support SMEs’ capacity-building efforts within value chains and foster links and access to market infrastructure and services. It consists of following sub-components: (i) strengthening SMEs capabilities; and (ii) strengthening market access services and infrastructure for SMEs. The fourth component, legal and regulatory reforms and capacity building objective is to support policy and legal reforms related to the project. The fifth component, technical assistance and project implementation, monitoring and reporting objective is to ensure the proper management monitoring and administration of the project."}},"P181014":{"id":"P181014","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Regional Emergency Preparedness & Access to Inclusive Recovery Project","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"280,000,000","boardapprovaldate":"2024-07-30T00:00:00Z","closingdate":"6/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181014","status":"Active","project_abstract":{"cdata!":"The development objective of the Regional Emergency Preparedness and Access to Inclusive Recovery Project for Eastern and Southern Africa is to strengthen the financial and operational preparedness of participating countries to respond quickly to climate and other shocks. The project comprises of two components. The first component, regional climate risk fund will establish and capitalize a regional climate risk fund (RCRF) to provide participating countries with access to pre-arranged and cost-efficient financing in anticipation of climate and other shocks. The second component, technical assistance and operationalization of the RCRF will support the operationalization of the RCRF and the operational preparedness of country delivery channels to facilitate swift flow of funds upon a shock."}},"P181591":{"id":"P181591","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Development Policy Lending","project_name":"Ethiopia First Sustainable and Inclusive Growth Development Policy Operation","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"1,500,000,000","boardapprovaldate":"2024-07-30T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181591","status":"Active","project_abstract":{"cdata!":"This Development Policy Operation (DPO) is the first in a programmatic series of two operations to support the Government of Ethiopia’s efforts to: (i) advance financial sector restructuring and trade liberalization, (ii) promote fiscal sustainability and transparency, and (iii) enhance social resilience and climate action. It comprises an International Development Association (IDA) grant in the amount of SDR 760.3 million (US$1,000 million equivalent) and an IDA credit in the amount of SDR 380.2 million (US$500 million equivalent). The DPO series supports reforms that help to address market distortions and constraints undermining macroeconomic stability and inclusive private-sector-led growth. This DPO series is part of a broader stabilization program that includes a four-year International Monetary Fund (IMF) Extended Credit Facility (ECF) program and expected debt treatment from the G20 Common Framework. The stabilization program supports the liberalization of the foreign exchange (FX) market and complementary measures to reduce financial and fiscal risks, promote trade, mobilize revenues, and expand social safety nets to mitigate the effects of the adjustment on the poor. This DPO is aligned with a forthcoming World Bank Country Partnership Framework for Ethiopia (CPF, FY2025-30) and the 2024 Ethiopia Country Climate and Development Report (CCDR)."}},"P501988":{"id":"P501988","countryname":["Somali Democratic Republic"],"lendinginstr":"Development Policy Lending","project_name":"First Somalia Economic Resilience Development Policy Financing","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-07-30T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501988","status":"Active","project_abstract":{"cdata!":"The development objective of the First Somalia Economic Resilience Development Policy Financing for Somalia is to promote economic resilience through more sustainable public finances and resilient private sector development. Pillar A aims to ensure sustainable public finances. This will contribute to the macroeconomic stability and will expand fiscal space required to meet Somalia’s large development needs in the context of high volatility to climate change and fragility, conflict, and violence. Pillar B aims to enable resilient private sector development. This pillar supports structural reforms that enhance the environment for private-sector-led growth and create conditions for job creation, increasing the resilience of households."}},"P506269":{"id":"P506269","countryname":["Democratic Republic of Sao Tome and Prin"],"lendinginstr":"Investment Project Financing","project_name":"Safeguarding Access to Fiscal and Educational Resources Project","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-07-30T00:00:00Z","closingdate":"1/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P506269","status":"Active","project_abstract":{"cdata!":"The development objectives of the Safeguarding Access to Fiscal and Educational Resources Project for Sao Tome and Principe are to support continued access to education and contribute to addressing sources of fiscal pressure emanating from the energy sector in Sao Tome and Principe. The project comprises of three components. The first component, emergency financing to ensure continued access to quality education will finance targeted recurrent operating costs, including salaries of personnel in the education sector. It consists of following sub-components: (i) payment of salaries for personnel in the education sector; and (ii) auxiliary expenses for schools. The second component, technical assistance to support the Recipient’s fiscal stabilization program will support the government’s commitment to improve the energy sector’s sustainability and limit its negative fiscal impact. The third component, project management will finance the operating costs of the Project Implementation Unit (PIU) under the Project Administration and Fiduciary Agency (Agência Fiduciária de Administração de Projectos - AFAP), including monitoring and evaluation, project audits, review of teacher payroll, management of environmental and social (E and S) risks, financial management and procurement functions and other operating costs required for the implementation of the project."}},"P181649":{"id":"P181649","countryname":["Republic of Azerbaijan"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Employment Support Project","p2a_updated_date":"2024-09-13 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-07-29T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181649","status":"Active"},"P500611":{"id":"P500611","countryname":["Republic of Serbia"],"lendinginstr":"Investment Project Financing","project_name":"Second Real Estate Management Project","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"32,550,000","boardapprovaldate":"2024-07-29T00:00:00Z","closingdate":"7/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500611","status":"Active","project_abstract":{"cdata!":"The objective of the Second Real Estate Management Project is to improve the transparency, accessibility, and reliability of Serbia’s real property management systems. There are three components to the project, the first component being implementation of the property mass valuation system. Activities will be financed via two sub-components:  support to mass valuation for residential and non-residential properties, and building register advancement. The second component is the integration of information systems and NSDI services development. This component includes three subcomponents: further development and rollout of the integrated system for real estate cadaster, support to the national spatial data infrastructure, and digital archive. Finally, the third component is the institutional Improvement, RGA sustainability, and project management. This component includes two subcomponents: institutional improvement and RGA sustainability, and project management."}},"P502837":{"id":"P502837","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Türkiye Small Industrial Estates Reconstruction and Regional Economic Recovery Project","p2a_updated_date":"2024-08-01 00:00:00.0","totalcommamt":"600,000,000","boardapprovaldate":"2024-07-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502837","status":"Active","project_abstract":{"cdata!":"The development objective of the Small Industrial Estates Reconstruction and Regional Economic Recovery Project for Türkiye is to support the restoration and sustainability of micro, small, and medium enterprises (MSME) operations in the earthquake-affected provinces through building resilient and low-emission small industrial estates (SIEs). The project comprises of two components. The first component, construction of resilient and low-emission SIEs will finance the construction of approximately 1,600 workshops within seven new SIEs, which will then be sold to eligible MSMEs. The second component, technical assistance and project management will provide technical assistance and capacity building to key stakeholders, including Ministry of Industry and Technology (MoIT), beneficiary MSMEs, SIE sites management, and others. It consists of the following sub-components: (i) project management and support for the Project Implementation Unit (PIU); and (ii) technical assistance and capacity building for MoIT, SIE site management teams, and MSMEs."}},"P181517":{"id":"P181517","countryname":["Romania"],"lendinginstr":"Development Policy Lending","project_name":"Romania Fiscal Management and Green Growth Development Policy Loan","p2a_updated_date":"2024-07-29 00:00:00.0","totalcommamt":"650,000,000","boardapprovaldate":"2024-07-25T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181517","status":"Active","project_abstract":{"cdata!":"Romania has made considerable economic progress over the past two decades, but it needs more sustainable and inclusive growth. Over the past decades, Romania has achieved impressive economic progress, transitioning to a market-based economic model, and acceding to the European Union (EU) in 2007 and reaching high income status. Real Gross Domestic Product (GDP) per capita in purchasing power parity (ppp) more than doubled from US12,177 dollars in 2000 to US32,496 dollars in 2022 and income convergence with the EU accelerated. From 2015 to 2020, the share of Romanians living below the upper-middle-income poverty line (i.e., on less than US6.85 dollars a day in 2017 ppp) declined rapidly from 27.8 to 10.7 percent. However, economic prosperity has been unevenly distributed, with widening regional disparities in income and service delivery, and poverty and inequality rates that are consistently among the highest in the EU. Going forward, inclusive growth objectives will need to be reconciled with equally ambitious climate commitments. The program supported by this DPL builds on the focus areas of the Systematic Country Diagnostic (SCD) Update, recommendations from the Country Climate and Development Report (CCDR), Country Private Sector Diagnostic (CPSD) and other analytics like the forthcoming Public Finance Review (PFR). It also links to complementary technical assistance (TA) through trust funded, Reimbursable Advisory Services (RAS) and upstream advisory engagements, including joint IBRD-IFC work on creating a more favorable policy and regulatory environment for private capital and investment, which continue to support the program’s implementation. The DPL is aligned with the CPF, with considerations for the linkages and cross-sectoral nature of issues in an advanced economy with a rapidly aging population, being at the global frontier of climate action, with corresponding potential for knowledge spillovers, particularly on partnering with the EU and private sector."}},"P504421":{"id":"P504421","countryname":["Republic of The Gambia"],"lendinginstr":"Investment Project Financing","project_name":"Regional Solar Park of The Gambia","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"1,350,000","boardapprovaldate":"2024-07-24T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504421","status":"Active"},"P180925":{"id":"P180925","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"BDI Human Capital Development Project","p2a_updated_date":"2024-07-24 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-07-22T00:00:00Z","closingdate":"7/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180925","status":"Active","project_abstract":{"cdata!":"The objective of the Human Capital Development Project for Burundi is to empower boys and girls through improved access to quality nutrition, healthcare, and basic education services in Burundi. There are four components to the project, the first component being addressing demand-side determinants for education and health access across the lifecycle. This component includes two subcomponents: scale up demand-side-PBF coverage of key nutrition, and birth control services, and ensuring the most vulnerable learners are ready and equipped to learn. The second component is the improving the supply of education and health services across the lifecycle. This component includes three subcomponents: Improving learning environments, improving teaching, and learning at scale, and capitalizing on the supply-side performance-based financing for healthcare quality. The third component is the improving system governance and project management. This component includes two subcomponents: improving system governance, and project management, monitoring and evaluation. finally, the fourth component is the contingent emergency response."}},"P504373":{"id":"P504373","countryname":["Republic of the Marshall Islands"],"lendinginstr":"Development Policy Lending","project_name":"RMI Enhancing Fiscal Management and Building Disaster and Climate Resilience DPO with a Cat DDO","p2a_updated_date":"2024-07-22 00:00:00.0","totalcommamt":"21,000,000","boardapprovaldate":"2024-07-19T00:00:00Z","closingdate":"9/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504373","status":"Active","project_abstract":{"cdata!":"The development objectives of the Enhancing Fiscal Management and Building Disaster and Climate Resilience Development Policy Operation with a Catastrophe Deferred Drawdown Option for Marshall Islands are to: (i) enhance fiscal management; and (ii) build disaster and climate resilience. Pillar 1 focuses on the establishment of financial management processes and procurement practices for sound fiscal management and spending efficiency. Pillar 2 supports a suit of actions to prepare for and respond to climate change and disasters. The Republic of the Marshall Islands (RMI) national strategic plan 2020-30 (NSP) outlines the long-term development strategy. The objective of the NSP is to attain sustainable, equitable, and measurable development that reflects the priorities and cultural values. Developed through extensive consultation, the NSP is divided into five main pillars including (i) social and culture; (ii) environment, climate change, and resilience; (iii) infrastructure; (iv), economic development; and (v) governance."}},"P181221":{"id":"P181221","countryname":["Republic of Botswana"],"lendinginstr":"Investment Project Financing","project_name":"Renewable Energy Support and Access Accelerator Project","p2a_updated_date":"2024-07-15 00:00:00.0","totalcommamt":"88,000,000","boardapprovaldate":"2024-07-11T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181221","status":"Active","project_abstract":{"cdata!":"The development objective of the Renewable Energy Support and Access Accelerator Project for Botswana is to enable renewable energy grid integration in Botswana and improve electricity service in selected rural areas. The project comprises of three components. The first component, grid upgrades to enable integration and management of variable renewable energy (VRE) consists of following sub-components: (i) support: the design, supply, installation, commissioning, and operation and maintenance (O and M) of utility-scale battery energy storage systems (BESS) for an estimated capacity and energy of approximately 50MW/200MWh, and the owner’s engineer, who will assist Botswana Power Corporation (BPC) in the supervision of the BESS procurement, construction and commissioning; (ii) installation of static synchronous compensator (STATCOM) at selected substations (planned at Francistown 1, Legothwane, Segoditshane 1, and Ramotswa (132 kV networks)); and (iii) digital upgrades of network control and customer services to enable monitoring of loads and improve operation efficiency, maintenance and planning. The second component, local transmission and distribution (T and D) network upgrades to support rural electrification aims to increase reliability of power supply for existing and future customers in rural villages of Southern districts, by supplying them with reliable domestic power and reducing import of electricity from South Africa. The third component, project management and technical assistance (TA) to support VRE deployment is expected to play a key role in enabling private sector investments and in supporting the utility in this business model transition. It consists of following sub-components: (i) project management; and (ii) VRE deployment."}},"P179642":{"id":"P179642","countryname":["Jamaica"],"lendinginstr":"Investment Project Financing","project_name":"Kingston Waterfront Improvement Project - SOP 1","p2a_updated_date":"2024-07-11 00:00:00.0","totalcommamt":"12,000,000","boardapprovaldate":"2024-07-09T00:00:00Z","closingdate":"11/12/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179642","status":"Active","project_abstract":{"cdata!":"The development objective of Kingston Waterfront Improvement Project for Jamaica is to develop high-quality designs to improve the Kingston Waterfront, expand economic development opportunities, and enhance the institutional capacity to enable future private sector-led redevelopment. This project has five components. 1) The first component, Designs for a green, resilient, and inclusive waterfront, will finance the design of a linear, multi-use park along Downtown Kingston’s waterfront, stretching along Ocean Boulevard from Port Royal Street to the East abutting the recently completed Boardwalk and the Kingston Pen Gully to the West. 2) The second component, Urban upgrading and economic development in Downtown Kingston, has the following sub-components: (i) Designs for basic urban infrastructure upgrading; (ii) Fostering economic development; and (iii) Community outreach, activation, and inclusion. 3) The third component, Enhance the institutional capacity to enable future private sector-led redevelopment, will finance technical assistance (TA) to relevant government agencies to attract private investors for developing blighted and underutilized sites within and adjacent to the waterfront. 4) The fourth component, Project management, will support the administrative management of KiWI SOP 1 by JSIF and implementing partners. 5) The fifth component, Contingent Emergency Response, will allow for rapid reallocation of uncommitted project funds towards urgent needs in the event of a disaster (geophysical, climate-related, or man-made), or public health emergency."}},"P181404":{"id":"P181404","countryname":["Eastern and Southern Africa"],"lendinginstr":"Program-for-Results Financing","project_name":"Additional Financing to the EAC Regional Statistics Program for Results","p2a_updated_date":"2024-07-10 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2024-07-08T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181404","status":"Active"},"P500587":{"id":"P500587","countryname":["Kingdom of Lesotho"],"lendinginstr":"Investment Project Financing","project_name":"Lesotho Education Improvement Project","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2024-07-01T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500587","status":"Active"},"P181711":{"id":"P181711","countryname":["Republic of Zambia"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for Scaling-up Shock Responsive Social Protection Project","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"207,600,000","boardapprovaldate":"2024-07-01T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181711","status":"Active"},"P177146":{"id":"P177146","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Urban Resilience Emergency Project","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"113,000,000","boardapprovaldate":"2024-07-01T00:00:00Z","closingdate":"7/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177146","status":"Active","project_abstract":{"cdata!":"The development objective of Urban Resilience Emergency Project for Burundi is to respond to the flood emergency, increase flood resilience, and improve climate-resilient urban management in Bujumbura. This project has four components. 1) The first component, Emergency Flood Response and Climate-Resilient Infrastructure, has the following sub-components: (i) Emergency Response Interventions; (ii) Climate-Resilient Infrastructure; and (iii) Strategic studies for urban and flood risk management investments and resilient urban services. 2) The second component, Capacity Building and Institutional Strengthening for Urban Resilience, has the following sub-components: (i) Strengthening capacity for improved information, flood early warning services and emergency preparedness; (ii) Urban Management Capacity Building; and (iii) Strengthening the Resilience and Performance of Urban Water Services. 3) The third component, Project management, will finance incremental project management costs for the Project Implementation Unit (PIU). 4) The fourth component, Contingency Emergency Response, will provide an immediate response to an eligible crisis or emergency, as needed, by financing the implementation of emergency infrastructure rehabilitation and reconstruction."}},"P503776":{"id":"P503776","countryname":["Republic of Mali"],"lendinginstr":"Investment Project Financing","project_name":"Advancing Resilience and Inclusive Health Systems for Everyone (ARISE - KENEYA YIRIWALI) in Mali","p2a_updated_date":"2024-06-29 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503776","status":"Active","project_abstract":{"cdata!":"The development objective of Advancing Resilience and Inclusive Health Systems for Everyone in Mali Project is to improve accessibility and utilization of quality essential reproductive, maternal, neonatal, child, adolescent health and nutrition services as well as to strengthen preparedness for health emergencies in targeted areas. This project has five components. 1) The first component, Improve the supply and availability of quality health services for the population, has the following sub-components: (i) Climate adaptive horizontal and vertical expansion of PBF; (ii) Support to PBF implementation and institutionalization; and (iii) Enhancing Healthcare Quality and Regulation. 2) The second component, Facilitate access to healthcare and nutrition services by removing barriers and supporting community services, has the following sub-components: (i) Support for Community Health and Nutrition; and (ii) Support for School Health and Adolescent Health. 3) The third component, Strengthening Health Systems for UHC, has the following sub-components: (i) Support to Health Financial Management Reforms; (ii) Support to Health Financing Reforms; (iii) Strengthening the Health Management Information System; and (iv) Optimizing Surveillance, Preparedness and Response to Epidemics and Climate Sensitive Diseases. 4) The fourth component, Project Coordination, Management and Monitoring, aims to ensure an effective and efficient technical and fiduciary management and implementation of the project. 5) The fifth component, Contingent Emergency Response Component, aims to allow for rapid reallocation of IDA grant uncommitted funds in the event of an eligible emergency."}},"P176812":{"id":"P176812","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Bay Terminal Marine Infrastructure Development Project","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"650,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"6/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176812","status":"Active"},"P179482":{"id":"P179482","countryname":["Republic of Armenia"],"lendinginstr":"Program-for-Results Financing","project_name":"Armenia - Enabling Universal Health Coverage Program","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"109,400,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"9/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179482","status":"Active"},"P504701":{"id":"P504701","countryname":["Republic of Armenia"],"lendinginstr":"Investment Project Financing","project_name":"Mental health and psychosocial support in Armenian schools","p2a_updated_date":"2024-06-29 00:00:00.0","totalcommamt":"2,600,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"11/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504701","status":"Active"},"P181659":{"id":"P181659","countryname":["Republic of The Gambia"],"lendinginstr":"Investment Project Financing","project_name":"Third AF to The Gambia Essential Health Services Strengthening Project","p2a_updated_date":"2024-06-29 00:00:00.0","totalcommamt":"35,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181659","status":"Active"},"P181195":{"id":"P181195","countryname":["Republic of India"],"lendinginstr":"Development Policy Lending","project_name":"Second Low-Carbon Energy Programmatic Development Policy Financing","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"1,500,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181195","status":"Active","project_abstract":{"cdata!":"India has made very significant development progress in recent decades and is expected to remain on an ascendent trajectory: its aspirations to become a high-income economy by 2047 would require it to elevate its rate of growth even further. From 1991 to today, the size of the economy has multiplied more than ten times, and gross domestic product (GDP) per capita seven times. From 1993-2022, the extreme poverty rate declined from 48 percent to 12.9 percent, reducing the number of extreme poor people by about 262 million. India’s past achievements set the tone for its future ambitions, notably the target to reach high income by 2047, which will require the economy to grow at 8 percent per annum on average over the next two decades. The actions supported under the proposed operation reflect India’s resolute and pragmatic approach to addressing climate change challenges. India’s policymakers are attempting to strike a complex balance between multiple objectives that entail inherent tradeoffs: boosting growth and innovation, including through targeted industrial policies; achieving energy security; and, contributing to global climate change objectives. Providing secure and affordable energy supply is a top priority for the GoI, with coal remaining the cheapest baseload supply available. The GoI’s drive to promote domestic manufacturing through “Make in India” will boost domestic productive capacity in RE, but it pushes up RE costs in the short-to-medium term, potentially delaying the large-scale adoption of RE. India’s policymakers are also trying to maximize the leveraging of public spending to crowd in the private sector and domestic commercial financing resources by providing just enough support to elicit private sector interest and drive down the cost curves, while optimizing the use of public resources."}},"P177841":{"id":"P177841","countryname":["People's Republic of China"],"lendinginstr":"Investment Project Financing","project_name":"Shaanxi Energy Transition and Innovation Demonstration in the Heating Sector","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177841","status":"Active"},"P179276":{"id":"P179276","countryname":["Republic of Niger"],"lendinginstr":"Investment Project Financing","project_name":"Livestock and Agriculture Modernization Project (LAMP)","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"9/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179276","status":"Active"},"P180336":{"id":"P180336","countryname":["Republic of the Philippines"],"lendinginstr":"Development Policy Lending","project_name":"Philippines Second Sustainable Recovery Development Policy Loan","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180336","status":"Active","project_abstract":{"cdata!":"This program document proposes the second operation in a programmatic series of two Development Policy Loans (DPLs) supporting a sustainable economic recovery, in the amount of US 750 million dollars equivalent. The Program Development Objectives (PDOs) and pillars of the operation are to support the Government of the Philippines (GOP) to: 1) accelerate the economic recovery and boost long-term growth; and 2) protect the environment and improve climate resilience. Pillar 1 supports reforms to attract private investment in infrastructure and renewable energy (RE) and to mobilize and scale up sustainable finance. Pillar 2 supports reforms to improve plastic waste management, promote green transport and green procurement, and strengthen the resilience of the agriculture sector. The first operation supported foundational reforms and general implementation frameworks. The second operation builds on these foundations, focusing on the implementation of these reforms. The DPL series supports government reform efforts in accelerating the economic recovery, boosting long-term growth, and protecting the environment and improving climate resilience. Pillar 1 supports reforms to attract private investment in public infrastructure, especially in domestic shipping, and in RE, especially in offshore wind (OSW), increase investment in infrastructure through public-private partnerships (PPPs), and mobilize sustainable finance. These reforms will facilitate the transition to a low-carbon economy while achieving greater energy security and lower energy costs. Pillar 2 supports reforms to enhance plastic waste management, promote the adoption of electric vehicles (EVs), mainstream green procurement, and protect the national budget and farmers from climate-related risks in the agriculture sector. Collectively, these reforms would contribute to climate change mitigation and pollution management and improve its resilience to climate risks. The reforms are in line with the priorities outlined in the Philippine Development Plan (PDP) 2023–2028, which calls for fundamental transformations across economic, institutional, environmental, and social sectors."}},"P180936":{"id":"P180936","countryname":["Republic of the Philippines"],"lendinginstr":"Investment Project Financing","project_name":"Infrastructure for Safer and Resilient Schools","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-06-28T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180936","status":"Active"},"P502532":{"id":"P502532","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Inclusive Digitalization in Eastern and Southern Africa (IDEA)","p2a_updated_date":"2024-06-28 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"10/31/2032 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502532","status":"Active"},"P505118":{"id":"P505118","countryname":["Hashemite Kingdom of Jordan"],"lendinginstr":"Development Policy Lending","project_name":"Jordan Human Capital Program","p2a_updated_date":"2024-06-28 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505118","status":"Active","project_abstract":{"cdata!":"The Human Capital Program aims to (i) improve the governance and effectiveness of social sectors and (ii) safeguard households against climate and health shocks. Efficiency and sustainability are cross-cutting themes that span both pillars. The proposed Program addresses gaps in the legal and regulatory framework that hinder the effectiveness and resilience of institutions in enhancing human capital and reflects the mature policy dialogue and robust analytic work program that helped inform the feasibility, appropriateness, and impact of proposed policy and institutional reforms. The Japan International Cooperation Agency and the OPEC Fund for International Development are planning to provide parallel complementary financing to the reform program. The People-Centric Digital Government Program for Results (PforR), the Enhancing Women’s Economic Opportunities Operation PforR, the proposed Modernizing Education, Skills, and Administrative Reforms (MASAR) PforR, and the pipeline proposed Health System Strengthening PforR help support the implementation of policy actions under this Program. Also, while this DPF is focused on human capital development, competitiveness and growth is being addressed in the Inclusive, Transparent, and Climate Responsive Investments PforR and the Multi-donor Trust Fund on Growth, which is being considered as a focus area for an FY25 DPF/PforR operation as highlighted in the country partnership framework (CPF). Moreover, since the new Extended Fund Facility (EFF) of the International Monetary Fund (IMF) addresses Jordan’s broader macro-fiscal challenges (such as domestic resource mobilization and expenditure-side reforms in the water and energy sectors), this proposed Program presents an opportunity to address pending constraints on enhancing and preserving human capital, critical to unleashing Jordan’s growth potential."}},"P180693":{"id":"P180693","countryname":["Republic of Angola"],"lendinginstr":"Investment Project Financing","project_name":"Angola Digital Acceleration Project","p2a_updated_date":"2024-07-11 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180693","status":"Active"},"P180495":{"id":"P180495","countryname":["Democratic Republic of the Congo"],"lendinginstr":"Investment Project Financing","project_name":"DRC Digital Transformation Project","p2a_updated_date":"2024-07-11 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180495","status":"Active"},"P505095":{"id":"P505095","countryname":["Republic of Malawi"],"lendinginstr":"Investment Project Financing","project_name":"Digital Malawi Acceleration Project (DMAP)","p2a_updated_date":"2024-07-11 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"10/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505095","status":"Active"},"P503369":{"id":"P503369","countryname":["Hashemite Kingdom of Jordan"],"lendinginstr":"Program-for-Results Financing","project_name":"Jordan: Modernizing Education, Skills, and Administrative Reforms (MASAR) Operation","p2a_updated_date":"2024-06-28 00:00:00.0","totalcommamt":"1,882,870,000","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503369","status":"Active","project_abstract":{"cdata!":"The development objective of the Modernizing Education, Skills, and Administrative Reforms (MASAR) Operation for Jordan is to improve access to foundational learning and to labor market-relevant technical and vocational education and training (TVET) and enhance the efficiency of the education sector management. To address challenges in the education system, the economic modernization vision (EMV) includes a transformative and ambitious plan for the sector under the smart Jordan growth pillar, which aims to develop and prepare local talent to meet the needs of future skills, required resources and institutions to accelerate economic growth and enhance quality of life. Smart Jordan consists of a comprehensive package of reforms with the potential to transform the education sector, focusing on 6 pillars: (a) ECCD (including early childhood and early primary education for children under nine years old); (b) basic education (primary and secondary); (c) higher education; (d) TVET; (e) research and development and innovation; (f) entrepreneurship; and (g) data. It includes digitalization, governance, and legal environment as crosscutting areas. The operation will support key elements and incentivize results to increase efficiency in the implementation of selected interventions of the government program."}},"P181021":{"id":"P181021","countryname":["People's Republic of China"],"lendinginstr":"Program-for-Results Financing","project_name":"Sustainable Fodder Production and Low Methane Livestock Development Program-for-Results","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181021","status":"Active","project_abstract":{"cdata!":"The development objective of the Sustainable Fodder Production and Low Methane Livestock Development Program-for-Results (PforR) for China is to improve productivity and lower methane emissions in selected livestock subsectors and enhance the governance system for greening the livestock sector in the Program Counties of Gansu Province. The program is anchored in the Country Climate and Development Report (CCDR) and fully aligned with the World Bank’s global commitments, World Bank Group (WBG’s) green, resilient and inclusive development framework, the WBG’s climate change action plan (2021-2025), and the World Bank’s gender strategy. The Program supports implementation of climate mitigation and adaptation actions identified under the CCDR, which highlights the use of low-emission practices and technologies in agriculture sector as key for emission reduction. It also follows the CCDR recommendation on the realignment of subsidies in the agriculture sector, which is coordinated with the targeted investment in measurement, reporting, and verification (MRV) systems, to allow for the gradual shift in payments toward environmental outcomes. It will support institutional strengthening and capacity building to create the enabling environment for scaling up sustainable low-emission livestock production. The PforR is expected to contribute to the WB’s new scorecard and climate commitments by promoting productivity and reducing greenhouse gas (GHG) emissions from livestock sector. Responding to the WB’s Gender strategy, the Program aims to address the issues of women’s access to agricultural inputs and other productive resources, extension services, and trainings which will enable women to benefit from economic opportunities in livestock sector while increasing their representation in decision-making processes."}},"P179313":{"id":"P179313","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Türkiye Flood and Drought Management Project","p2a_updated_date":"2024-06-30 00:00:00.0","totalcommamt":"600,000,000","boardapprovaldate":"2024-06-27T00:00:00Z","closingdate":"12/31/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179313","status":"Active","project_abstract":{"cdata!":"The objectives of the Flood and Drought Management Project are to increase flood control for people living in selected areas of Türkiye and to strengthen the country's institutional capacity for flood and drought risk management. There are four components to the project, the first component being Flood Management. This component includes two subcomponents: flood control, and flood monitoring, forecasting, and warning systems. The second component is the drought management. This Component will support DSI in drought monitoring and help reduce the vulnerability of population to climate change exacerbated drought in selected basins through implementation of non-structural measures under the following activities: technical study on drought monitoring in türkiye, and pilot for real-time drought monitoring and forecast in ceyhan basin, scaling-up the real-time monitoring and drought forecast system, and technical studies for designing larger-scale future investments for drought management. The third component is the capacity development and institutional strengthening. Finally, the fourth component is the project management. This Component will include consulting, non-consulting services and operating costs for DSI and DGWM for implementation of the Project according to the Bank policies and guidelines."}},"P179410":{"id":"P179410","countryname":["Republic of Congo"],"lendinginstr":"Program-for-Results Financing","project_name":"Transforming the Education Sector for Better Outcomes and Results (TRESOR)","p2a_updated_date":"2024-06-28 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2024-06-26T00:00:00Z","closingdate":"7/8/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179410","status":"Active","project_abstract":{"cdata!":"The Republic of Congo (RoC) is a lower-middle-income, oil-dependent country with a population of about 6.1 million in 2023 and a gross domestic product (GDP) per capita of US1,504.70 dollars in 2022. Around 58 percent of the population lives in urban areas and 47 percent is under 18 years of age. Almost two-thirds of the land is covered by tropical forests and less than one-third is arable, although 60 percent of the population is engaged in agriculture. The economy is dominated by the oil sector, which accounts for more than half of the GDP and 80 percent of exports. The global oil price shock between 2014 and 2016 plunged the economy into recession, with real GDP declining by 4.6 percent per year between 2015 and 2019. This was further exacerbated by the sharp decline in economic activity and global demand for oil occasioned by the COVID-19 pandemic and related lockdown. The country recently returned to debt sustainability, albeit it is still in debt distress. Debt sustainability remains highly sensitive to oil prices. Under the National Development Plan (NDP, 2022-2026), the RoC has expressed its commitment to supporting investments in human capital to provide the country with a skilled workforce. The vision for the education sector is described in the Education Sector Strategy (ESS, 2021-2030), which aims to provide at least 10 years of basic education6 to all children, as planned by law. These ambitions are reinforced in the Government’s Etats Généraux8 report, which outlines detailed plans for a transformed education system by 2030. Further, the President of the RoC declared 2024 to be the Year of Youth, with a focus on supporting youth by helping them to develop job-relevant skills and providing them with opportunities to access high-quality employment."}},"P501343":{"id":"P501343","countryname":["Republic of Congo"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening Electricity Services Project","p2a_updated_date":"2024-06-27 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-26T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501343","status":"Active","project_abstract":{"cdata!":"The objective of the Strengthening Electricity Services Project for Republic of Congo is to improve the quality of electricity service delivery, improve the performance of the distribution and retail segment, and improve access to electricity. There are four components to the project, the first component being strengthening the electricity transmission system. This component includes three subcomponents: construction, rehabilitation, and upgrade of transmission substations, Rehabilitation of selected segments of the 220 kV line connecting Pointe-Noire to Brazzaville, and upgrade of the existing supervisory control and data acquisition (SCADA) system and other systems of the National Dispatch Center. The second component is the improving the operational performance of the electricity distribution and retail (D&R) segment. This component includes three subcomponents: densification, rehabilitation and upgrade of the distribution and public lighting network, improving commercial performance of E2C by sustainably reducing non-technical losses in electricity supply, and Incorporation of management information systems (MIS) to improve efficiency, transparency, and accountability of operations of E2C in key business areas. The third component is the Technical Assistance (TA) and project management. This component includes three subcomponents: technical assistance and institutional support to improve electricity sector performance, technical assistance and institutional support to water and sanitation stakeholders, and project management and capacity building. Finally, the fourth component is the Contingent Emergency Response Component (CERC)."}},"P181494":{"id":"P181494","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Sustainable and Clean Energy Access Transformation in Burundi (ASCENT Burundi)","p2a_updated_date":"2024-06-28 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-06-26T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181494","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Project using the Multiphase Programmatic Approach (MPA) is to increase access to electricity for households, enterprises, and public institutions in Burundi. There are four components to the project, the first component being network reinforcement outside of Bujumbura. The second component is the rehabilitation, densification, modernization, and extension of distribution network in Bujumbura and surrounding areas. The third component is the private sector distribution pilot. Finally, the fourth component is the power sector sustainability. This component will support reforms, sector dialogue, and institutional development to ensure power sector sustainability with the aim to accelerate electricity access in Burundi."}},"P500777":{"id":"P500777","countryname":["Europe and Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"Second Energy Efficiency in Public Buildings under the E3 MPA","p2a_updated_date":"2024-06-26 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-06-25T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500777","status":"Active","project_abstract":{"cdata!":"The objective of the Scaling Up Energy Efficiency in Europe and Central Asia Program Using the Multiphase Programmatic Approach (MPA) Including Phase 1 Loans to Türkiye and Moldova is to increase energy efficiency savings in participating countries of the Europe and Central Asia (ECA) region and develop enabling policies and programs for the scale-up of energy efficiency. The E3 MPA has two components: component 1, financing the scale-up of EE investments and component 2, policy and regulatory reforms and other enabling activities. Investments under component 1 would result in projected lifetime energy savings and projected lifetime net GHG emissions (prDO-level indicator 2 and corporate scorecard indicator). Activities under component 2 will result in adoption/amendment of policies and regulations to scale up and sustain energy savings (PrDO-level indicator 3). These policy reforms would provide some energy savings during the E3 MPA’s implementation period and pave the way for scaled-up impacts in the years ahead. Moreover, enabling activities under component 2 will also help address many of the policy, financial, informational, and other barriers noted earlier; thus, the programmatic nature of the MPA will better enable the gradual and systematic scale-up of EE investments and private capital mobilized or enabled (PCM/PCE) over time. Energy savings would also enable reduced energy imports and fossil fuel use, reduced global and local emissions, increased economic productivity and jobs, contributing to low-carbon, resilient development."}},"P500560":{"id":"P500560","countryname":["Republic of Moldova"],"lendinginstr":"Investment Project Financing","project_name":"Sustainable Transition through Energy Efficiency in Moldova Project (STEEM)","p2a_updated_date":"2024-07-11 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-25T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500560","status":"Active","project_abstract":{"cdata!":"The objective of the Scaling Up Energy Efficiency in Europe and Central Asia Program Using the Multiphase Programmatic Approach (MPA) Including Phase 1 Loans to Türkiye and Moldova is to increase energy efficiency savings in participating countries of the Europe and Central Asia (ECA) region and develop enabling policies and programs for the scale-up of energy efficiency. The E3 MPA has two components: component 1, financing the scale-up of EE investments and component 2, policy and regulatory reforms and other enabling activities. Investments under component 1 would result in projected lifetime energy savings and projected lifetime net GHG emissions (prDO-level indicator 2 and corporate scorecard indicator). Activities under component 2 will result in adoption/amendment of policies and regulations to scale up and sustain energy savings (PrDO-level indicator 3). These policy reforms would provide some energy savings during the E3 MPA’s implementation period and pave the way for scaled-up impacts in the years ahead. Moreover, enabling activities under component 2 will also help address many of the policy, financial, informational, and other barriers noted earlier; thus, the programmatic nature of the MPA will better enable the gradual and systematic scale-up of EE investments and private capital mobilized or enabled (PCM/PCE) over time. Energy savings would also enable reduced energy imports and fossil fuel use, reduced global and local emissions, increased economic productivity and jobs, contributing to low-carbon, resilient development."}},"P180498":{"id":"P180498","countryname":["Republic of Liberia"],"lendinginstr":"Investment Project Financing","project_name":"Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2","p2a_updated_date":"2024-06-25 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-24T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180498","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Phase of the Electricity Sector Strengthening and Access Project for Liberia is to expand the access to electricity services and enhance the operational performance of the Liberia Electricity Corporation (LEC). The project comprises of three components. The first component, rehabilitation and expansion of electricity infrastructure and systems and enhancement of LEC revenue protection will support rehabilitation and expansion of the electricity infrastructure and systems, and further enhance the LEC financial performance. It consists of following sub-components: (i) rehabilitation and expansion of the distribution network; and (ii) revenue protection program. The second component, off-grid electrification of households, public facilities, and stimulation of productive uses in rural areas will scale up the activities under the first phase off-grid electrification component with a focus on mobilizing private capital. It consists of following sub-components: (i) electrification of public health and education facilities in rural areas; (ii) deployment of solar home systems for households and off-grid productive uses; and (iii) piloting private sector led mini grids. The third component, technical assistance, training, and capacity building of project implementation support will cover the cost of strengthening the capacity of LEC Project Implementation Unit (PIU) to manage and monitor implementation of activities."}},"P504910":{"id":"P504910","countryname":["Arab Republic of Egypt"],"lendinginstr":"Development Policy Lending","project_name":"Generating Resilience, Opportunities, and Welfare for a Thriving Egypt (GROWTH)","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"12/1/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504910","status":"Active","project_abstract":{"cdata!":"Egypt stands at an inflection point in its social and economic development journey. While reforms implemented since 2016 had helped improve economic buffers, economic imbalances remained. These imbalances were exacerbated by external shocks leading to capital flight in March 2022 as investors became concerned about the sustainability of policy settings. The revised International Monetary Fund (IMF) program, as part of a collective development partner effort that includes this proposed operation has helped address immediate, short-term financing needs and restore confidence. However, the necessity for significant medium-term reforms to engender long-term recovery underscores the imperative to realign structural reform priorities. This US700 million dollars operation is the first in a programmatic series of three single-tranche development policy financings (DPFs) to support the Government of Egypt (GoE) in addressing current, longer-term economic challenges and advancing a next generation of reforms. The objective is to shift toward more private sector participation, better macroeconomic and fiscal resilience, and a greener growth trajectory that are essential for a reorientation to a more competitive economy capable of sustainably reducing poverty and increasing shared prosperity. Commitment to these objectives is clear in Egypt’s Sustainable Development Strategy Vision 2030 and National Climate Change Strategy (NCCS) 2050 which center around Green, Inclusive and Resilient Development (GRID). In addition, the Egyptian State Ownership Policy (SOP) regulates the state’s ownership and participation in economic activities, aiming to enhance the private sector’s role in the economy. The United Kingdom has expressed interest in extending a guarantee to IBRD (US200 million dollars), which will expand the initially planned US$500 million IBRD loan amount, bringing the total operation to US700 million dollars. The Asian Infrastructure and Investment Bank (AIIB) also intends to provide US300 million dollars in parallel finance linked to the same reform matrix, with its approval expected within months of this DPF, bringing the total lending to US1 billion dollars. This three-year operation along with the contributions of other partners, complementary initiatives such as the proposed state-owned enterprise (SOE) Program-for-Results (SOE PforR), and International Finance Corporation’s (IFC) work on asset monetization; will contribute significantly to rebuilding trust and resetting expectations."}},"P169954":{"id":"P169954","countryname":["Socialist Republic of Vietnam"],"lendinginstr":"Investment Project Financing","project_name":"Southern Waterway Corridors and Logistics Development Project","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"107,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"12/15/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P169954","status":"Active","project_abstract":{"cdata!":"The objective of the Southern Waterway Corridors and Logistics Development Project for Vietnam is to improve the capacity, efficiency, and safety of the transport infrastructure of the East-West and North-South Waterway Logistics Corridors. There are three components to the project, the first component being selected sections of the east–west waterway logistics corridor. This component supports the improvement of the East-West Waterway Logistics Corridor, through rehabilitating and upgrading infrastructure bottleneck sections of the corridor to meet Vietnam Class II Inland Waterways Standards, for vessels up to 600 tons and 3-tier container ships to navigate full time and vessels up to 1,500 tons to navigate during high tides. The East-West Waterway Logistics Corridor, a total length of about 197 km, covers the inland waterway corridor in the Mekong delta region, connecting Can Tho Port with HCMC Port at the shortest distance. The second component is the selected sections of the north-south waterway logistics corridor. This component supports the improvement of the North-South Waterway Logistics Corridor, through rehabilitating infrastructure bottleneck sections of the corridor, for vessels up to 5,000 tons and 4-tier container ships to navigate. Finally, the third component is the project implementation support."}},"P181564":{"id":"P181564","countryname":["Democratic Socialist Republic of Sri Lan"],"lendinginstr":"Investment Project Financing","project_name":"Sri Lanka: Primary Healthcare System Enhancing Project (PHSEP)","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181564","status":"Active","project_abstract":{"cdata!":"The objective of the Primary Healthcare System Enhancing Project is to improve access and quality of primary health care services across all districts of Sri Lanka. There are five components to the project, the first component being increase availability of comprehensive PHC services at PMCIs and Medical Officer of Health offices. This component includes three subcomponents: ensuring availability of essential inputs at PMCIs and MOH offices, sustaining and strengthening primary health workforce at PMCIs, and expanding the PMCI service package to include additional services. The second component is the strengthen the quality of clinical and person-centered care at PMCIs. This component includes three subcomponents: building capacity for human resources for health, scaling up integrated care platforms, and strengthening governance systems for quality assurance. The third component is the strengthen health promotion, community empowerment and citizen engagement. This component includes two subcomponents: managing health promotion and NCD risk factors and strengthening citizen engagement for preventive and curative care. The fourth component is the project management and monitoring and evaluation. This component includes two subcomponents: project management, monitoring and evaluation, and strengthening project monitoring and management capacity at Ministry Level. Finally, the fifth component is the contingent emergency response component."}},"P502142":{"id":"P502142","countryname":["Republic of Chad"],"lendinginstr":"Investment Project Financing","project_name":"Chad Adaptive and Productive Safety Nets Project","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502142","status":"Active"},"P178481":{"id":"P178481","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Development Policy Lending","project_name":"Bangladesh Second Recovery and Resilience DPC","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178481","status":"Active","project_abstract":{"cdata!":"The objectives of the Second Recovery and Resilience Development Policy Credit Program for Bangladesh are to (i) strengthen fiscal and financial sector policies to sustain growth and (ii) enhance resilience to future shocks, including climate change. The operation is the second in a two-part series. This operation will strengthen the post-pandemic economic recovery while helping Bangladesh prepare for least-developed country (LDC) graduation in 2026, after which the country will gradually have reduced access to concessional financing and preferential export market access. The operation will also strengthen resilience against future shocks, including climate change, by expanding the coverage and efficiency of social protection programs and supporting the transition to a larger share of renewable energy. The R&R DPC series builds on the Jobs DPC series completed in FY2021, which supported the initial COVID-19 response, and complements the concurrent Green and Climate Resilient DPC (GCRD) series. The Program consists of three pillars covering fiscal policies, financial sector reforms, and policies to strengthen resilience to future shocks. The Program draws on extensive advisory and analytical reports to underpin proposed reforms. The selection of prior actions in each reform area reflects measures to support a near-term economic recovery while laying foundations to support a transition to upper middle-income status. Across these three pillars, the Program contributes to the World Bank’s mission of ending extreme poverty and boosting shared prosperity on a livable planet. A waiver of the requirement set out in footnote 9 of BP 8.60: Development Policy Financing has been granted for this programmatic series. Footnote 9 of BP 8.60 provides that a programmatic series is considered to have lapsed 24 months after the Executive Directors approve the previous operation in the series. The waiver extends the period that the IDA Board may consider the programmatic series from March 31, 2024, to June 21, 2024, to avoid the series lapsing."}},"P178673":{"id":"P178673","countryname":["Republic of Senegal"],"lendinginstr":"Investment Project Financing","project_name":"Senegal: Integrated Water Security and Sanitation Project","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"6/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178673","status":"Active","project_abstract":{"cdata!":"The objective of the Integrated Water Security and Sanitation Program Multiphase Programmatic Approach (MPA) Including Phase 1 Credit for the Integrated Water Security and Sanitation Project for Senegal is to improve access to safe water supply and sanitation, and to increase resilience to flood and drought risks. There are four components to the project, the first component being water resources management and protection. This component will promote water security and resilience to climate change-exacerbated droughts and floods through the restoration of depleted or polluted sources and improved management. This component includes three subcomponents: Restoring strategic water resources of Lac de Guiers, Improving Diass and Littoral Nord groundwater recharge and management, and Strengthening WRM governance and developing new water sources in the Niayes area and in the Groundnut Basin. The second component is the Improving sanitation in a circular economy. This component includes three subcomponents: Improving access to urban sanitation, strengthening Irrigation Systems, and Improving access to rural sanitation. The third component is the improving water supply services. This component includes two subcomponents: Improving urban water supply services and improving rural water supply services. Finally, the fourth component is the Sectors reforms, strengthening citizen engagement, and project management. This component includes two subcomponents: sector reforms, and citizen engagement and project management."}},"P181537":{"id":"P181537","countryname":["Republic of Senegal"],"lendinginstr":"Program-for-Results Financing","project_name":"AF for Municipal and Agglomerations Support Program","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181537","status":"Active"},"P500609":{"id":"P500609","countryname":["Republic of Fiji"],"lendinginstr":"Development Policy Lending","project_name":"Fiji Growth and Resilience First Development Policy Financing with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"100,300,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"7/15/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500609","status":"Active","project_abstract":{"cdata!":"The objective of the Growth and Resilience First Development Policy Financing with a Catastrophe Deferred Drawdown Option (Cat DDO) is to support the Government of Fiji in its efforts to build fiscal, climate and disaster resilience, and the foundations for private sector development. The series supports the GoF in its efforts to build fiscal, climate, and disaster resilience, and the foundations for private sector development. Pillar 1 supports(i) enhancing revenue mobilization and building fiscal buffers; (ii) strengthening disaster preparedness; and (iii) securing energy supply and supporting energy transition. Pillar 2 supports (i) facilitating micro, small and medium enterprise (MSME) access to finance; (ii) streamlining the business environment; (iii) promoting the utilization of digital financial services; and (iv) unlocking productive potential of working-age population. The proposed program forms part of the GoF’s first Joint Policy Matrix (JPM), coordinated by the Asian Development Bank (ADB) and the World Bank, comprising of 22 reforms across public financial management (PFM), sustainable economic growth, and climate and community resilience. The JPM is supported by Fiji’s other development partners: Australia, European Union (EU), and New Zealand. These partners are providing technical assistance (TA) to support reform design, implementation, and monitoring."}},"P181522":{"id":"P181522","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Supporting the implementation of SOE Reform in Morocco","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181522","status":"Active","project_abstract":{"cdata!":"Reforms implemented in Morocco since the turn of the century paved the way for 20 years of economic expansion and social progress. Starting in 2009, social and economic progress in Morocco experienced a slowdown, caused by structural limitations in the development model and external shocks, including the COVID-19 pandemic. Challenges include low efficiency in public investment and slow private sector transformation, leading to modest growth compared with countries with similar levels of investment. Morocco attracted foreign direct investment (FDI), but domestic investment remained limited, hindering inclusive growth. The government responded with the New Development Model (NDM), which aims to spur inclusive growth, improve public services, and reduce disparities by 2035. The NDM, which is being operationalized in the 2021–26 agenda of the Government of Morocco (GoM) prioritizes public sector efficiency, private sector promotion, and human capital development. To boost long-term growth and foster a more sustainable and inclusive future, Morocco must enhance the effectiveness of the state’s role as an economic enabler. Doing so involves (i) improving the efficient management of public assets, (ii) enhancing the quality of the enabling environment for private investment and (iii) setting clear and predictable boundaries for the state’s involvement in commercial markets. Better managing the size, performance, and governance frameworks of Morocco’s state-owned enterprise (SOE) sector is at the core of the Kingdom’s transition toward a reduced and more effective role of the state in the economy and more private sector–driven investment, as highlighted in the NDM."}},"P178985":{"id":"P178985","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Bangladesh Resilient Urban and Territorial Development Project","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"10/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178985","status":"Active","project_abstract":{"cdata!":"The objectives of the Resilient Urban and Territorial Development Project for Bangladesh are to: (i) enhance access to climate resilient urban infrastructure and services in selected clusters, and (ii) strengthen urban management capacity in selected urban centers. There are three components to the project, the first component being climate resilient urban services and infrastructure investments. This component includes two subcomponents: climate resilient urban services and infrastructure investments in the selected clusters, and cluster-wide investments for climate resilient basic service improvements.  The second component is the institutional strengthening, technical assistance, project management and operational support. This component includes four subcomponents: institutional strengthening, capacity building, technical assistance, and project management and operational support. Finally, the fourth component is the contingent emergency response."}},"P176615":{"id":"P176615","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Cambodia Water Security Improvement Project","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"145,000,000","boardapprovaldate":"2024-06-21T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176615","status":"Active","project_abstract":{"cdata!":"The objective of the Water Security Improvement Project is to build the foundation for improved water security in Cambodia and increase agricultural productivity in Selected River Basins and to provide an immediate and effective response in case of an Eligible Crisis or Emergency. There are five components to the project, the first component being improve water resources planning and institutions. This component will finance activities that contribute to laying the groundwork for improved water resources management in Cambodia. This involves strengthening the national systems for monitoring, planning, and managing water resources at the basin level. This component includes three subcomponents: strengthening water resources institutions and national policies, water resources monitoring and information, and strengthening of basin governance and planning. The second component is the improve and sustain water service delivery for irrigation and domestic use. This component includes three subcomponents: rehabilitation and upgrading of multi-purpose water resources infrastructure, rehabilitation and upgrading of irrigation infrastructure, and improving institutional, technical, and financial capacity of PDWRAMs and FWUCs to deliver better water services. The third component is the support services to increase climate resilience in irrigated agriculture. This component aims to enhance crop productivity through improved farm-level actions and institutional strengthening at the national and local levels. This component includes two subcomponents: Improved Technology Adoption, and Improved Service Delivery. The fourth component is the project management, coordination, and monitoring and evaluation. This component includes two subcomponents: project management, coordination, monitoring and evaluation under MOWRAM, and project management, coordination, monitoring and evaluation under MAFF. Finally, the fifth component is the contingent emergency response component."}},"P179003":{"id":"P179003","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Sindh Livestock and Aquaculture Sectors Transformation Project","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"135,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179003","status":"Active","project_abstract":{"cdata!":"The objective of the Sindh Livestock and Aquaculture Sectors Transformation Project is to promote climate-smart and competitive small and medium producers in the livestock and aquaculture sectors in Sindh. There are four components to the project, the first component being strengthening the enabling environment for sectoral growth. This component aims to support the development of inclusive, climate-resilient, and sustainable livestock and aquaculture sectors by: (i) improving sector policy and strategic frameworks, as well as evidence-based decision making; and (ii) strengthening the provision of essential knowledge, inputs, and services. This component includes two subcomponents: improvement of the sector’s policies, strategies and evidence-based decision making, and strengthening the delivery of essential knowledge, inputs, and services. The second component is the promotion of climate-smart production, value addition, and inclusive access to markets. this component includes two subcomponents: capacity building and development of horizontal and vertical alliances, and improvement of the market integration of PGs for increased climate-smart production and value addition. The third component is the project management, monitoring, and learning. This component will support the overall management, implementation, and supervision of project interventions, capacity building, as well as monitoring, evaluation, communication, dissemination, and continuous learning throughout the life of the project. Finally, the fourth component is the contingent emergency response."}},"P504691":{"id":"P504691","countryname":["Union of the Comoros"],"lendinginstr":"Investment Project Financing","project_name":"Comoros National Water Resilience Project","p2a_updated_date":"2024-06-21 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504691","status":"Active","project_abstract":{"cdata!":"The objective of the National Water Resilience Project for Comoros is to improve access to and maintenance for basic water supply services in Grand Moroni and strengthen sector governance. There are four components to the project, the first component being resilient water supply infrastructure for Grand Moroni. This component includes three subcomponents: securing water supply production, increasing water storage, and water supply distribution and resilience building. The second component is the sector governance strengthening, capacity building and sector strategies. This component includes two subcomponents: sector governance reforms and capacity building to key sector institutions, and strategic sector studies. The third component is the project management. This component will fund the recruitment of consultants for the Project Implementation Unit (PIU) and the project management costs. Finally, the fourth component is the Contingent Emergency Response Component (CERC)."}},"P180749":{"id":"P180749","countryname":["Kingdom of Cambodia"],"lendinginstr":"Development Policy Lending","project_name":"Second Cambodia Growth and Resilience Development Policy Financing","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"275,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180749","status":"Active","project_abstract":{"cdata!":"The development objective of Second Cambodia Growth and Resilience Development Policy Financing is to: i) boost growth through a more competitive environment for the private sector; ii) strengthen fiscal resilience; and iii) enhance social and environmental resilience. This operation is the second in a programmatic series of two operations. It is structured around three pillars. The first pillar helps create an environment in which firms can enter, exit, and compete fairly. The second pillar helps enhance fiscal resilience over the medium term by controlling spending on public pensions, enhancing efficiency and mitigating the associated fiscal risks of capital expenditures and PPPs, and strengthening the RGC’s capacity to raise financing through sovereign bond issuance. The third pillar improves social and environmental resilience by institutionalizing shock-responsive social protection, improving disaster risk management, expanding carbon markets, improving energy efficiency and improving payments delivery. With its reorientation to medium-term growth and reform, the proposed operation also supports the WBG’s extensive and deep engagement in Cambodia as outlined in the World Bank Group (WBG)’s Country Partnership Framework (CPF) for 2019–2024. This program is aligned with the goals of the Paris Agreement and Cambodia’s pathway towards low GHG emissions and climate-resilient development."}},"P181679":{"id":"P181679","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Morocco Public Sector Performance (ENNAJAA) Program Additional Financing","p2a_updated_date":"2024-06-21 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181679","status":"Active"},"P181160":{"id":"P181160","countryname":["Republic of Angola"],"lendinginstr":"Program-for-Results Financing","project_name":"Angola Secondary Cities Support Program","p2a_updated_date":"2024-06-24 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181160","status":"Active","project_abstract":{"cdata!":"The objective of the Secondary Cities Support Program is to strengthen institutional capacity for climate-informed urban growth management and urban infrastructure delivery and increase access to affordable housing solutions in select urban areas in Angola. The Program contributes to the World Bank Group’s mission to end extreme poverty and boost shared prosperity on a livable planet, the Evolution priorities, regional areas of focus, and the strategic directions of the Climate Change Action Plan 2021-2025. It supports a more livable planet by fostering the development of more low carbon and climate-resilient cities and homes and extending access to life essentials such as clean water and electricity. It contributes to relieving poverty and boosting shared prosperity by fostering more compact and connected cities that enhance economic opportunities through agglomeration benefits and access to jobs, expanding access to decent affordable housing for lower-income urban residents, improving fiscal sustainability through the more strategic use of government resources in the urban and housing sectors, and mobilizing private investment in housing. The Program is aligned with the World Bank Group’s 2018 Systematic Country Diagnostic (SCD) for the Republic of Angola and the forthcoming Country Partnership Framework (CPF) for 2025-2030. The Program addresses the second, third and fourth binding constraints to poverty reduction and shared prosperity identified in the latest SCD: (i) a weak private sector unable to sustain growth momentum; (ii) exclusion of the poor from growth benefits and lack of human capital; and (iii) weak governance. The Program will address these by improving the enabling environment for private sector housing investments, increasing the government’s delivery of basic services and housing solutions for low income and vulnerable households, and strengthening capacity for urban governance. It will also strengthen local government capacity to deliver upon decentralized competencies in planning and service delivery."}},"P181558":{"id":"P181558","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Program-for-Results Financing","project_name":"Crisis-Resilient Social Protection - Additional Financing","p2a_updated_date":"2024-06-21 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-06-20T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181558","status":"Active"},"P502128":{"id":"P502128","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"CAR Accelerating Results in Education","p2a_updated_date":"2024-06-19 00:00:00.0","totalcommamt":"65,000,000","boardapprovaldate":"2024-06-18T00:00:00Z","closingdate":"10/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502128","status":"Active","project_abstract":{"cdata!":"The  objective of the Accelerating Results in Education Project for Central African Republic is to improve access to quality basic education and strengthen capacity for sector management. There are four components to the project, the first component being Increase access to improved learning environments. This component includes four subcomponents: targeted schooling infrastructure, targeted schooling infrastructure, supporting learning opportunities for out-of-school children, and school grant and girls’ education initiative. The second component is the improve teaching quality. This component includes three subcomponents: support teachers’ in-service training in basic education, strengthen preservice teacher training, and increase qualified primary teachers in the system. The third component is the strengthen data system and sector management. This component includes three subcomponents: learning assessments, strengthen education planning and management, and project management and capacity building. Finally, the fourth component is the Contingent Emergency Response Component (CERC)."}},"P181479":{"id":"P181479","countryname":["Republic of Moldova"],"lendinginstr":"Development Policy Lending","project_name":"Moldova Supporting Growth and Resilience DPO","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-06-14T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181479","status":"Active","project_abstract":{"cdata!":"The development objective of Supporting Growth and Resilience Development Policy Operation Project for Moldova is to: (i) strengthen resilience of refugees and households; (ii) foster sustainable growth through enhanced competition and private sector-led growth; and (iii) support climate resilience. The standalone Development Policy Operation (DPO) supports the Government of Moldova (GoM)’s efforts to assist refugees and households in the face of the fallout from Russia’s invasion of Ukraine while keeping momentum on the long-term agenda of economic convergence to the European Union (EU) and climate resilience. This operation supports the government’s reform agenda and contributes to both short-term and long-term objectives. Measures in Pillar 1 – corresponding to European Moldova 2030 objectives for long-term human and social capital – aim to strengthen the social assistance programs and remove constraints on refugees and women’s participation in the labor market. Pillar 2 reforms promote private sector-led growth by leveling the playing field between SOEs and private enterprises, and by strengthening financial sector stability.  Pillar 3 prioritizes climate resilience, in line with the objectives of European Moldova 2030 for a healthy environment. It focuses on enhancing energy efficiency, promoting renewable energy, and introducing the Law on Climate Actions for binding climate commitments, the establishment of a carbon pricing mechanism, and the National Adaptation Plan. Additionally, it promotes sustainable forest management for carbon sequestration and agricultural land resilience, contributing to climate change mitigation and adaptation efforts."}},"P180770":{"id":"P180770","countryname":["Plurinational State of Bolivia"],"lendinginstr":"Investment Project Financing","project_name":"Road Sector Climate Resilience Program SOP-1","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"118,500,000","boardapprovaldate":"2024-06-14T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180770","status":"Active","project_abstract":{"cdata!":"The development objective of the Road Sector Climate Resilience Program Series of Projects (SOP-1) for Bolivia is to enhance climate risk management in Bolivia’s road sector and improve climate resilience and road safety of specific road sections. There are three components to the project, the first component being institutional development and capacity building. This component aims to lay the groundwork for the successful design and implementation of the future projects under the RSCRP. While the Program seeks to build capacities for all entities involved in Bolivia’s road network, the first Project will primarily focus on creating a general strategy and a blueprint as to where these capacities could reside and providing training to ABC, as the implementing agency for the first interventions. Focus will be placed in supporting the correct implementation of the recently completed manual for the application of hydroclimatic model results for the RVF under the RSCDP. The second component is the bridge and road upgrading for climate resilience and road safety. This component will support the implementation (including civil works, construction supervision services, contingencies, road safety audits at several stages of design and construction, technical audits, and land and resettlement expenditures) of the three interventions identified by the Government as a priority to bring in resilience to climate disasters and avoid potential incidents in key parts of the RVF. Finally, the third component is the project management."}},"P181620":{"id":"P181620","countryname":["Republic of Malawi"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Malawi Governance to Enable Service Delivery","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"35,000,000","boardapprovaldate":"2024-06-14T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181620","status":"Active"},"P181491":{"id":"P181491","countryname":["Republic of Cameroon"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Cameroon Transport Sector Development Project","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-14T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181491","status":"Active"},"P176594":{"id":"P176594","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Getting Results: Access and Delivery of Quality Education Services in Punjab Project","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-06-14T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176594","status":"Active","project_abstract":{"cdata!":"The objective of the Getting Results: Access and Delivery of Quality Education Services in Punjab Project for Pakistan is to increase girls' and boys' participation rates in pre-primary and primary grades and enhance reading proficiency in primary grades. There are four components to the project, the first component being getting results agenda. This component consists of supporting Punjab’s education reform agenda on interventions known to benefit girls and boys and contributes to all the outcomes in the project. The second component is the building climate-smart classrooms for a sustainable expansion of the school system. Constructing approximately fifty-four hundred (5,400) additional classrooms (grades ECCE to 5), including: (i) prioritizing reconstruction of classrooms and WASH facilities in schools that have been damaged during the most recent floods; (ii) prioritizing girls’ schools as well as schools that can enroll a large share of girls; (iii) provision of furniture that can be flexibly arranged, accessible wheelchair ramps and handrails; (iv) low-cost climate-smart features (such as, heat insulation, use of natural ventilation, use of natural lighting, raised plinths, reflective roofs); (v) climate change mitigation for schools, such as water conservation fittings, rainwater harvesting in high-precipitation areas, and tree planting/afforestation on school grounds; and (vi) using an elevated school design for sites prone to flooding; as well as developing a School Infrastructure Strategy. The third component is the technical assistance, evaluation and project implementation. Providing technical assistance to implement the Project, including Project implementation, monitoring and communication, as follows: (i) technical support to departments implementing the PBCs; (ii) research studies and technical assistance to support third party verification of the PBCs; (iii) project staffing to support implementation; (iv) supervision and monitoring of classroom construction, including compliance with the environmental and social requirements; and (v) strengthening the GBV reporting and response systems within schools to improve standard operating procedures and referral protocols. Finally, the fourth component is the contingent emergency response component."}},"P505187":{"id":"P505187","countryname":["Republic of Malawi"],"lendinginstr":"Investment Project Financing","project_name":"Malawi Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-13T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505187","status":"Active","project_abstract":{"cdata!":"The development objective of Health Emergency Preparedness Response and Resilience Program Using the Multiphase Programmatic Approach Project for Malawi is to strengthen health system resilience and multisectoral preparedness and response to health emergencies in Eastern and Southern Africa. This project has four components. 1) The first component, Strengthening the Preparedness and Resilience of the Health System to Manage Health Emergency (HEs), has the following sub-components: (i) Enhancing Multisectoral Planning, Financing, and Governance for Improved Resilience to HEs; (ii) Strengthening Health Workforce Development; (iii) Improving Access to Quality Health Commodities; and (iv) Enhancing Information Systems for HEs and Digitalization of the Health Sector. 2) The second component, Improving Early Detection of and Response to HEs through a Multisectoral Approach, has the following sub-components: (i) Collaborative Multisectoral Surveillance and Laboratory Diagnostic; (ii) Emergency Management, Coordination, and Essential Service Continuity; and (iii) Risk Communication and Community Engagement (RCCE), Empowerment, and Social Protection during HEs. 3) The third component, Project Management and Monitoring and Evaluation, has the following sub-components: (i) Enhancing Project Monitoring and Evaluation (M&E); (ii) Providing Tailored Technical Assistance and Facilitating Delivery of a Learning Agenda; and (iii) Strengthening Project Management through Support of the Implementing Institutions and Multisectoral Collaboration. 4) The fourth component, Contingent Emergency Response (CERC), will facilitate access to rapid financing by allowing for the reallocation of uncommitted project funds in the event of a natural disaster in a country, either by a formal declaration of a national emergency or upon a formal request from the government."}},"P501661":{"id":"P501661","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Development Policy Lending","project_name":"Nigeria Reforms for Economic Stabilization to Enable Transformation (RESET) DPF","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"1,500,000,000","boardapprovaldate":"2024-06-13T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501661","status":"Active","project_abstract":{"cdata!":"The development objective of the Reforms for Economic Stabilization to Enable Transformation (RESET) Development Policy Financing for Nigeria is to strengthen Nigeria’s economic policy framework by creating fiscal space and protecting the poor and economically insecure. This operation is structured around two pillars on building fiscal space and protecting the poor and economically insecure households. Five prior actions (PAs) and three tranche release conditions (TRCs) constitute the reforms which significantly advance the government’s current economic stabilization and recovery priorities. The tranching of the operation reflects the importance of near-term follow-up actions to further embed and implement the most critical reforms to safeguard net oil revenues, build non-oil revenues, and support the poor and economically at risk. At the same time, the approach of a standalone operation enables the World Bank to respond to the urgent need for reform and budget support, whilst retaining the flexibility to support specific future policy and institutional reform progress when the time comes."}},"P505188":{"id":"P505188","countryname":["Republic of Zambia"],"lendinginstr":"Investment Project Financing","project_name":"Zambia Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-13T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P505188","status":"Active","project_abstract":{"cdata!":"The development objective of Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach for Zambia is to strengthen health system resilience and multisectoral preparedness and response to health emergencies in Eastern and Southern Africa. This project has four components. 1)The first component, Strengthening the Preparedness and Resilience of the Health System to Manage Health Emergency (HEs), has the following sub-components: (i) Develop health workforce through training, regulatory and management mechanisms; and (ii) Operationalize information systems for HEs and digitalize the health sector. 2) The second component, Improving the Detection of and Response to HEs through a Multisectoral Approach, has the following sub-components: (i) Strengthen emergency management structures and processes and patient-centered health care provision; (ii) Risk communication and community engagement; and (iii) Climate change adaptive emergency preparedness and response. 3) The third sub-component, Project Management, will finance strengthening the capacity for monitoring and evaluation (M&E) and project management. 4) The fourth component, Contingent Emergency Response, will facilitate access to rapid financing by allowing for the reallocation of uncommitted project funds in the event of a natural disaster in a country, either by a formal declaration of a national emergency or upon a formal request from the government."}},"P177308":{"id":"P177308","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Program-for-Results Financing","project_name":"NG Accelerating Resource Mobilization Reforms PforR","p2a_updated_date":"2024-06-17 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2024-06-13T00:00:00Z","closingdate":"11/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177308","status":"Active","project_abstract":{"cdata!":"The development objective of the Accelerating Resource Mobilization Reforms (ARMOR) Program for Results for Nigeria is to raise non-oil revenues and safeguard oil and gas revenues. The government’s ARMOR program, which was approved by the Federal Executive Council (FEC) in June 2022 is a key component of the National Development Plan 2021-2025 and has the objective to boost tax revenues, develop the tax and customs administrations, and improve governance and transparency in the oil and gas sector, to enhance the fiscal space for social protection spending. The ARMOR program contains revenue policy measures such as, raising pro-health taxes on tobacco, and alcohol, introducing taxes on online betting and gambling, a new excise on telecommunication services, green taxes in the form of excises on vehicles and single-use plastics, as well as the implementation of an electronic money transfer levy. The program also aims to reform tax expenditures, and lower revenue foregone through tax exemptions and incentive programs. The program also includes tax administrative improvements and the modernization of Federal Inland Revenue Service (FIRS) and Nigeria Customs Service (NCS), including through greater use of automated and simple procedures allowing businesses who voluntarily comply to do so easily. The program supports trade facilitation by introducing more efficient customs processing and lowering the administrative costs and time of collecting duties and taxes on imported goods and doing so in a fair, transparent, and predictable manner. Finally, the program aims to safeguard oil and gas revenues transferred to the federal budget by increasing transparency and improving the governance of the oil and gas sector and removing fuel subsidies."}},"P181468":{"id":"P181468","countryname":["Republic of Yemen"],"lendinginstr":"Investment Project Financing","project_name":"Emergency Social Protection Enhancement and COVID-19 Response Project - Third Additional Financing","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-06-13T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181468","status":"Active"},"P178032":{"id":"P178032","countryname":["Somali Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Somali Sustainable Fisheries Development Project - Badmaal","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-06-12T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178032","status":"Active","project_abstract":{"cdata!":"The development objective of the Sustainable Fisheries Development Badmaal Project for Somali is to improve the capacity of targeted communities and authorities to benefit from and effectively manage selected fisheries. The project comprises of three components. The first component, increasing the capacity of dependent communities to benefit from sustainable marine fisheries aims to establish or improve small-scale fisheries sustainable infrastructure that is climate resilient, and financially viable and value chains with primary beneficiaries being fishers, fish workers and their communities including cooperatives and micro-small-medium enterprises (MSMEs). It consists of following sub-components: (i) climate-resilient fisheries infrastructure; and (ii) improving fishing, handling, processing, and marketing techniques to enhance quality and value-addition. The second component, strengthening marine fisheries governance and management will set the foundation for long-term climate resilient Somali fisheries that are managed for sustainability by investing in fisheries governance as laid out in the 2023 Fisheries Law. It consists of following sub-components: (i) laying a foundation for effective, transparent, and equitable fisheries resource governance and management; (ii) developing a comprehensive Monitoring Control and Surveillance (MCS) system to fight illegal unregulated and reported (IUU) fishing in Somali waters; (iii) fisheries statistics and stock assessments; and (iv) strategic studies on fisheries development and blue economy. The third component, project management monitoring and evaluation will ensure effective implementation of project activities and fiduciary management and effective monitoring and evaluation, and conformity with the World Bank environmental and social framework (ESF)."}},"P181577":{"id":"P181577","countryname":["Republic of Vanuatu"],"lendinginstr":"Investment Project Financing","project_name":"Vanuatu Climate Resilient Transport Project Additional Financing II","p2a_updated_date":"2024-06-13 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-06-12T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181577","status":"Active"},"P177478":{"id":"P177478","countryname":["Republic of Liberia"],"lendinginstr":"Investment Project Financing","project_name":"Governance Reform and Accountability Transformation (GREAT) Project","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-06-12T00:00:00Z","closingdate":"11/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177478","status":"Active","project_abstract":{"cdata!":"The objective of the Governance Reform and Accountability Transformation (GREAT) Project for Liberia is to enhance access to selected digitally provided public services, raise tax revenues, and improve the openness of accountability institutions. The PDO will be achieved by strengthening the use of country systems and sustainably building the capacity of civil servants to implement programs of reform. There are four components to the project, the first component being enhance access to selected public services. This component aims to support enhanced access to selected public services through multichannel service delivery, with a focus on the digitalization of public services. This component includes three subcomponents: support the digitalization of selected Ministry services and enhance citizen access through the eLiberia Portal, strengthen the capacity of CSCs to provide citizen-support to access services, including access to online services, and support the rollout of National ID system and strengthen the capacity of NIR to improve access to online services. The second component is the raise tax revenues. This component includes three subcomponents: support capacity building for the implementation of the VAT, strengthen interoperability and reach of tax systems, and support scale-up of the ongoing property tax pilot. The third component is to enhance the capacity and openness of selected accountability institutions. This component includes four subcomponents: build institutional capacity for a transparent follow-up action on audit report findings, rollout the e-GP system and enhanced transparency of public procurement transactions, launch the digitalized LACC asset declaration system and anti-corruption dashboard with public access to data, and strengthen IFMIS effectiveness and enhance compliance in budget execution. Finally, the fourth component is the project implementation, change management, and capacity building. this component includes one subcomponent: project implementation and change management."}},"P173258":{"id":"P173258","countryname":["Republic of Ghana"],"lendinginstr":"Program-for-Results Financing","project_name":"Ghana Energy Sector Recovery Program","p2a_updated_date":"2024-06-14 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-06-12T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P173258","status":"Active","project_abstract":{"cdata!":"The development objective of Energy Sector Recovery Program (ESRP) Project for Ghana is to improve the financial viability of the electricity distribution sector in Ghana and to increase access to clean cooking solutions. The program for results (PforR) program is a subset of the government’s ESRP program and Phase 1 of the National LPG Promotion Program (NLPGPP), to reduce the power sector’s revenue gap. The PforR Program’s scope is defined by the subset of activities of the ESRP aimed at (i) reducing costs of electricity purchases through improved economic dispatch, (ii) increasing revenue collection of the distribution utilities through supporting measures for reducing electricity losses; and (iii) improving the financial management system of Electricity Company of Ghana (ECG). Specifically, this includes initiatives for providing support to implementation of performance improvement programs (PIPs) of the distribution utilities and for improving functions of Ghana Grid Company, Ltd. (GRIDCo) (both as a system operator and as a transmission asset owner). The PforR program shall have the following result areas: (i) Reduced power system costs through economic dispatch; (ii) Improved operational performance of ECG; (iii)  Improved financial management systems and processes at ECG; and (iv) Increased access to clean cooking solutions."}},"P180505":{"id":"P180505","countryname":["Republic of Benin"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Benin Agricultural Competitiveness and Export Diversification Project","p2a_updated_date":"2024-06-12 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-06-11T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180505","status":"Active"},"P181423":{"id":"P181423","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for Dasu Hydropower Stage I Project","p2a_updated_date":"2024-06-11 00:00:00.0","totalcommamt":"1,000,000,000","boardapprovaldate":"2024-06-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181423","status":"Active"},"P179117":{"id":"P179117","countryname":["Republic of Chile"],"lendinginstr":"Program-for-Results Financing","project_name":"Chile's Water Transition","p2a_updated_date":"2024-06-12 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-06-10T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179117","status":"Active","project_abstract":{"cdata!":"The development objective of the Water Transition Program for Chile is to strengthen the Borrower’s capacity for water resource management and water-related services. The Bank operation (PforR or Program) will support key activities of the Government of Chile (GoC’s) program. While addressing climate change-exacerbated droughts, floods, and water scarcity, the PforR will focus on: (i) strengthening institutional capacities for the integrated management of water resources, including the implementation of a participatory water governance approach at basin level; (ii) improving safely managed drinking water and sanitation services in rural areas; and (iii) improving climate resilience through the development of integrated green and gray solutions for irrigation and flooding at basin level."}},"P502125":{"id":"P502125","countryname":["Kingdom of Lesotho"],"lendinginstr":"Investment Project Financing","project_name":"Lesotho Integrated Transport, Trade and Logistics Project","p2a_updated_date":"2024-06-08 00:00:00.0","totalcommamt":"22,700,000","boardapprovaldate":"2024-06-07T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502125","status":"Active","project_abstract":{"cdata!":"The objective of the Integrated Transport, Trade and Logistics Project is to improve climate resilient regional connectivity on the Katse to ThabaTseka road corridor and reduce the costs of trade at three of Lesotho's commercial borders with South Africa. There are three components to the project, the first component being road corridor infrastructure development. This component has two sub-components: upgrading of the Katse to Thaba-Tseka road corridor to climate resilient paved standard (US55 million dollars), and sub-spot improvements along the A1 economic corridor (US5 million dollars). The second component is the regional trade, integration, and logistics services. This component has three subcomponents: Smart One-Stop Border Post facilities at the Maseru Bridge and Maputsoe-Ficksburg border crossings, and improvement of Qacha’s Nek border, Inspection and laboratory testing facilities, and Climate controlled community-level horticulture packing and storage facilities (cold chain). Finally, the third component is the technical assistance, capacity building, and project management. This component will support implementation of the project by the Roads Directorate (RD) implementation unit for component 1, and by the CAFI Project Management Unit (PMU) for component 2."}},"P500557":{"id":"P500557","countryname":["Dominican Republic"],"lendinginstr":"Development Policy Lending","project_name":"Sustainable Development DPL","p2a_updated_date":"2024-06-08 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-07T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500557","status":"Active","project_abstract":{"cdata!":"The Development Policy Loan (DPL), in the amount of US 400 million dollars, is to support the Government of the Dominican Republic (GoDR) to reduce pollution and strengthen institutional and financing capacity for natural resource protection. Specific policy reforms under the first pillar Reduce Pollution include those that address the rising challenge of marine and riverine pollution, and contamination and greenhouse gas (GHG) emissions from waste of electrical and electronic equipment (WEEE). Policy reforms under the second pillar Strengthen Institutional and Financing Capacity for Natural Resource Protection include those that improve the ability of the government to respond to the sargassum seaweed crisis, better manage dredging and earth removal, and provide a robust framework for sustainable development bonds. The reform program will help protect coastal ecosystems and inland water bodies, reduce emissions, and increase financing capacity to support environmental conservation, climate resilience and a low carbon transition, all of which will help advance the country’s ability to meet its Nationally Determined Contributions (NDC) and long-term climate goals. The operation supports the Dominican Republic’s (DR) sustainable development over the long term by fostering crucial policy and institutional reforms that enhance the country’s management of natural resources and ability to respond to climate change."}},"P181650":{"id":"P181650","countryname":["Republic of Madagascar"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing to the Integrated Urban Development and Resilience Project for Greater Antananarivo","p2a_updated_date":"2024-06-08 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2024-06-07T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181650","status":"Active"},"P177094":{"id":"P177094","countryname":["Burkina Faso"],"lendinginstr":"Investment Project Financing","project_name":"Burkina Faso Water Security Project (BFWSP)","p2a_updated_date":"2024-06-08 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-06-07T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177094","status":"Active","project_abstract":{"cdata!":"The development objective of the Water Security Project for Burkina Faso is to improve the safety of dams, access to associated irrigation and watershed services, and climate resilience for beneficiaries. The project comprises of six components. The first component, security and climate resilience of water storage infrastructures will support the securitization of priority dam infrastructure to ensure continued access to and valorization of the associated water resources, building flood, and drought resilience. It consists of following sub-components: (i) strengthening climate resilience through rehabilitation of priority dams; and (ii) rapid response for securing failing dams and enhanced climate resilience. The second component, development of climate-smart hydro-agricultural infrastructures will support the improvement and expansion of water-related services and economic benefits from dams in drought-prone areas, especially from dams rehabilitated under Component 1. It consists of following sub-components: (i) development of climate-smart irrigated perimeters; and (ii) support to agricultural and fish production and to the management of irrigation schemes. The third component, integrated watershed protection and management will be implemented in the watersheds of the reservoirs to be rehabilitated by the project, to protect them from sedimentation, progressive filling, and loss of storage capacity, leading to increased water availability during droughts and reduced climate-exacerbated flood vulnerability. It consists of following sub-components: (i) participatory planning for integrated watershed management; and (ii) integrated watershed management. The fourth component, climate-smart sector reforms and operationalization of the national strategy for dams will support legal and institutional strengthening and capacity building to enhance water security in Burkina Faso. It consists of following sub-components: (i) supporting climate-smart sector reforms and strengthening the institutional framework; and (ii) capacity building. The fifth component, project management, environmental and social measures, and consulting services will support additional studies and consultancy services, implementation of project safeguard requirements, and project management. The sixth component, contingent emergency response component (CERC) will provide immediate response to an eligible crisis or emergency, as needed."}},"P181398":{"id":"P181398","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to the Food Systems Resilience Program for Eastern and Southern Africa – Phase 1 under the Multi-Phase Program","p2a_updated_date":"2024-06-08 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2024-06-06T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181398","status":"Active"},"P503393":{"id":"P503393","countryname":["Co-operative Republic of Guyana"],"lendinginstr":"Investment Project Financing","project_name":"Guyana Coastal Adaptation and Resilience Project","p2a_updated_date":"2024-06-06 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-05T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503393","status":"Active","project_abstract":{"cdata!":"The development objective of Coastal Adaptation and Resilience Project is to enhance climate adaptation and reduce flood risk in urban and rural areas in the coastal plain of Guyana. This project has three components. 1) The first component, Improving drainage infrastructure, has the following sub-components: (i)Repairs to existing sluices; (ii) Rehabilitation or replacement of drainage infrastructure and channel maintenance/rehabilitation; and (iii) Design and Construction Supervision. Consulting services for condition assessments. 2) The second component, Improving flood management and drainage operations, will finance non-structural interventions to strengthen the capacity of the MoA to manage and efficiently operate the drainage system, and thus reduce flood risk and support climate adaptation. 3) The third component, Project management, will finance specialist consulting services, goods, and equipment for the Project Implementation Unit (PIU) to effectively manage key functions, including planning, coordination, financial management (FM), procurement, and E&S throughout the implementation period."}},"P500529":{"id":"P500529","countryname":["Republic of Sierra Leone"],"lendinginstr":"Investment Project Financing","project_name":"SPF: Innovative solutions for land dispute resolution in Sierra Leone","p2a_updated_date":"2024-06-05 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-06-04T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500529","status":"Active"},"P503988":{"id":"P503988","countryname":["United Mexican States"],"lendinginstr":"Development Policy Lending","project_name":"Mexico Sustainable and Inclusive Finance Development Policy Loan","p2a_updated_date":"2024-06-04 00:00:00.0","totalcommamt":"1,000,000,000","boardapprovaldate":"2024-06-03T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503988","status":"Active","project_abstract":{"cdata!":"The Sustainable and Inclusive Finance Development Policy Loan (DPL) for US1 billion dollars supports key components of Mexico’s Sustainable Finance Mobilization Strategy (Estrategia de Movilización de Financiamiento Sostenible, EMFS) and the National Financial Inclusion Policy (Política Nacional de Inclusion Financiera, PNIF) to improve the policy framework for sustainable finance and access to finance for micro, small, and medium enterprises (MSMEs). As an upper-middle-income country and a member of the Organization for Economic Co-operation and Development (OECD), Mexico has made significant strides in economic sophistication, export expansion, and foreign direct investment (FDI) growth in recent decades. Nevertheless, the country´s potential to evolve into a more sustainable and productive economy and to alleviate poverty and income disparities is constrained by limited credit availability and underdeveloped private securities markets. Moreover, the execution of Mexico's revised Nationally Determined Contributions (NDCs) highlights the need for greater volumes of private sector capital to fund Mexico's transition to a more sustainable economy. This DPL establishes institutional building blocks for mobilizing substantial private sector finance for sustainable and inclusive objectives and is consistent with Graduation Discussion Commitments. It reflects broad policy consensus among policy makers, the financial sector, and the private sector regarding the importance of developing a framework conducive to leveraging private sector opportunities into sustainable finance. In accordance with the World Bank’s Graduation Discussion Income commitments, the proposed operation supports the creation of institutions and policy frameworks for sustainable finance and economic inclusion in areas such as disclosure and reporting standards, taxonomies, sustainable and inclusive capital markets regulation, greening National Development Finance Institutions and MSMEs access to finance. The operation is a trailblazer within the WBG for its support of comprehensive sustainable finance frameworks, which has important significant global demonstration effects, especially for emerging markets. It also contributes to global public goods by increasing green finance, thereby helping Mexico’s transition to a lower-carbon emission economy. The operation complements the WBG’s ongoing and pipeline program in Mexico and builds on the WBG’s long-standing policy dialogue with Mexico in these areas with substantial WBG technical support. Also, Mexico’s commitment for fostering gender equality with sustainable and inclusive finance aligns with the strategic objectives of economic participation and leadership in the new WBG’s Gender Strategy."}},"P172388":{"id":"P172388","countryname":["People's Republic of China"],"lendinginstr":"Program-for-Results Financing","project_name":"Low Carbon Transition of Urban Mobility in Yichang (Hubei)","p2a_updated_date":"2024-06-02 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-05-31T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P172388","status":"Active","project_abstract":{"cdata!":"China is both a major contributor to rising global greenhouse gas emissions causing climate change and negatively affected by its adverse impacts. As the world’s largest emitter, accounting for 31 percent of CO2 (2021), China’s contribution to reducing global climate risks and achieving the Objectives of the Paris Agreement is indispensable. China has made ambitious commitments to peak carbon emissions by 2030 and achieve carbon neutrality by 2060. Towards these long-term goals, the Government of China (GoC) has set up a steering group and is formulating the 1 plus N policy framework, in which the 1 refers to one national-level policy framework and the N to specific solutions to achieve peak carbon emissions by 2030. The 1 national policy is stipulated in the Working Guidance for Carbon Dioxide Peaking and Carbon Neutrality in Full and Faithful Implementation of the New Development Philosophy issued in October 2021. The N started with the Action Plan for Carbon Dioxide Peaking Before 2030 issued in October 2021 and will be followed by upcoming plans by sectoral ministries and sub-national governments on their respective sectors and jurisdictions, to translate the national targets into disaggregated local benchmarks and specific actions to achieve them. The policy framework focuses on the ten areas, one of which is building a green and low-carbon transportation system. Fulfilling the climate commitments towards carbon-neutral economy, while sustaining economic growth, is the primary mid-century goal for China. In the context of a growing middle class, rising global trade, and continuing urbanization and motorization, balancing these objectives poses serious challenges and will require a series of policy reforms, significant investments including in green infrastructure, technology innovations, and institutional strengthening to support coordinated implementation. To ensure inclusive growth, it is also essential to identify and mitigate risks associated with the transition to a carbon-neutral economy, which can have disproportionate, negative impacts on certain geographical locations, sectors, and income groups. This is a critical time for each sector and sub-national entities to make informed decisions that will define the long-term pathways to fulfill the commitments and sustain growth."}},"P181533":{"id":"P181533","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Regional Sahel Pastoralism Support Project II Burkina Faso","p2a_updated_date":"2024-06-02 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-05-31T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181533","status":"Active"},"P181685":{"id":"P181685","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Cash for Jobs Additional Financing","p2a_updated_date":"2024-05-31 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-05-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181685","status":"Active"},"P181347":{"id":"P181347","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing  for Cambodia General Education Improvement Project","p2a_updated_date":"2024-05-31 00:00:00.0","totalcommamt":"79,500,000","boardapprovaldate":"2024-05-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181347","status":"Active"},"P500912":{"id":"P500912","countryname":["Republic of Kenya"],"lendinginstr":"Development Policy Lending","project_name":"First Kenya Fiscal Sustainability and Resilient Growth","p2a_updated_date":"2024-05-31 00:00:00.0","totalcommamt":"900,000,000","boardapprovaldate":"2024-05-30T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500912","status":"Active","project_abstract":{"cdata!":"The Development Policy Operation (DPO) is the first of a series of three operations that support Kenya’s policy and institutional reforms to (i) promote efficiency, transparency, and equity of public finance; (ii) foster more competitive and inclusive product and labor markets; and (iii) strengthen climate action. This DPO of US$1.2 billion, financed by IBRD and IDA (including the Window for Refugees and Host Communities), supports the ambitious reform agenda of the Government of Kenya (GoK) to drive transformational change in the country. It is tailored to Kenya’s challenging macroeconomic context, framed by tight global and domestic credit conditions, fiscal pressures, shocks from climate change, and persistent poverty and inequality. The DPO is designed to address the country’s short-term challenges by strengthening fiscal, economic, and environmental institutions that will simultaneously lay the foundations for a more prosperous, green, and inclusive future. This DPO also supports Kenya in a difficult economic climate as it hosts a significant population of refugees and asylum seekers while undertaking a process of refugee policy reforms. There are over 550,000 refugees and almost 200,000 asylum seekers in the country (320,572 refugees and asylum seekers in Dadaab Camp and 271,995 in Kakuma Camp and Kalobeyei Settlement). The camps and settlement are managed by the GoK’s Department of Refugee Services (DRS), with support from the United Nations High Commissioner for Refugees (UNHCR) and other humanitarian partners. The inflow of refugees has significantly changed the spatial and social dynamics of host counties. The GoK has demonstrated its commitment to the Global Compact on Refugees by enacting the Refugees Act of 2021, Cap 173 of Laws of Kenya, which grants refugees more rights and protections, and by drafting the Shirika Plan in 2024, which seeks to create more integrated settlements where refugees can live, access social services, and work alongside Kenyans."}},"P179336":{"id":"P179336","countryname":["Republic of Armenia"],"lendinginstr":"Program-for-Results Financing","project_name":"Armenia Enabling the Energy Transition Program","p2a_updated_date":"2024-06-02 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-05-30T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179336","status":"Active","project_abstract":{"cdata!":"Armenia is an upper-middle-income country with a per-capita gross domestic product (GDP) of US6,661 dollars in 2022 that has experienced high yet volatile growth over the past two decades. The government’s vision for the development of the energy sector aims at enhancing Armenia’s energy security while reducing the country’s GHG emissions. In 2021, the Government of Armenia (GoA) issued the “Republic of Armenia Energy Sector Development Strategy to 2040” (ESDS 2040), which lays out the vision for the development of the Armenia energy sector until 2040 and is built around five key strategic priorities: (i) implementing power transmission infrastructure investments (including the interconnections with Georgia and Iran), (ii) promoting a gradual liberalization of the electricity market, (iii) extending the lifetime of the Armenia Nuclear Power Plant (ANPP), (iv) tapping into the RE potential, and (v) scaling up energy efficiency (EE) across all sectors. To improve the security and reliability of the power supply and enable the integration of RE, Armenia needs to continue investing in modernizing the power transmission network and reduce its reliance on public funding and guarantees to finance investment in power sector state-owned enterprises (SOEs). As highlighted by key performance indicators, the quality of the power supply in Armenia is deteriorating and falling behind its ECA peers, indicating the urgent need to continue investing in and modernizing the network, including electrical substations and grid digitalization. According to the ESDS 2040, total projected investment needs in the power sector are estimated at US$2.1 billion over the next 15 years. While over the years 2007-2019, 30 percent of the total power sector investment (US$750 million) was public or publicly guaranteed (0.5 percent of GDP per year on average), further commercial financing would be required in view of the projected large investment needs for network modernization and clean energy scale-up."}},"P180719":{"id":"P180719","countryname":["Republic of Ghana"],"lendinginstr":"Investment Project Financing","project_name":"Ghana Financial Stability Project","p2a_updated_date":"2024-06-02 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-05-30T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180719","status":"Active","project_abstract":{"cdata!":"The objective of the Financial Stability Project for Ghana is to support the recapitalization of viable banks and specialized deposit-taking institutions to contribute to financial stability. There are three components to the project, the first component being capitalization of fund A1 of Ghana financial stability fund. Component 1 will capitalize Fund A1 of the GFSF to support (alongside shareholders) the recapitalization of viable banks and SDIs and contribute to financial stability. The second component is the technical assistance. This component will finance technical assistance to improve BoG’s assessment of banking sector risks and inform the development of appropriate remedies, enhance GDPC’s preparedness, complete due diligence of banks and SDIs, and build the E&S risk management capacity of banks and SDIs. Finally, the third component is the project management, monitoring and evaluation. This component will cover project implementation costs, including the compensation of an investment advisory firm, capacity building of FSD staff, coordination, procurement, financial management (FM), M&E, and other related costs. Specifically, it will cover consultants’ salaries and related expenses, operational costs, implementation of the Stakeholder Engagement Plan (SEP), data collection for M&E, and other project implementation expenses. Stakeholder engagement will entail the completion of annual surveys of beneficiaries (mainly banks and SDIs) to assess their satisfaction with the solvency support and technical assistance provided under the project and share lessons learned."}},"P178683":{"id":"P178683","countryname":["Republic of Sierra Leone"],"lendinginstr":"Investment Project Financing","project_name":"Sierra Leone Connectivity and Agricultural Market Infrastructure Project","p2a_updated_date":"2024-05-31 00:00:00.0","totalcommamt":"74,000,000","boardapprovaldate":"2024-05-29T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178683","status":"Active"},"P501274":{"id":"P501274","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Host and Rohingya Enhancement of Lives Project","p2a_updated_date":"2024-05-29 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-05-28T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P501274","status":"Active"},"P500727":{"id":"P500727","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Inclusive Services and Opportunities for Host Communities and Displaced Rohingya Population","p2a_updated_date":"2024-05-29 00:00:00.0","totalcommamt":"192,500,000","boardapprovaldate":"2024-05-28T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500727","status":"Active"},"P174576":{"id":"P174576","countryname":["Republic of Guinea-Bissau"],"lendinginstr":"Investment Project Financing","project_name":"Guinea-Bissau: Solar Energy Scale-up and Access Project","p2a_updated_date":"2024-06-10 00:00:00.0","totalcommamt":"48,150,000","boardapprovaldate":"2024-05-28T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174576","status":"Active","project_abstract":{"cdata!":"The development objective of the Solar Energy Scale-Up and Access Project for Guinea-Bissau is to enable solar power generation and increase access to electricity in Guinea-Bissau. The project comprises of three components. The first component, development of solar energy generation and network enhancement purpose is to lay the groundwork for the development of solar photovoltaic (PV) generation plants, mini-grid development, and grid infrastructure upgrade. It consists of following sub-components: (i) preparation and implementation for utility-scale solar parks; (ii) solar grid infrastructure upgrade and expansion, and investment in battery energy storage system (BESS); (iii) distributed solar energy supply solutions; and (iv) investing in enhanced reliability of electricity. The second component, capacity building, technical assistance, and implementation support will finance technical assistance, capacity building and implementation support activities. It consists of following sub-components: (i) capacity building and technical assistance to water and electricity of Guinea Bissau (EAGB) and to Ministry of Energy (ME); and (ii) support to the project implementation unit. The third component, contingent emergency response component (CERC) will allow for rapid reallocation of grant uncommitted funds in the event of an eligible emergency as defined in OP 8.00."}},"P504420":{"id":"P504420","countryname":["Republic of Uzbekistan"],"lendinginstr":"Investment Project Financing","project_name":"INnovative SOcial Protection System for inclusiON of Vulnerable People Project","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-05-24T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504420","status":"Active"},"P177118":{"id":"P177118","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Investment Project Financing","project_name":"Cote d'Ivoire Water Security and Sanitation Support Program","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-05-24T00:00:00Z","closingdate":"3/29/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177118","status":"Active","project_abstract":{"cdata!":"The development objective of the Water Security and Sanitation Support Project for Côte d’Ivoire is to increase access to safely managed water and sanitation services, to improve the management of water resources and to strengthen the technical performance of water sector institutions in selected regions of Côte d’Ivoire. The project comprises of five components. The first component, mobilization and management of water resources for multiple uses consists of following sub-components: (i) rehabilitation of dams; (ii) improving the knowledge and management of water resources; and (iii) implementation of integrated water resources management (IWRM) at the local level. The second component, improving access to drinking water services consists of following sub-components: (i) construction and rehabilitation of water supply systems; (ii) construction of 10 multi-village systems in rural areas and small towns; and (iii) water supply in health centers and schools. The third component, improving access to sanitation and hygiene services consists of following sub-components: (i) construction of household latrines in rural areas and measures to strengthen local participation in water, sanitation, and hygiene (WASH); (ii) improving sanitation and hygiene in schools and health centers; and (iii) improving fecal sludge management in secondary cities. The fourth component, institutional strengthening and project management consists of following sub-components: (i) institutional strengthening; and (ii) project management. The fifth component, contingent emergency response component (CERC) will allow for rapid reallocation of International Development Association (IDA) credit uncommitted funds in the event of an eligible emergency as defined in OP 8.00."}},"P504764":{"id":"P504764","countryname":["Republic of Rwanda"],"lendinginstr":"Investment Project Financing","project_name":"Rwanda Health Emergency Preparedness, Response and Resilience Project Using the Multiphase Programmatic Approach","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"120,000,000","boardapprovaldate":"2024-05-24T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504764","status":"Active"},"P181632":{"id":"P181632","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to Togo for the Gulf of Guinea Northern Regions Social Cohesion Project","p2a_updated_date":"2024-05-24 00:00:00.0","totalcommamt":"23,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181632","status":"Active"},"P176883":{"id":"P176883","countryname":["Republic of Togo"],"lendinginstr":"Program-for-Results Financing","project_name":"Togo Public Sector Strengthening for Service Delivery Operation","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"75,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176883","status":"Active","project_abstract":{"cdata!":"The development objective of the Public Sector Strengthening for Service Delivery Program for Togo is to enhance human resource and public expenditure management. This Program-for-Results (PforR) supports the Government program to strengthen public sector capacity for service delivery in Togo. In October 2020, the Government of Togo (GoT) adopted the Togo Roadmap (Feuille de Route) to modernize and strengthen its public sector to support improved service delivery. The roadmap has three major strategic areas or axes: (1) strengthening social inclusion and harmony and consolidating peace (health, education, social protection, access to basic services such as water and electricity, security, and justice); (2) boosting job creation by building on the strengths of the economy (agriculture, logistics, extractive industries, and processing); and (3) modernizing the country and strengthening its structures (strengthening governance and public finance management, sustainable development, and resilience to future crises)."}},"P181371":{"id":"P181371","countryname":["Republic of Malawi"],"lendinginstr":"Program-for-Results Financing","project_name":"Malawi Fiscal Governance Program for Results","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181371","status":"Active","project_abstract":{"cdata!":"The development objective of the Fiscal Governance Program for Results for Malawi is to improve the effectiveness of resource mobilization, budget execution, and transparency of public finances in Malawi. The program for results (PforR) Program comprehensively covers the seven goals of the Malawi public financial management (PFM) strategy, organizing them into three Results Areas (RAs) and associated disbursement linked indicator (DLIs) under the operation. The three RAs represent the three primary stages of the budget cycle that are fundamental for strengthening fiscal governance in Malawi: (a) improving public resource mobilization; (b) strengthening budget prioritization and execution; and (c) enhancing resource transparency and accountability. The achievement of these results are supported by the three enablers of: (i) interoperability of digital systems for public resource management; (ii) climate responsiveness and sustainability; and (iii) citizen engagement and gender-sensitive implementation. The Program places emphasis on commitments made under the recent Malawi Country Climate Change and Development Report (CCDR) and Malawi gender assessment to provide the incentives for implementation with an emphasis on a whole-of-government approach and integration into the various stages of the PFM cycle."}},"P179159":{"id":"P179159","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Skills for Better Jobs Project","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179159","status":"Active","project_abstract":{"cdata!":"The development objective of Skills for Better Jobs Project is to enhance quality and relevance of skills among Cambodia's upcoming and existing workforce, and in case of an eligible crisis or emergency, respond promptly and effectively to it. This project has five components. 1) The first component, Strengthening Technical and Vocational Education and Training (TVET) to Upskill and Respond to Industry Needs, has the following sub-components: (i) Sector-wide improvements in industry engagement and quality in selected sectors; and (ii) Improvements in industry engagement and quality in selected training institutions. 2) The second component, Information and Orientation for Better Jobs, has the following sub-components: (i) Strengthening the Labor Market Information System; and (ii) Enhancing job search support and career guidance. The third component, Strengthening Sector Associations for Employer Engagement in Skills Development (EESD) and Expanding Skills Development, has the following sub-component: (i) Strengthening sector associations for EESD in selected sectors; and (ii) Enhancing and expanding skills development in selected sectors. 4) The fourth component, Project Management and Monitoring, aims to support project implementation and management, capacity building, Monitoring and Evaluation (M&E), and citizen engagement. 5) The fifth component, Contingent Emergency Response, will support the provision of immediate response to an eligible crisis or emergency, as needed."}},"P176769":{"id":"P176769","countryname":["Republic of Togo"],"lendinginstr":"Investment Project Financing","project_name":"Inclusive Development through Electricity Access","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176769","status":"Active","project_abstract":{"cdata!":"The development objective of Inclusive Development Through Electricity Access Project for Togo is to: (a) improve the reliability of electricity supply in project areas; (b) increase access to electricity services in project areas; and (c) improve the commercial performance of the distribution company CEET. This project has three components. 1) The first component, Construction of climate-resilient transmission lines, will finance (a) the construction of the top priority transmission line in the masterplan, a 161 kV HV line between Davié, Notsé, Kpalimé, and Atakpamé (DANOKA). 2) The second component, Electricity access expansion through grid and off-grid solutions in rural and urban areas, has the following sub-components: (i) Grid extension and densification in urban and peri-urban areas; (ii) Extension of the electricity grid in rural areas; and (iii) Financing of grid and off-grid electricity access costs. 3) The third component, Institutional capacity building, utility performance improvement and project implementation support, has the following sub-components: (i) Utility operational improvement; and (ii) Institutional strengthening, technical assistance, and project implementation support."}},"P179211":{"id":"P179211","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"Adaptive and Productive Social Safety Nets Project","p2a_updated_date":"2024-05-27 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-05-23T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179211","status":"Active"},"P177965":{"id":"P177965","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Development of Applied Knowledge and Skills for Human Development in Maharashtra  - (DAKSH) Maharashtra Program","p2a_updated_date":"2024-05-24 00:00:00.0","totalcommamt":"195,000,000","boardapprovaldate":"2024-05-22T00:00:00Z","closingdate":"3/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177965","status":"Active","project_abstract":{"cdata!":"The development objective of the Development of Applied Knowledge and Skills for Human Development in Maharashtra (DAKSH) Program for India is to improve skills and entrepreneurship training for enhanced employability in Maharashtra. The operation uses the program for results (PforR) instrument. DAKSH covers a wide range of activities with different entities at the State, district, and sub-district levels in support of the Government of Maharashtra’s (GoM’s) skilling, employment, and entrepreneurship programs. The Program is considered an optimal fit to support implementation of a decentralized and convergent approach to reposition Maharashtra’s focus on impact and accountability for results across its districts and sub-programs, which constitute the GoM’s program. The PforR instrument will provide penetrated vision to support institutional capacity down to the regional and district levels to plan, coordinate, fund, monitor and evaluate activities, and adjust them in response to sectoral demand."}},"P179950":{"id":"P179950","countryname":["Georgia"],"lendinginstr":"Investment Project Financing","project_name":"Enhancing Energy Security through Power Interconnection and Renewable Energy Program","p2a_updated_date":"2024-05-23 00:00:00.0","totalcommamt":"35,000,000","boardapprovaldate":"2024-05-21T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179950","status":"Active","project_abstract":{"cdata!":"The objective of the Enhancing Energy Security through Power Interconnection and Renewable Energy Program as First Phase of a Multi-Phase Programmatic Approach (MPA) is to enhance the implementation readiness of the Black Sea Submarine Cable (BSSC) Project. There are two components to the project, the first component being black sea seabed surveys. This component would finance (a) the surveys of the Black Sea seabed (seabed surveys), (b) the supervision of the two studies, and (c) capacity building and knowledge transfer to support GSE and the Government of Georgia in designing, procuring, and executing them. The second component is the legal and financial advisory and technical assistance. This component will finance advisory and TA activities to support the preparation of the BSSC Project: Institutional, legal, and financial advisory, Preparatory technical studies for the on-land OHLs connecting the BSSC to Georgia’s domestic high-voltage grid, E&S instruments for the BSSC Project and the on-land OHLs in Georgia and Romania, and Stakeholder engagement and communication support."}},"P181407":{"id":"P181407","countryname":["Somali Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for Somalia Recurrent Cost and Reform Financing Phase III","p2a_updated_date":"2024-05-22 00:00:00.0","totalcommamt":"69,000,000","boardapprovaldate":"2024-05-21T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181407","status":"Active"},"P500402":{"id":"P500402","countryname":["Kingdom of Morocco"],"lendinginstr":"Investment Project Financing","project_name":"Morocco Sustainable Oasis Ecosystems Management Project","p2a_updated_date":"2024-05-21 00:00:00.0","totalcommamt":"16,300,000","boardapprovaldate":"2024-05-20T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500402","status":"Active","project_abstract":{"cdata!":"The development objective of Sustainable Oasis Ecosystems Management Project for Morocco is to strengthen the sustainable oasis ecosystems management for climate resilience in Aoufouss and Akka Oasis and develop a national standard for integrated oasis management. This project has three components. 1) The first component, Institutional Strengthening and Sharing of Innovative Oasis Knowledge, has the following sub-components: (i) Strengthening the capacity of ANDZOA, ANEF, ORMVA, ABHs, ADA, DDFP, DF, DSS, DPA, and ONCA; and (ii) Innovative solutions geoinformatics platform, integrated local planning, and promotion of Oasis as part of Morocco’s national heritage. 2) The second component, Restoration of Oasis Ecosystems and Livelihoods, has the following sub-components: (i) Restoration of Oasis landscapes and ecosystem services; and (ii) Community resilience and livelihoods restoration. 3) The third component, Project Management, will support project management, communication, monitoring, and implementation at the national and regional levels."}},"P180430":{"id":"P180430","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Brazil: Pernambuco Rural Water and Sanitation Project (PROSAR)","p2a_updated_date":"2024-05-20 00:00:00.0","totalcommamt":"90,000,000","boardapprovaldate":"2024-05-17T00:00:00Z","closingdate":"7/14/2032 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180430","status":"Active","project_abstract":{"cdata!":"The objective of the Pernambuco Rural Water and Sanitation Project for Brazil is to increase access to sustainable, safely managed drinking water supply and improved sanitation in selected rural communities and to build the Borrower’s capacity to reach universal RWSS services. There are three components to the project. The first component being increase access to climate-resilient, safely managed RWS and improved sanitation. This component aims at increasing rural population’s access to safely managed drinking water supply resilient to water scarcity, droughts and floods, and improved on-site sanitation solutions, thereby contributing to the State universal WSS access goal and increasing the rural population’s resilience to climate change exacerbated water scarcity, droughts, and floods. This component includes three subcomponents: increase access to safely managed RWS and improved on-site sanitation solutions with climate-resilient designs, improve climate-resilience of water sources, and innovate with climate-resilient, safely managed RWSS pilot solutions for universal access. The second component is to build the Borrower’s capacity to reach universal and climate resilient RWSS access and sustainably managed RWS systems and their water sources. This component includes two subcomponents: build the Borrower’s capacity to reach universal RWSS access and sustainably managed RWS systems, and strengthen the resilience of the Borrower’s RWS systems’ water sources under climate risks. Finally, the third component is the project management. This component strengthens the Borrower’s capacity to carry out the Project through, inter alia, (a) the setting up and operationalization of the PMU, in particular with respect to (i) the coordination, management and administration of Project’s activities; (ii) the hiring of staff and of key consultancy firms; (iii) the delivery of training; (iv) the provision of equipment; (v) the carrying out of financial management and procurement activities; (vi) the carrying out of monitoring, supervision and project evaluation activities; (vii) the carrying out of the environmental, social and dam safety aspects of the Project, as well as the implementation of a grievance redress mechanism; (viii) the carrying out of technical and financial audits; and (ix) the carrying out of citizen and gender engagements, and communication and outreach activities; and (b) the strengthening of internal controls of the Borrower through the provision of support to the State Comptroller General."}},"P180462":{"id":"P180462","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Espírito Santo Digital Acceleration Project","p2a_updated_date":"2024-05-20 00:00:00.0","totalcommamt":"61,220,000","boardapprovaldate":"2024-05-17T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180462","status":"Active","project_abstract":{"cdata!":"The objective of the Espirito Santo Digital Acceleration Project for Brazil is to strengthen digital infrastructure resilience, to modernize emergency management, and to improve digital public infrastructure in the State of Espirito Santo. There are four components to the project, the first component being resilient data infrastructure and digital skills. This component includes four subcomponents: Technical assistance, support to development of a resilient data center, digital skills, and digital projects acceleration platform. The second component is the strengthening of digital public infrastructure. This component includes three subcomponents: enhancing software solutions to improve service delivery, hardware to support the operation of the services portal infrastructure, and Design and implementation of software applications and consulting services according to GoES’s needs. The third component is the modernize emergency management system. This component includes three subcomponents: centralized emergency response technical integration plan and feasibility studies, Design, build and operationalization of the Integrated Center for Social Defense (CIDES), and development and integration of all the systems and procedures for the management of emergency calls. Finally, the fourth component is the project management. This component will provide support for the management and implementation of the project, including: (a) project coordination; (b) procurement and financial management (FM); (c) implementation of E&S risk management measures; (d) Monitoring and Evaluation (M&E); (e) support of training and advisory and audit services needed; and (f) public information; citizen engagement, and communication. Special attention will be devoted to promoting equal participation of women in all decision-making bodies under the project and contributing to tackling barriers to recruitment, retention, and promotion."}},"P181648":{"id":"P181648","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"West Africa Coastal Areas Resilience Investment Project AF CI","p2a_updated_date":"2024-05-20 00:00:00.0","totalcommamt":"7,000,000","boardapprovaldate":"2024-05-17T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181648","status":"Active"},"P180409":{"id":"P180409","countryname":["Bosnia and Herzegovina"],"lendinginstr":"Investment Project Financing","project_name":"Geospatial Infrastructure and Valuation Enhancement Project (GIVE)","p2a_updated_date":"2024-05-17 00:00:00.0","totalcommamt":"24,900,000","boardapprovaldate":"2024-05-16T00:00:00Z","closingdate":"1/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180409","status":"Active","project_abstract":{"cdata!":"The development objective of Geospatial Infrastructure and Valuation Enhancement (GIVE) Project is to improve the accuracy and accessibility of land administration information in the Federation of Bosnia and Herzegovina. This project has four components. 1) The first component, Support to the Establishment of Spatial Data Infrastructure, will finance activities that support increased geospatial data accessibility and usability. 2) The second component, Building Register Development, will finance activities for the establishment, scale-up, and maintenance of a building register pursuant to newly adopted Federation of Bosnia and Herzegovina (FBiH) government regulations that will cover the entire territory of FBiH. 3) The third component, Real Estate Valuation, will finance activities related to the introduction and rollout of mass valuation throughout FBiH pursuant to newly adopted FBiH government regulations and consistent with international standards and best practices. 4) The fourth component, Capacity Building and Project Management,  (i) strengthening institutional capacities, structures, and inter-institutional collaboration, with the aim of ensuring long-term sustainability of GIVE project investments as well as the development and implementation of policies, legal acts and technical guidelines; (ii) training and capacity building programs mainly in areas of SDI implementation, cadastral and land registration harmonization, building register creation and real estate mass valuation, awareness raising and information campaigns; and (iii) project management, including support to the Project Implementation Unit (PIU) in carrying out project management and implementation, including audits, training, environmental and social, and fiduciary management, and monitoring and evaluation."}},"P181595":{"id":"P181595","countryname":["Tuvalu"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Maritime Investment in Climate Resilient Operations II","p2a_updated_date":"2024-05-16 00:00:00.0","totalcommamt":"42,000,000","boardapprovaldate":"2024-05-15T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181595","status":"Active"},"P181243":{"id":"P181243","countryname":["Republic of Seychelles"],"lendinginstr":"Investment Project Financing","project_name":"Seychelles Solid Waste Management Project","p2a_updated_date":"2024-05-16 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2024-05-14T00:00:00Z","closingdate":"11/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181243","status":"Active","project_abstract":{"cdata!":"The development objective of the Solid Waste Management Project for Seychelles is to enhance the financial and environmental performance of solid waste management in Seychelles. The project comprises of three components. The first component is strengthening operations and increasing disposal capacity at Providence landfill. It includes the dumpsite at Providence I, the existing sanitary landfill cell at Providence II, areas set aside for waste diversion, unutilized land, and ancillary infrastructure such as weigh bridge, offices, and the leachate treatment plant. The second component, institutional strengthening to improve solid waste management and to promote circularity aims to improve solid waste management and promote circularity by strengthening regulatory frameworks; increasing the participation of the private sector, the community, women and youth in waste management and circularity; and improving national capacity to manage solid waste. The third component, project management aims to support the incremental operating costs for the project implementation unit (PIU) and project management consultants, including measures to strengthen the capacity of the PIU to manage the environmental and social (E and S) risks of the project activities in accordance with the World Bank’s environmental and social management framework (ESMF), and maintaining the grievance mechanism."}},"P179656":{"id":"P179656","countryname":["Republic of Kosovo"],"lendinginstr":"Investment Project Financing","project_name":"Early Childhood Education and Care for Kosovo's Human Capital Project","p2a_updated_date":"2024-05-16 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2024-05-14T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179656","status":"Active","project_abstract":{"cdata!":"The development objective of the Early Childhood Education and Care (ECEC) for Kosovo’s Human Capital Project for Kosovo is to improve the quality and equitable access to early childhood education and care services in Kosovo. The project comprises of four components. The first component, improving the quality of ECEC services objective is to improve the regulatory framework, and operational and implementation capacity to assess and improve the quality of ECEC services. It consists of following sub-components: (i) ECEC regulatory updates and development of the new ECEC quality and monitoring frameworks; (ii) capacity building of ECEC professionals; and (iii) development and implementation of cross-sectoral ECEC module for the education management information system (EMIS) and improvement of the core educational management information systems (EMIS) system. The second component, fostering multi-sectoral integration in ECEC service delivery objective is to support the government in improving child development outcomes, particularly through encouraging stimulating development for the first 1,000 days of life, reducing stunting rates through promoting exclusive breastfeeding and healthy nutrition, enhancing child monitoring and early interventions, and cross sectoral integration of services. It consists of following sub-components: (i) early stimulation and promoting healthy nutrition; and (ii) child monitoring and early childhood intervention program. The third component, increasing equitable access to ECEC services objective is to support the government’s priorities to increase access to ECEC services for families and increase enrollment rates. It consists of following sub-components: (i) green and universal repurposing, building, and renovating ECEC facilities; (ii) equipping of ECEC centers with new furniture and learning materials; and (iii) support for the participation of vulnerable children in the voucher program. The fourth component, project management and monitoring and evaluation objective is to support the day-to-day management of project implementation, the monitoring and evaluation of its implementation, and technical assistance and operational support for the Ministry of Education, Science, Technology, and Innovation of the Republic of Kosovo (MESTI)."}},"P500588":{"id":"P500588","countryname":["United Republic of Tanzania"],"lendinginstr":"Investment Project Financing","project_name":"Zanzibar Judicial Modernization Project (Zi-JUMP)","p2a_updated_date":"2024-05-16 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-05-10T00:00:00Z","closingdate":"5/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500588","status":"Active","project_abstract":{"cdata!":"The development objective of the Zanzibar Judicial Modernization Project (Zi-JUMP) for Tanzania is to enhance the accessibility, efficiency, and transparency of selected citizen-centric judicial services in Zanzibar. The project comprises of three components. The first component, access to justice services aims to enhance access to justice by expanding the geographic coverage of District Magistrate Court (DMC) services and strengthening alternative dispute resolution (ADR) mechanisms to bring these services closer to citizens and businesses. It consists of following sub-components: (i) construction of smart courts in select areas; (ii) renovation of select court buildings; (iii) building capacity to strengthen the use of ADR; and (iv) development of a gender justice strategy. The second component, court efficiency will focus on addressing court inefficiencies by increasing capacities through staff knowledge exchange and training programs, streamlining, and simplifying court procedures, introducing a case management tool to monitor and manage cases, and introducing and rolling-out a staff performance management system. It consists of following sub-components: (i) staff training and knowledge exchange programs in strategic areas; (ii) improvement in case and backlog clearance; (iii) introduction of a judicial information management system (JIMS); and (iv) capacity building to operationalize a staff performance management system (PMS). The third component, citizen and stakeholders engagement will address this through identifying and supporting initiatives that will foster citizen awareness and engagement, inter-institutional initiatives to improve court user experience, and change management initiatives to strengthen the understanding of judicial service delivery. It consists of following sub-components: (i) capacity building of key stakeholders; (ii) design and roll-out of public engagement initiatives; (iii) development and implementation of court user satisfaction surveys; and (iv) strengthen court administration and support project management."}},"P179831":{"id":"P179831","countryname":["Republic of Kosovo"],"lendinginstr":"Investment Project Financing","project_name":"KOMPAS - Kosovo Comprehensive Approach to Health System Strengthening","p2a_updated_date":"2024-05-09 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2024-05-07T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179831","status":"Active"},"P181646":{"id":"P181646","countryname":["Republic of the Marshall Islands"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the Pacific Resilience Project II under the Pacific Resilience Program","p2a_updated_date":"2024-05-07 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2024-05-06T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181646","status":"Active"},"P178531":{"id":"P178531","countryname":["Nepal"],"lendinginstr":"Development Policy Lending","project_name":"Nepal Finance for Growth DPC (3 of 3)","p2a_updated_date":"2024-05-08 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2024-05-06T00:00:00Z","closingdate":"4/25/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178531","status":"Active","project_abstract":{"cdata!":"The objective of the Third Nepal Finance for Growth Development Policy Credit Program is to support the Government of Nepal in its efforts to strengthen financial sector stability, diversify financial solutions, and increase access to financial services. The third Finance for Growth (F4G3) Development Policy Credit (DPC) will support the Government of Nepal (GoN) in its efforts to strengthen financial sector stability, diversify financial solutions, and increase access to financial services. The F4G3 DPC, in the amount of US80 million dollars equivalent, is the third in a programmatic series of three operations designed to support the country’s transition to the Green, Inclusive and Resilient Development (GRID) pathway, as announced in the Kathmandu Declaration of September 2021. The closing date is April 25, 2025. The proposed F4G3 DPC supports the approach taken by the GoN to return the economy on a post-pandemic recovery path in line with the GRID framework adopted in 2021. Pillar I of the proposed operation promotes resilience by supporting the institutional capacity of the Nepal Rastra Bank (NRB) to oversee the banking sector and by increasing public accountability of the banking sector for climate-related risks. Pillar II opens capital, insurance, and disaster risk markets and fosters financial product innovations. Pillar III extends financial inclusion and improves ease of business-to business and household-to-business transactions. The gender gap in access to digital financial services is addressed via a combination of reforms, specifically targeting women and women entrepreneurs. Climate agenda is fostered through enhancement of supervision of climate-related risk by financial sector regulators and by creating enabling environment for issuance of green financial products in line with the recommendations of the Nepal Country Climate and Development Report (CCDR) (2022)."}},"P177328":{"id":"P177328","countryname":["Republic of Namibia"],"lendinginstr":"Investment Project Financing","project_name":"Transmission Expansion and Energy Storage Project","p2a_updated_date":"2024-05-08 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-05-06T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177328","status":"Active","project_abstract":{"cdata!":"The development objective of Transmission Expansion and Energy Storage Project is to strengthen Namibia’s transmission network and enable integration of renewable energy generation. This project has three components. 1) The first component, A-K Transmission Line, will support the engineering, procurement and construction and, as the case may be, operation and maintenance costs associated with the development and implementation of the A-K transmission line. 2) The second component, BESS, will support the design, supply, installation, and commissioning of a utility-scale BESS for an estimated capacity/energy of approximately 45 MW/90 MWh25 and the cost of an Owners Engineer who will assist NamPower in the supervision of the BESS construction and commissioning. 3) The third component, Technical Assistance, has the following sub-components: (i) Improving the risk profile of RE projects; and (ii) Enhancing socio-economic benefits of NamPower projects and capacity building of NamPower staff by inter alia."}},"P181512":{"id":"P181512","countryname":["Somali Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Somalia Urban Resilience Project Phase II Third Additional Financing","p2a_updated_date":"2024-05-03 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-05-02T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181512","status":"Active"},"P181493":{"id":"P181493","countryname":["Organization of Eastern Caribbean States"],"lendinginstr":"Investment Project Financing","project_name":"Unleashing the Blue Economy of the Caribbean Additional Financing","p2a_updated_date":"2024-05-01 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-04-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181493","status":"Active"},"P181622":{"id":"P181622","countryname":["Islamic  Republic of Afghanistan"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the Afghanistan Community Resilience and Livelihoods Project","p2a_updated_date":"2024-05-01 00:00:00.0","totalcommamt":"154,000,000","boardapprovaldate":"2024-04-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181622","status":"Active"},"P181369":{"id":"P181369","countryname":["Republic of Cabo Verde"],"lendinginstr":"Investment Project Financing","project_name":"Cabo Verde Resilient Tourism and Blue Economy Development Second AF","p2a_updated_date":"2024-05-01 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-04-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181369","status":"Active"},"P502471":{"id":"P502471","countryname":["Republic of Mozambique"],"lendinginstr":"Investment Project Financing","project_name":"Capacity Building for Improved Gender-based Violence Response Project","p2a_updated_date":"2024-05-07 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-04-30T00:00:00Z","closingdate":"5/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502471","status":"Active"},"P181137":{"id":"P181137","countryname":["Commonwealth of Dominica"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing EALCRP","p2a_updated_date":"2024-05-01 00:00:00.0","totalcommamt":"8,000,000","boardapprovaldate":"2024-04-30T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181137","status":"Active"},"P180153":{"id":"P180153","countryname":["Republic of Moldova"],"lendinginstr":"Investment Project Financing","project_name":"Moldova Rural Connectivity Project","p2a_updated_date":"2024-05-07 00:00:00.0","totalcommamt":"105,980,000","boardapprovaldate":"2024-04-29T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180153","status":"Active","project_abstract":{"cdata!":"The objective of the Rural Connectivity Project for Moldova  is: (i) to improve climate-resilient road connectivity in selected rural communities; (ii) to enhance road transit through selected border crossings with Romania; and (iii) in case of an\nEligible Crisis or Emergency, to respond promptly and effectively to it. The project has four components. (1) Linking local communities with economic opportunities; (2) Facilitating trade and expanding Solidarity Lanes; (3) Building sustainability, delivery capacity and project management support; and (4) Contingency Emergency Response Component will enable the reallocation of loan/credit proceeds from other components to provide immediate recovery and reconstruction support\nfollowing an eligible crisis, as needed."}},"P179238":{"id":"P179238","countryname":["Republic of Chad"],"lendinginstr":"Investment Project Financing","project_name":"Chad Agribusiness and Rural Transformation Project","p2a_updated_date":"2024-04-29 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-04-25T00:00:00Z","closingdate":"7/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179238","status":"Active"},"P181523":{"id":"P181523","countryname":["Islamic Republic of Mauritania"],"lendinginstr":"Investment Project Financing","project_name":"Social Safety Net System Project II second Additional Financing","p2a_updated_date":"2024-04-26 00:00:00.0","totalcommamt":"36,000,000","boardapprovaldate":"2024-04-25T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181523","status":"Active"},"P500488":{"id":"P500488","countryname":["Republic of Mozambique"],"lendinginstr":"Investment Project Financing","project_name":"Climate Resilient Roads for the North Project","p2a_updated_date":"2024-04-26 00:00:00.0","totalcommamt":"125,000,000","boardapprovaldate":"2024-04-25T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500488","status":"Active","project_abstract":{"cdata!":"The development objective of the Climate Resilient Roads for the North Project for Mozambique is to improve climate resilient road connectivity in the Northern Provinces of Mozambique. The project comprises of four components. The first component, climate resilient road connectivity improvement will support the improvement of roads and bridges in the north. It consists of following sub-components: (i) improvement and maintenance of road network; and (ii) construction of bridges. The second component, safe access and mobility improvement will include an integral approach to road safety. The third component, institutional strengthening and project management will finance incremental operating costs, including for office rent if needed, and institutional strengthening activities with a focus on northern Mozambique. The fourth component, contingent emergency response component (CERC) will enable access to rapid financing by providing for a possible reallocation of uncommitted project funds in the event of a natural disaster, either by a formal declaration of emergency by the national or provincial Government or upon a formal request from the Government of Mozambique (GoM)."}},"P504023":{"id":"P504023","countryname":["Republic of Rwanda"],"lendinginstr":"Investment Project Financing","project_name":"Rwanda-Emergency Connectivity Restoration Project","p2a_updated_date":"2024-05-06 00:00:00.0","totalcommamt":"27,360,000","boardapprovaldate":"2024-04-25T00:00:00Z","closingdate":"9/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504023","status":"Active","project_abstract":{"cdata!":"The objective of the Emergency Connectivity Restoration Project for Rwanda is to restore the connectivity in areas of Rwanda affected by floods and landslides in a climate-resilient manner. There are four components to the project, the first component being rehabilitation and repair of damaged transport infrastructure in a resilient and safe manner. This component includes four subcomponents: rehabilitation of national roads, rehabilitation of district roads, and rehabilitation of bridges. The second component is the environment and social risk management, community engagement, and awareness campaigns. The third component is the implementation support, monitoring, capacity building. Finally, the fourth component is the contingent emergency response. This zero-dollar component can be activated to provide support for an immediate response to an eligible crisis or emergency as needed. A CERC Manual and an Emergency Action Plan will have to be prepared separately and approved by the World Bank, which will constitute a disbursement condition for the CERC. If this component is activated, the project will be restructured to reallocate funds, and to revise the PDO, indicators, and implementation arrangements as needed."}},"P180656":{"id":"P180656","countryname":["Republic of The Gambia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the Gambia Inclusive and Resilient Agricultural Value Chain Development Project (GIRAV)","p2a_updated_date":"2024-04-26 00:00:00.0","totalcommamt":"68,000,000","boardapprovaldate":"2024-04-25T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180656","status":"Active"},"P174825":{"id":"P174825","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"West Bengal Boosting Logistics Efficiency and Trade Facilitation Program","p2a_updated_date":"2024-04-29 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-04-24T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174825","status":"Active","project_abstract":{"cdata!":"The development objective of the West Bengal Boosting Logistics Efficiency and Trade Facilitation Program for India is to increase logistics efficiency and trade facilitation in West Bengal. The program aims to result in: (i) enhanced institutional capacity for promoting trade and logistics; and (ii) reduced trade costs. The program will increase climate resilience and sustainability in the logistics and trade sectors. The program will support the adoption and implementation of sustainability frameworks that support infrastructure investment plans and energy efficiency measures in warehousing and cold storage facilities. It will also increase overall efficiency of the movement of goods and reduce greenhouse gas (GHG) emissions (as logistics parks lend themselves to promote hub and spoke arrangements in freight movement, which promote utilization of bigger and fuller trucks that have a low GHG footprint)."}},"P179849":{"id":"P179849","countryname":["Republic of Armenia"],"lendinginstr":"Development Policy Lending","project_name":"Second Green, Resilient and Inclusive Development Policy Operation","p2a_updated_date":"2024-04-26 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-04-24T00:00:00Z","closingdate":"3/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179849","status":"Active"},"P502685":{"id":"P502685","countryname":["Republic of Indonesia"],"lendinginstr":"Investment Project Financing","project_name":"Technical Assistance Grant to Support SINERGIS Implementation","p2a_updated_date":"2024-04-23 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-04-22T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502685","status":"Active"},"P178557":{"id":"P178557","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Integrated Sustainable Mobility Project in the Foz do Rio Itajaí Region","p2a_updated_date":"2024-04-15 00:00:00.0","totalcommamt":"90,000,000","boardapprovaldate":"2024-04-12T00:00:00Z","closingdate":"11/30/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178557","status":"Active"},"P180982":{"id":"P180982","countryname":["Democratic Republic of Sao Tome and Prin"],"lendinginstr":"Investment Project Financing","project_name":"Coastal Resilience and Sustainable Tourism Project","p2a_updated_date":"2024-04-15 00:00:00.0","totalcommamt":"14,400,000","boardapprovaldate":"2024-04-12T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180982","status":"Active"},"P181574":{"id":"P181574","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"Human Capital and Women's and Girls' Empowerment (Maïngo) Project Additional Financing","p2a_updated_date":"2024-04-11 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-04-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181574","status":"Active"},"P181561":{"id":"P181561","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing- CAR Health Service Delivery and System Strengthening Project","p2a_updated_date":"2024-04-11 00:00:00.0","totalcommamt":"24,800,000","boardapprovaldate":"2024-04-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181561","status":"Active"},"P181658":{"id":"P181658","countryname":["Republic of Kiribati"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the Kiribati Outer Islands Transport Infrastructure Investment Project","p2a_updated_date":"2024-04-09 00:00:00.0","totalcommamt":"10,000,000","boardapprovaldate":"2024-04-08T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181658","status":"Active"},"P178120":{"id":"P178120","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Resilient Agri-food Clusters Development Project","p2a_updated_date":"2024-04-10 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-04-08T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178120","status":"Active","project_abstract":{"cdata!":"The objective of the Resilient Agri-food Clusters Development Project for Kyrgyz Republic is to increase productivity and climate resilience of selected agri-food clusters and in case of an eligible crisis or emergency, respond promptly and effectively to it. There are four components to the project, the first component being investment for agri-food clusters development. This component would support investment loans in each selected agri-food cluster by financing producers and productive partnerships among producers and aggregators and processors engaged in production and value addition. The second component is the strengthening institutions and systems. This component will be implemented by the Ministry of Water Resources, Agriculture and Processing Industry (MoWRAPI) to support the two agri-food clusters: (i) dairy cluster in Chui and Jalal-Abad oblasts; and (ii) horticulture cluster in Naryn and Jalal-Abad oblasts. This component includes three subcomponents: training and capacity building of agri-food clusters, seed system improvement, and improved livestock breeding and information management system. The third component is the operational support and project management. This component will support project implementation, including developing a centralized project monitoring and evaluation system that is adopted by the CLMU and ABCC and regional implementation units, a communication and citizen engagement strategy, compliance with environment and social standards and fiduciary requirements, training, and incremental operating costs. Finally, the fourth component is the contingent emergency response component. The project will include a zero-dollar component that would provide support in the event of an eligible crisis or emergency, including climate-related disasters, to reallocate project funds to support emergency response. This component would draw from the uncommitted credit/grant resources under the project from other components to cover emergency response. An emergency eligible for financing is an event that has caused or is likely imminently to cause, a major adverse economic and/or social impact to the Borrower, associated with disaster."}},"P179357":{"id":"P179357","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"Uttarakhand Climate Responsive Rainfed Farming Project","p2a_updated_date":"2024-04-03 00:00:00.0","totalcommamt":"96,200,000","boardapprovaldate":"2024-04-01T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179357","status":"Active"},"P179749":{"id":"P179749","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"Uttarakhand Disaster Preparedness and Resilience Project","p2a_updated_date":"2024-04-03 00:00:00.0","totalcommamt":"135,000,000","boardapprovaldate":"2024-04-01T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179749","status":"Active"},"P504532":{"id":"P504532","countryname":["Democratic Republic of the Congo"],"lendinginstr":"Investment Project Financing","project_name":"Democratic Republic of Congo Health Emergency Preparedness, Response, and Resilience Project","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2024-03-30T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504532","status":"Active"},"P504531":{"id":"P504531","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Burundi Health Emergency Preparedness, Response, and Resilience Project","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-03-30T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504531","status":"Active"},"P178401":{"id":"P178401","countryname":["People's Republic of China"],"lendinginstr":"Program-for-Results Financing","project_name":"China: Yellow River Basin Ecological Protection and Environmental Pollution Control Program (Gansu and Shandong)","p2a_updated_date":"2024-04-04 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-03-29T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178401","status":"Active"},"P180228":{"id":"P180228","countryname":["Republic of Rwanda"],"lendinginstr":"Investment Project Financing","project_name":"Kigali Logistics Platform Connectivity Development Project","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"126,000,000","boardapprovaldate":"2024-03-29T00:00:00Z","closingdate":"9/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180228","status":"Active"},"P176303":{"id":"P176303","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Program-for-Results Financing","project_name":"Ethiopia Rural Connectivity to Support Food Security Program","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-03-29T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176303","status":"Active"},"P181545":{"id":"P181545","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the Second Urban Water Supply and Sanitation Project","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"275,000,000","boardapprovaldate":"2024-03-29T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181545","status":"Active"},"P179797":{"id":"P179797","countryname":["Republic of Mozambique"],"lendinginstr":"Investment Project Financing","project_name":"Green Energy Corridors Project","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-03-29T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179797","status":"Active"},"P180762":{"id":"P180762","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Türkiye Industrial Emissions Reduction Project","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"416,700,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180762","status":"Active"},"P176375":{"id":"P176375","countryname":["Republic of Turkiye"],"lendinginstr":"Program-for-Results Financing","project_name":"Accelerating the Market Transition for Distributed Energy Program as part of ECARES MPA","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"664,400,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"3/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176375","status":"Active","project_abstract":{"cdata!":"The development objective of the Accelerating the Market Transition for Distributed Energy Program as part of Europe and Central Asia Renewable Energy Scale-up (ECARES) Multiphase Programmatic Approach (MPA) for Türkiye is to increase renewable energy capacity in participating countries of the Europe and Central Asia region. The program development objective (PrDO) will be achieved through investments structured along three pillars: (1) enabling policies and institutional frameworks; (2) renewable energy (RE) grid integration; and (3) financial and risk mitigation solutions."}},"P504220":{"id":"P504220","countryname":["Islamic  Republic of Afghanistan"],"lendinginstr":"Investment Project Financing","project_name":"EMERGe","p2a_updated_date":"2024-03-29 00:00:00.0","totalcommamt":"16,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504220","status":"Active","project_abstract":{"cdata!":"The development objective of Empowering Microfinance and Enterprises for Resilience and Growth Project for Afghanistan is to support the demand for and supply of finance for micro and small enterprises in Afghanistan, focusing on women's financial inclusion.  This project has two components. 1) The first component, Reviving Micro-Finance Providers, has the following sub-components: (i) Capital Support Grants; (ii) Product Diversification and Deepening of Microfinance Sector; and (iii) Component Management and Implementation Costs. 2) The second component, Building a Pipeline of Bankable Micro and Small Enterprises, has the following sub-components: (i) Business Development Services; and (ii) Credit Viability Fund (CVF)."}},"P181626":{"id":"P181626","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"THIRD ADDITIONAL FINANCING FOR STRENGTHEN ETHIOPIA’S ADAPTIVE SAFETY NET PROJECT","p2a_updated_date":"2024-03-29 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181626","status":"Active","project_abstract":{"cdata!":"The development objectives of Third Additional Financing for Strengthen Ethiopia’s Adaptive Safety Net Project are (a) to expand geographic coverage and enhance service delivery of Ethiopia’s adaptive rural safety net to improve the well-being of extremely poor and vulnerable households in drought prone communities, and (b) in case of an Eligible Early Response Financing Event (“Eligible ERF Event”), respond promptly and effectively to it. This project has three components. 1) The first component, Adaptive Productive Safety Net, has the following sub-components: (i) Public works; (ii) Mother and Child Package; (iii) Safety Net Transfers to Extremely Poor People; and (iv) 4 Complimentary Livelihood Services. 2) The second component, Improved Shock Responsiveness of the Rural Safety Net will not include any additional funding to this component of the parent project. 3) The third component, Systems, Capacity Development, and Program Management Support, has the following sub-components: (i) Systems Development; and (ii)  Capacity Building, Management and Administration."}},"P500524":{"id":"P500524","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Sustainable Human Development Project in the State of Pará","p2a_updated_date":"2024-03-29 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500524","status":"Active"},"P181391":{"id":"P181391","countryname":["Republic of Zambia"],"lendinginstr":"Investment Project Financing","project_name":"Girls' Education and Women's Empowerment and Livelihoods for Human Capital Project","p2a_updated_date":"2024-04-04 00:00:00.0","totalcommamt":"157,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181391","status":"Active"},"P180497":{"id":"P180497","countryname":["Federative Republic of Brazil"],"lendinginstr":"Development Policy Lending","project_name":"BR State of Ceará Sustainable Development Policy Loan","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"541,880,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180497","status":"Active"},"P176682":{"id":"P176682","countryname":["United Republic of Tanzania"],"lendinginstr":"Investment Project Financing","project_name":"Second Tanzania Intermodal and Rail Development Project","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176682","status":"Active"},"P181080":{"id":"P181080","countryname":["Republic of Colombia"],"lendinginstr":"Development Policy Lending","project_name":"Colombia Green and Resilient DPO 2","p2a_updated_date":"2024-04-04 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"4/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181080","status":"Active"},"P180173":{"id":"P180173","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Türkiye Socially Inclusive Green Transition Project","p2a_updated_date":"2024-03-30 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2024-03-28T00:00:00Z","closingdate":"12/31/2031 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180173","status":"Active"},"P176731":{"id":"P176731","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1)","p2a_updated_date":"2024-03-28 00:00:00.0","totalcommamt":"522,630,000","boardapprovaldate":"2024-03-26T00:00:00Z","closingdate":"8/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176731","status":"Active"},"P502032":{"id":"P502032","countryname":["Ukraine"],"lendinginstr":"Development Policy Lending","project_name":"Growth Foundations DPO","p2a_updated_date":"2024-03-27 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-03-26T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502032","status":"Active"},"P180508":{"id":"P180508","countryname":["Hashemite Kingdom of Jordan"],"lendinginstr":"Program-for-Results Financing","project_name":"Enhancing Women Economic Opportunities in Jordan Operation","p2a_updated_date":"2024-03-28 00:00:00.0","totalcommamt":"221,000,000","boardapprovaldate":"2024-03-26T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180508","status":"Active"},"P180291":{"id":"P180291","countryname":["Hashemite Kingdom of Jordan"],"lendinginstr":"Program-for-Results Financing","project_name":"Jordan People-Centric Digital Government Program for Results","p2a_updated_date":"2024-03-28 00:00:00.0","totalcommamt":"321,000,000","boardapprovaldate":"2024-03-26T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180291","status":"Active"},"P179051":{"id":"P179051","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for the Sindh Barrages Improvement Project","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"71,700,000","boardapprovaldate":"2024-03-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179051","status":"Active"},"P181550":{"id":"P181550","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Urban Productive Safety Net and Jobs Project Second Additional Financing","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"95,000,000","boardapprovaldate":"2024-03-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181550","status":"Active"},"P174402":{"id":"P174402","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Islamic Republic of Pakistan: Digital Economy Enhancement Project","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"78,000,000","boardapprovaldate":"2024-03-22T00:00:00Z","closingdate":"7/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174402","status":"Active"},"P180076":{"id":"P180076","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Lowlands Livelihood Resilience Project, Phase Two (LLRP II)","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"340,000,000","boardapprovaldate":"2024-03-22T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180076","status":"Active"},"P181306":{"id":"P181306","countryname":["Republic of Panama"],"lendinginstr":"Development Policy Lending","project_name":"Panama Second Climate Resilience and Green Growth DPL","p2a_updated_date":"2024-03-31 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-03-22T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181306","status":"Active"},"P504499":{"id":"P504499","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2)","p2a_updated_date":"2024-03-28 00:00:00.0","totalcommamt":"170,000,000","boardapprovaldate":"2024-03-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504499","status":"Active"},"P180722":{"id":"P180722","countryname":["United Republic of Tanzania"],"lendinginstr":"Program-for-Results Financing","project_name":"Public Finance Management and Procurement Systems for Service Delivery Program","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-03-21T00:00:00Z","closingdate":"3/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180722","status":"Active"},"P179558":{"id":"P179558","countryname":["Islamic Republic of Mauritania"],"lendinginstr":"Investment Project Financing","project_name":"Mauritania Health System Support Project","p2a_updated_date":"2024-03-25 00:00:00.0","totalcommamt":"52,300,000","boardapprovaldate":"2024-03-21T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179558","status":"Active"},"P179109":{"id":"P179109","countryname":["Union of the Comoros"],"lendinginstr":"Investment Project Financing","project_name":"Comoros Interisland Connectivity Project SOP2","p2a_updated_date":"2024-03-22 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2024-03-20T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179109","status":"Active"},"P179944":{"id":"P179944","countryname":["Republic of Kosovo"],"lendinginstr":"Development Policy Lending","project_name":"Kosovo Fiscal Effectiveness, Competitiveness and Green Growth DPF","p2a_updated_date":"2024-03-20 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-03-18T00:00:00Z","closingdate":"9/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179944","status":"Active","project_abstract":{"cdata!":"The development objective of the First Fiscal Effectiveness, Competitiveness, and Green Growth Development Policy Financing for Kosovo is to enhance the effectiveness of fiscal policy, strengthen the investment climate, and lay the foundations for greener growth. The operation supports the Government’s efforts to tackle longstanding structural bottlenecks that impede higher, more inclusive and sustainable growth in Kosovo. The operation is organized around three interrelated pillars. First pillar, the operation aims to improve fiscal policy effectiveness with a view to increasing returns and equity of fiscal policy in the medium term. Second pillar supports reforms to enable private sector development. Third pillar supports reforms that promote greener and sustainable growth while supporting the poor."}},"P181396":{"id":"P181396","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to Road Connectivity Improvement Project","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"35,000,000","boardapprovaldate":"2024-03-15T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181396","status":"Active"},"P181612":{"id":"P181612","countryname":["Republic of Djibouti"],"lendinginstr":"Investment Project Financing","project_name":"AF Economic Management and Statistics Development for Policy Making","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2024-03-15T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181612","status":"Active"},"P177474":{"id":"P177474","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Piauí Pillars of Growth and Social Inclusion Project 2","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","closingdate":"7/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177474","status":"Active"},"P181565":{"id":"P181565","countryname":["Republic of Tunisia"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing to Tunisia Emergency Food Security Response Project","p2a_updated_date":"2024-03-15 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181565","status":"Active"},"P178303":{"id":"P178303","countryname":["Republic of Kazakhstan"],"lendinginstr":"Development Policy Lending","project_name":"Inclusive and Sustainable Economic Growth","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"600,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178303","status":"Active","project_abstract":{"cdata!":"The development objective of the Inclusive and Sustainable Economic Growth Development Policy Operation for Kazakhstan is to support Kazakhstan’s transition towards an economy that is greener, has more competitive markets, and greater inclusivity through implementing reforms organized in three pillars. Pillar 1 focuses on operationalizing key recommendations from the Country Climate and Development Report (CCDR) to support renewable energy scale-up, reform of tariffs in both electricity and heating to move towards full cost recovery, and greater energy efficiency. Pillar 2 supports the development of more competitive markets in the digital and financial sectors as well as transparent procurement practices. Pillar 3 focuses on inclusion through protecting the poor and promoting regional development and agglomeration."}},"P178582":{"id":"P178582","countryname":["Jamaica"],"lendinginstr":"Investment Project Financing","project_name":"JAMAICA: SOCIAL PROTECTION FOR INCREASED RESILIENCE AND OPPORTUNITY (SPIRO)","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","closingdate":"1/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178582","status":"Active"},"P179380":{"id":"P179380","countryname":["Republic of Zambia"],"lendinginstr":"Program-for-Results Financing","project_name":"National Energy Advancement and Transformation Program","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","closingdate":"12/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179380","status":"Active"},"P167900":{"id":"P167900","countryname":["Republic of Tunisia"],"lendinginstr":"Investment Project Financing","project_name":"Tunisia Economic Development Corridor Project","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"220,000,000","boardapprovaldate":"2024-03-14T00:00:00Z","closingdate":"5/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P167900","status":"Active"},"P179698":{"id":"P179698","countryname":["Republic of Kenya"],"lendinginstr":"Investment Project Financing","project_name":"Building Resilient and Responsive Health Systems","p2a_updated_date":"2024-03-15 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-03-13T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179698","status":"Active","project_abstract":{"cdata!":"The objective of the Building Resilient and Responsive Health Systems Project for Kenya is to improve utilization and quality of primary healthcare services and strengthen institutional capacity for service delivery. There are three components to the project, the first component being strengthening institutional capacity for health service delivery towards achieving UHC. Component 1 will focus on: (a) strengthening the institutional capacity of KEMSA and availability of HPTs; (b) supporting health financing reforms; and (c) improving availability and use of quality data for decision making. The second component is the improving utilization of quality health services at primary care level. This component includes three subcomponents: improving availability of essential HPTs and delivery of key quality services at the primary care level, improving delivery of quality health services in selected counties, and : Improving access to and utilization of quality health services in refugee camps and host communities in Garissa and Turkana Counties. Finally, the third component is the project management and evaluation. This component will support project management activities at national and county level. Key areas of support will include (1) providing operational costs and logistical services for day-to-day management of the project; (2) project monitoring and evaluation activities; (3) environmental and social risk management; (4) stakeholder engagement; (5) fiduciary management; (6) contracting of staff on a need basis; (7) technical assistance and county peer-to-peer learning among others; and (8) development of a climate emergency plan at the national level, which will inform county level actions to reduce the risk of climate change on health service delivery activities. Counties will be encouraged to include relevant climate mitigation actions in their AWPs."}},"P180605":{"id":"P180605","countryname":["Republic of Croatia"],"lendinginstr":"Investment Project Financing","project_name":"Integrated Land Administration and Justice Services Project","p2a_updated_date":"2024-03-15 00:00:00.0","totalcommamt":"121,800,000","boardapprovaldate":"2024-03-13T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180605","status":"Active","project_abstract":{"cdata!":"The objective of the Integrated Land Administration and Justice Services Project for Croatia is to enhance digital services and functional integration of land administration and court institutions. There are five components to the project, the first component being integrated digital land registry and court services. This component will finance activities that support the digitization and integration of land registry court data and services. It will continue the digitization of paper land registry records to making them more resilient to disaster and more easily shareable through the JIS and other online systems. The second component is the integrated digital services of state registers and geospatial data. This component will support enhanced geospatial data. The infrastructure cadaster system needs to be updated with data from infrastructure geodetic reports (elaborates) from 13 regional COs (from 13 counties). The third component is the enhanced digital integration of land register and cadaster. Under third component, enhancements will be made to the JIS and One-Stop-Shop (OSS), such as: (i) improving data quality and maintenance; (ii) recording of real property prices; (iii) simplifying online access to the land registry; (iv) upgrading of mobile apps (My Properties); (v) simplifying the process of recording construction rights; (vi) further digitization of cadaster processes; and (vii) extension of JIS access to other relevant stakeholders. The fourth component is the integrated court, LRO and CO infrastructure. This component will provide rehabilitation of court, registry, and cadaster infrastructure to international and EU standards to support improved service delivery and establishment of a new structure for addressing appeals of land disputes. Finally, the fifth component is the institutional capacity building, policy analysis, and project management."}},"P178049":{"id":"P178049","countryname":["Republic of Costa Rica"],"lendinginstr":"Investment Project Financing","project_name":"Costa Rica Climate Resilient Recovery and Territorial Development Project","p2a_updated_date":"2024-03-11 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2024-03-08T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178049","status":"Active"},"P181150":{"id":"P181150","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Impacts of CGIAR Climate Research for Africa Additional Financing","p2a_updated_date":"2024-03-11 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-03-08T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181150","status":"Active"},"P178813":{"id":"P178813","countryname":["United Republic of Tanzania"],"lendinginstr":"Investment Project Financing","project_name":"Project for Advancing Gender Equality in Tanzania (PAMOJA)","p2a_updated_date":"2024-03-07 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-03-05T00:00:00Z","closingdate":"2/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178813","status":"Active"},"P180306":{"id":"P180306","countryname":["Republic of Moldova"],"lendinginstr":"Investment Project Financing","project_name":"Modernization and Improvement of Rehabilitation Services Project","p2a_updated_date":"2024-03-07 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-03-05T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180306","status":"Active","project_abstract":{"cdata!":"The development objective of the Modernization and Improvement of Rehabilitation Services Project for Moldova is to: (i) strengthen noncommunicable disease care by improving prevention and rehabilitation services, with a focus on stroke and heart attacks, at all levels of the health system, and (ii) in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of five components. The first component, integrated care at the hospital level for noncommunicable disease (NCD) patients will focus on patients facing catastrophic health events, primarily strokes and heart attacks. The second component, integrated prevention and rehabilitation services at the primary care and population-level will support services to prevent NCDs through primary care and population-level interventions. It consists of following sub-components: (i) primary care and population-level interventions for NCD prevention and management; and (ii) preventive and supportive rehabilitation services. The third component, pandemic preparedness finances activities relating to the refurbishment of the National Agency for Public Health (NAPH) infrastructure and building additional storage facilities, as well as refurbishing the public health laboratory network infrastructure and endowing it with the necessary equipment to ensure early warning and surveillance functions. The fourth component, project management will support for project management, coordination, and monitoring and evaluation (M and E) activities, including third-party monitoring. The fifth component, contingent emergency response (CERC) objective is to improve Moldova’s capacity to respond to natural and man-made disasters."}},"P178581":{"id":"P178581","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Assam Resilient Rural Bridges Program","p2a_updated_date":"2024-03-04 00:00:00.0","totalcommamt":"452,000,000","boardapprovaldate":"2024-03-01T00:00:00Z","closingdate":"6/28/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178581","status":"Active","project_abstract":{"cdata!":"The development objective of the Assam Resilient Rural Bridges Program for India is to build green, inclusive, and resilient connectivity in rural Assam and strengthen the Assam Public Works Roads Department’s (APWRD) roads and bridges management capability. The Program interventions will support resilience and institutional building initiatives, including: (i) strengthening environment and social (E and S) management capability; (ii) strengthening APWRD’s financial management (FM) and procurement capability; (iii) strengthening the capacity for managing roads and bridges; and (iv) enhancing the resilience of bridges. In addition, the Program supports EV policy updating and establishing green rural transport and logistics hubs. The physical interventions to be implemented under the Program will include rural bridges: (i) maintenance; (ii) widening; and (iii) replacement and construction of temporary, distressed, collapsed and washed out and new bridges. The key results areas (RA) are: RA 1: strengthening management capability for roads and bridges; RA 2: enhancing the resilience of bridges and rural communities; and RA 3: inclusive and resilient connectivity to rural communities, and relief during disaster events."}},"P179913":{"id":"P179913","countryname":["Republic of Mozambique"],"lendinginstr":"Program-for-Results Financing","project_name":"District and Community Health Services Revitalization Operation","p2a_updated_date":"2024-03-04 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-02-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179913","status":"Active"},"P176498":{"id":"P176498","countryname":["Nepal"],"lendinginstr":"Development Policy Lending","project_name":"Second Fiscal Policy for Growth, Recovery and Resilience Development Policy Credit","p2a_updated_date":"2024-03-01 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-02-29T00:00:00Z","closingdate":"2/28/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176498","status":"Active","project_abstract":{"cdata!":"The development objectives of the Second Fiscal Policy for Growth, Recovery, and Resilience for Nepal are to: (i) strengthen the regulatory and institutional framework to build back better and greener, and (ii) enhance systems and regulations to protect the most vulnerable and support sustainable business growth. This operation supports fiscal and growth focused reforms that underpin the Government of Nepal (GoN’s) transition to green, resilient, and inclusive development (GRID). Green growth is supported through environmental fiscal policy reforms and support to public investment management. Reforms targeted at strengthening fiscal and debt sustainability as well as the climate resilience of public infrastructure and disaster risk management will enhance overall resilience. Reforms to education, health, and social protection spending will support inclusive growth, while actions aimed at attracting foreign direct investment (FDI) will strengthen aggregate growth."}},"P179263":{"id":"P179263","countryname":["Islamic Republic of Mauritania"],"lendinginstr":"Development Policy Lending","project_name":"Mauritania Fiscal Management and Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2024-03-21 00:00:00.0","totalcommamt":"48,000,000","boardapprovaldate":"2024-02-29T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179263","status":"Active","project_abstract":{"cdata!":"The development objective of the Fiscal Management and Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option for Mauritania is to strengthen the foundations for: (i) sound fiscal and debt management; and (ii) a competitive and climate-resilient economy. The operation is designed to support reforms in the areas of fiscal and debt management and strengthen economic competitiveness and resilience to climate change and disaster risks."}},"P171836":{"id":"P171836","countryname":["Nepal"],"lendinginstr":"Investment Project Financing","project_name":"Provincial and Local Roads Improvement Program - Phase 1","p2a_updated_date":"2024-03-01 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2024-02-29T00:00:00Z","closingdate":"7/15/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P171836","status":"Active","project_abstract":{"cdata!":"The development objective of the First Phase of the Provincial and Local Roads Improvement Program Project for Nepal is to enhance inclusive connectivity, efficiency, resilience, and safety of the selected provincial and local road network and strengthen the capacity of the federal government, participating provinces, and participating local levels. The project comprises of five components. The first component, enhancing efficiency and resilience of provincial roads and bridges will support improving efficiency of service delivery of the existing provincial roads through climate resilient and safe road network. The second component, enhancing all-weather connectivity and access to municipalities will support the objective of reducing regional imbalances and building resilience of unconnected communities by providing equitable all weather and safe access to services and markets. The third component, strengthening governance system and capacity development will support laying a strong sector foundation for provincial and local roads by improving the governance systems and strengthening the capacity of the participating governments. The fourth component, road safety management will include assessment of existing road safety measures and management capacity, including engineering, enforcement, education and awareness and emergency response on provincial and local roads, and implementation of road safety measures based on the findings of such assessment and study. The fifth component, contingent emergency response (CERC) will provide immediate response to an eligible crisis or emergency, as needed."}},"P177407":{"id":"P177407","countryname":["Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"RESILAND CA+ Program: Kyrgyz Republic Resilient Landscape Restoration Project","p2a_updated_date":"2024-02-29 00:00:00.0","totalcommamt":"45,000,000","boardapprovaldate":"2024-02-27T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177407","status":"Active","project_abstract":{"cdata!":"The development objectives of the Resiland CA+ Program : Kyrgyz Republic Resilient Landscape Restoration Project for Kyrgyz Republic are: (i) to increase the area under sustainable landscape management in selected locations in the Kyrgyz Republic; and (ii) to promote Kyrgyz Republic’s collaboration with other Central Asian countries on transboundary landscape restoration. The project comprises of three components. The first component, strengthening institutions and regional collaboration has a national and regional focus, financing activities that enhance government capacity for forecasting, monitoring, and preparedness for reducing and mitigating impacts of natural and climate-induced disasters, thereby enhancing resilience of landscapes and their restoration and activities that improve regional awareness, capacity, and cooperation on transboundary resilience of landscapes. It consists of following sub-components: (i) strengthening institutions and climate-induced hazard monitoring capacity; (ii) information and communication technology (ICT) for disaster risk management in degraded landscapes; and (iii) strengthening regional collaboration. The second component, enhancing resilient landscapes and livelihoods will finance upstream and downstream nature-based, grey, green, and hybrid solutions for reducing the impact of mudflows on communities, landscapes, and infrastructure in the targeted transboundary areas. It consists of following sub-components: (i) landscape restoration through climate-resilient green solutions; and (ii) landscape restoration through climate-resilient nature-based and grey solutions. The third component, project management and coordination will finance the incremental operating costs and other eligible expenses associated with project implementation."}},"P179233":{"id":"P179233","countryname":["Republic of The Gambia"],"lendinginstr":"Investment Project Financing","project_name":"The Gambia Resilience, Inclusion, Skills, and Equity Project","p2a_updated_date":"2024-02-28 00:00:00.0","totalcommamt":"80,450,000","boardapprovaldate":"2024-02-23T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179233","status":"Active","project_abstract":{"cdata!":"The development objective of the Resilience, Inclusion, Skills, and Equity Project for The Gambia is to increase: (i) foundational learning of early‐grade students; (ii) access to job‐relevant training for youth; and (iii) income‐generating opportunities, including for the poor and vulnerable, in The Gambia. The project comprises of five components. The first component, improve foundational learning outcomes will expand and build on the successes of the recent education sector support program (ESSP). It consists of following sub-components: (i) utilize structured pedagogy to improve foundational learning; (ii) scale up programs to expand access to formal education system; and (iii) scale up efforts to strengthen systems for basic education system. The second component, increase access to labor‐market‐relevant technical and vocational education and training (TVET) programs builds on the successes of recent activities. It consists of following sub-components: (i) design competitive skills, innovation, and entrepreneurship fund for rapid response and innovation in the TVET sector; (ii) establish TVET centers of excellence focused on priority economic sectors and trades; and (iii) system strengthening in priority areas. The third component, expand and enhance social safety nets will promote linkages to social services including health insurance and ensuring that beneficiaries send their children to school and participate in school feeding programming, to develop their human capital outcomes. It consists of following sub-components: (i) establish a productive economic inclusion program to skill poor populations; (ii) support Nafa cash transfers program; and (iii) strengthen social protection sector coordination and scale‐up of social protection tools to improve service delivery and response to shocks. The fourth component, support project management and capacity building consist of following sub-components: (i) project management, communications, and capacity building; and (ii) interoperability of data systems. The fifth component, contingent emergency response component (CERC) will only be activated and funded in accordance with investment project financing (IPF) World Bank Policy for situations of urgent need of assistance."}},"P179204":{"id":"P179204","countryname":["Republic of Kazakhstan"],"lendinginstr":"Investment Project Financing","project_name":"Kazakhstan Digital Acceleration for an Inclusive Economy (DARE) Project","p2a_updated_date":"2024-02-28 00:00:00.0","totalcommamt":"92,430,000","boardapprovaldate":"2024-02-22T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179204","status":"Active","project_abstract":{"cdata!":"The development objective of the Digital Acceleration for an Inclusive Economy (DARE) Project for Kazakhstan is to provide access to high-quality and climate resilient broadband infrastructure in selected unserved and underserved areas of Kazakhstan. The project comprises of two components. The first component, resilient digital infrastructure aims to finance the rollout of high-quality climate-resilient and low carbon digital infrastructure in villages covered under the Government of Kazakhstan (GoKZ) 250+ program and will first cater to four unserved and underserved regions of Kazakhstan (Akmola, Turkestanskaya, West Kazakhstan, and East Kazakhstan), connecting households, public institutions, businesses to broadband. The second component, project management and implementation support will support the project management and implementation of project-associated activities, including procurement, financial management (FM), monitoring and evaluation (M and E), project communications, as well as environmental and social safeguards and citizen engagement."}},"P181436":{"id":"P181436","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Turkiye Green Export Project","p2a_updated_date":"2024-03-01 00:00:00.0","totalcommamt":"654,900,000","boardapprovaldate":"2024-02-22T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181436","status":"Active","project_abstract":{"cdata!":"The development objective of the Green Export Project for Türkiye is to support Turkish exporters in their green transition and to expand green exports through longer-term financing. The project includes one component which will utilize the commercial financing raised by Eximbank with the support of the International Bank for Reconstruction and Development (IBRD) guarantee to directly extend sub-loans to eligible exporters exclusively for greening purposes."}},"P178957":{"id":"P178957","countryname":["Lao People's Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Lao Health and Nutrition Services Access Project II","p2a_updated_date":"2024-03-13 00:00:00.0","totalcommamt":"39,000,000","boardapprovaldate":"2024-02-21T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178957","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Health and Nutrition Services Access Project for Lao People’s Democratic Republic is to improve equitable access, utilization, and quality of health and nutrition services in target areas and provide immediate response in case of an eligible crisis or emergency. The project comprises of four components. The first component, financing primary health care (PHC) services using national health insurance system consists of following sub-components: (i) financing quality- and performance-linked payments to health centers; (ii) implementing quality and performance scorecard (QPS) assessments using the revised QPS tool and vignettes; and (iii) capacity building for QPS implementation and verification. The second component, integrated PHC service delivery contributes to achieving the project development objective (PDO) through strengthening the PHC system so that it can deliver integrated services and reduce equity gaps in access to quality PHC services. It consists of following sub-components: (i) strengthening the PHC system for delivering integrated services; and (ii) deliver integrated services. The third component, adaptive learning and project management contributes to achieving the PDO through financing project management, external verification for performance-based condition (PBC) achievement, research, monitoring, evaluation, and learning (MEAL) activities, providing technical assistance, transformative gender and equity actions, and institutional capacity building for environmental health and safety. The fourth component, contingent emergency response with a provisional zero allocation, is to allow for the reallocation of financing in accordance with the immediate response mechanism and to provide an immediate response to an eligible crisis or emergency as needed, including in areas strongly affected by climate change effects."}},"P504704":{"id":"P504704","countryname":["West Bank and Gaza"],"lendinginstr":"Investment Project Financing","project_name":"Palestinian Emergency Financing Facility","p2a_updated_date":"2024-02-21 00:00:00.0","totalcommamt":"60,000,000","boardapprovaldate":"2024-02-20T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P504704","status":"Active"},"P178861":{"id":"P178861","countryname":["Plurinational State of Bolivia"],"lendinginstr":"Investment Project Financing","project_name":"Bolivia Resilient Water Management for Community and Household Irrigation Project","p2a_updated_date":"2024-02-22 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-02-20T00:00:00Z","closingdate":"1/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178861","status":"Active","project_abstract":{"cdata!":"The development objective of the Resilient Water Management for Community and Household Irrigation Project for Bolivia is to improve integrated water resources management in selected basins and increase the resilience to climate variability of vulnerable rural families in selected micro basins. The project comprises of four components. The first component, water resources planning, and pre-investment studies will fund studies that seek to address, respond to, and build capacity on present and anticipated impacts of climate change on water resources. The second component, climate resilience infrastructure investments will fund works and the supervision of investments related to water conservation, soil and land management, irrigation, and risk management to adapt to the impacts of and to build resilience against climate change exacerbated floods and droughts. It consists of following sub-components: (i) investments in integrated water basin management; (ii) minor; and (iii) risk management infrastructure to improve resilience. The third component, capacity building for water governance and enhanced productivity will fund technical assistance (TA) and capacity building activities to enhance water governance at the regional and basin levels including climate change education and awareness. The fourth component, project management will fund activities to support Project administration and management, including procurement, financial, environmental, social, and technical management as well and monitoring and evaluation (M and E) (including, inter alia, operating costs and project external audits)."}},"P180801":{"id":"P180801","countryname":["Republic of Zambia"],"lendinginstr":"Investment Project Financing","project_name":"Transport Corridors for Economic Resilience (TRACER)","p2a_updated_date":"2024-03-18 00:00:00.0","totalcommamt":"270,000,000","boardapprovaldate":"2024-02-20T00:00:00Z","closingdate":"2/27/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180801","status":"Active","project_abstract":{"cdata!":"The development objective of the Transport Corridors for Economic Resilience Project for Zambia is to improve efficiency, connectivity and climate resilience of key regional transport and trade corridors in Eastern and Southern Africa. The project comprises of four components. The first component, resilient transport and trade facilitation systems along the Dar es Salaam corridor and preparatory studies for ensuing corridors under the Series of Projects (SOP) consists of following sub-components: (i) development of climate resilient road sections along the Dar es Salaam corridor; (ii) development of the Nakonde one stop border post (OSBP); (iii) development of the safety, mobility, automated, real-time traffic management (SMART) corridor concept on the Lusaka-Nakonde section of the Dar es Salaam corridor; and (iv) preparatory studies for road sections along key regional corridors. The second component, corridor-oriented development consists of following sub-components: (i) assessment of socio-economic development opportunities along the Dar es Salaam corridor; and (ii) development of identified micro, small, and medium enterprise (MSME) businesses for regional exports. The third component, sectoral capacity development and project management consists of following sub-components: (i) support to regional corridors management; (ii) development of a railway strategy for Zambia including an action plan for enhancing the institutional set-up, operational efficiency, and financial sustainability of Zambia Railways Limited (ZRL); (iii) studies and sectoral capacity building activities; and (iv) project management for the entire project, monitoring and evaluation. The fourth component, contingent emergency response component (CERC) is designed to provide swift response in the event of an eligible crisis or emergency, by enabling Government of the Republic of Zambia (GRZ) to request the World Bank to reallocate project funds to support emergency response and reconstruction, in accordance with an applicable CERC Manual that will need to be prepared."}},"P181155":{"id":"P181155","countryname":["Lebanese Republic"],"lendinginstr":"Investment Project Financing","project_name":"Fiscal Management Project","p2a_updated_date":"2024-02-19 00:00:00.0","totalcommamt":"28,500,000","boardapprovaldate":"2024-02-14T00:00:00Z","closingdate":"3/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181155","status":"Active"},"P179449":{"id":"P179449","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Senegal River Valley Development and Resilience Project","p2a_updated_date":"2024-02-15 00:00:00.0","totalcommamt":"195,000,000","boardapprovaldate":"2024-02-13T00:00:00Z","closingdate":"2/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179449","status":"Active"},"P180534":{"id":"P180534","countryname":["Republic of Colombia"],"lendinginstr":"Program-for-Results Financing","project_name":"Program for Improved Access to Effective Health Services for the Vulnerable and Enhanced Health System Resilience","p2a_updated_date":"2024-02-15 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-02-13T00:00:00Z","closingdate":"6/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180534","status":"Active","project_abstract":{"cdata!":"The development objective of the Program for Improved Access to Effective Health Services for the Vulnerable and Enhanced Health System Resilience for Colombia is to improve access to effective health services for the vulnerable population and enhance the resilience of the health system to climate change and public health threats. The Program-for-Results (PforR) aligns directly with the FY16-21 World Bank (WB) Country Partnership Framework (CPF) for Colombia, the Colombia Performance and Learning Review (PLR) and the most recent core diagnostic work that will inform the 2024-2027 CPF. The operation contributes to the current CPF Pillar 1, given its focus on achieving effective access to health services for the vulnerable. It also contributes to CPF Pillar 2: enhancing social inclusion and mobility through improved service delivery. The PforR instrument provides powerful incentives for the Ministry of Health and Social Protection (MSPS) to achieve development results included in the National Development Plan (PND). The PforR contributes to an operational and pragmatic definition of key results indicators for the sector, as well as the monitoring and evaluation of key policies proposed in the PND, helping the Government achieve increasingly complex and long-term outcomes."}},"P181374":{"id":"P181374","countryname":["Republic of Mozambique"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to the Maputo Urban Transformation Project","p2a_updated_date":"2024-02-09 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-02-07T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181374","status":"Active"},"P175723":{"id":"P175723","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Mato Grosso Sustainable Development of Family Farming","p2a_updated_date":"2024-02-07 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2024-02-05T00:00:00Z","closingdate":"5/15/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P175723","status":"Active","project_abstract":{"cdata!":"The development objective of the Mato Grosso Sustainable Development of Family Farming Project for Brazil is to improve the access to markets, climate resilience, and land and environmental management of selected family farmers in the State of Mato Grosso and in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, climate-smart economic inclusion will support the climate resilience of family farmers in Mato Grosso and improve their market linkages to sustain resilient production models over time. It consists of following sub-components: (i) pre-investments for the preparation of climate-smart agriculture (CSA) family farming business plans; and (ii) productive investments in CSA family farming business plans. The second component, improved land and environmental management will increase the generation of environmental benefits, including for climate resilience and mitigation, of family farming in Mato Grosso. It consists of following sub-components: (i) support for land and environmental regularization; and (ii) prevention and control of forest fire and deforestation in family farming areas. The third component, project management and coordination objectives are to provide the Project Management Unit (PMU) with the conditions and information necessary for the effective management and coordination of the project. The fourth component, contingency emergency response component (CERC) will provide for an immediate response to an eligible crisis or emergency, as needed."}},"P181421":{"id":"P181421","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Sustainable Rural Water Supply and Sanitation Development Project - Second Additional Financing","p2a_updated_date":"2024-02-01 00:00:00.0","totalcommamt":"7,640,000","boardapprovaldate":"2024-01-31T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181421","status":"Active"},"P178592":{"id":"P178592","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Higher Education Quality and Innovation Project","p2a_updated_date":"2024-02-01 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-01-31T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178592","status":"Active"},"P177022":{"id":"P177022","countryname":["Burkina Faso"],"lendinginstr":"Investment Project Financing","project_name":"Burkina Faso Digital Acceleration Project","p2a_updated_date":"2024-01-24 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2024-01-23T00:00:00Z","closingdate":"11/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177022","status":"Active"},"P174171":{"id":"P174171","countryname":["Kingdom of Lesotho"],"lendinginstr":"Investment Project Financing","project_name":"Lesotho Public Sector Foundations for Service Delivery Project","p2a_updated_date":"2024-01-26 00:00:00.0","totalcommamt":"12,000,000","boardapprovaldate":"2024-01-23T00:00:00Z","closingdate":"3/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174171","status":"Active"},"P180718":{"id":"P180718","countryname":["Republic of Ghana"],"lendinginstr":"Development Policy Lending","project_name":"First Resilient Recovery Development Policy Financing","p2a_updated_date":"2024-01-24 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2024-01-23T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180718","status":"Active","project_abstract":{"cdata!":"The development objective of the First Resilient Recovery Development Policy Financing for Ghana is to restore fiscal sustainability; support financial sector stability and private sector development; improve energy sector financial discipline; and strengthen social and climate resilience. Restoring macroeconomic stability is a precondition for Ghana to resume private sector-led growth and to reign-in inflation, which disproportionately affects the most vulnerable. Smart fiscal adjustment is required to rebuild the buffers needed to sustainably finance investments in physical and human infrastructure. Finally, the current crisis is an occasion to modernize Ghana’s social protection architecture and build the foundations for greener and more climate-resilient growth."}},"P179845":{"id":"P179845","countryname":["Commonwealth of Dominica"],"lendinginstr":"Investment Project Financing","project_name":"Dominica Geothermal Risk Mitigation II Project","p2a_updated_date":"2024-01-26 00:00:00.0","totalcommamt":"38,500,000","boardapprovaldate":"2024-01-23T00:00:00Z","closingdate":"2/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179845","status":"Active"},"P179813":{"id":"P179813","countryname":["Kingdom of Tonga"],"lendinginstr":"Development Policy Lending","project_name":"Tonga First Fiscal, Disaster, and Climate Resilience Development Policy Operation with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2024-01-22 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-01-19T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179813","status":"Active"},"P181422":{"id":"P181422","countryname":["Macedonia, Republic of North"],"lendinginstr":"Investment Project Financing","project_name":"Road Upgrading and Development Project","p2a_updated_date":"2024-01-19 00:00:00.0","totalcommamt":"33,800,000","boardapprovaldate":"2024-01-18T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181422","status":"Active"},"P166693":{"id":"P166693","countryname":["Republic of Indonesia"],"lendinginstr":"Investment Project Financing","project_name":"Labor Market Information and Skills System Transformation for Labor Market Flexibility","p2a_updated_date":"2024-01-19 00:00:00.0","totalcommamt":"144,230,000","boardapprovaldate":"2024-01-18T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P166693","status":"Active"},"P180244":{"id":"P180244","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"WEST AFRICA FOOD SYSTEM RESILIENCE PROGRAM (FSRP) PHASE 3","p2a_updated_date":"2024-01-21 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2024-01-18T00:00:00Z","closingdate":"3/29/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180244","status":"Active"},"P180350":{"id":"P180350","countryname":["Macedonia, Republic of North"],"lendinginstr":"Investment Project Financing","project_name":"Second Social Services Improvement Project","p2a_updated_date":"2024-01-18 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2024-01-16T00:00:00Z","closingdate":"5/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180350","status":"Active"},"P173716":{"id":"P173716","countryname":["Socialist Republic of Vietnam"],"lendinginstr":"Investment Project Financing","project_name":"Binh Duong Province's Water Environment Improvement Project","p2a_updated_date":"2024-01-15 00:00:00.0","totalcommamt":"230,760,000","boardapprovaldate":"2024-01-13T00:00:00Z","closingdate":"10/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P173716","status":"Active","project_abstract":{"cdata!":"The development objective of the Binh Duong Province’s Water Environment Improvement Project for Viet Nam is to reduce environmental pollution caused by urban wastewater in order to protect water quality and increase people’s access to improved wastewater services in the project areas of Binh Duong Province. This project has two components. 1) The first component, Wastewater infrastructure development, has the following sub-components:(i) Tan Uyen City; (ii) Thuan An City; and (iii) Di An City. 2) The second component, Institutional strengthening and implementation support, has the following sub-components: (i) Preparation of an integrated wastewater management orientation in Binh Duong Province; (ii) Project implementation support; and (iii) Compensation and site clearance."}},"P181416":{"id":"P181416","countryname":["Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"Digital CASA  - Kyrgyz Republic Additional Financing","p2a_updated_date":"2024-01-15 00:00:00.0","totalcommamt":"7,000,000","boardapprovaldate":"2024-01-12T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181416","status":"Active"},"P178210":{"id":"P178210","countryname":["Republic of Seychelles"],"lendinginstr":"Development Policy Lending","project_name":"SEYCHELLES THIRD FISCAL SUSTAINABILITY AND CLIMATE RESILIENCE DEVELOPMENT POLICY FINANCING","p2a_updated_date":"2024-01-12 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2024-01-11T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178210","status":"Active"},"P179539":{"id":"P179539","countryname":["St. Lucia"],"lendinginstr":"Development Policy Lending","project_name":"Saint Lucia Sustainable Recovery Development Policy Credit","p2a_updated_date":"2024-01-15 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2024-01-11T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179539","status":"Active","project_abstract":{"cdata!":"The development objectives of the Sustainable Recovery Development Policy Credit for Saint Lucia are to: (i) strengthen fiscal revenues and transparency; and (ii) promote green and resilient private sector growth. The operation consists of two complementary pillars: Pillar 1 supports strengthening fiscal revenues and improving transparency by introducing a health and citizen security levy (HCSL) as well as increases to the excise tax on cigarettes. Pillar 2 focuses on promoting green and resilient private sector growth, by supporting climate change mitigation and adaptation as well as reforms to improve the business environment."}},"P179210":{"id":"P179210","countryname":["Caribbean"],"lendinginstr":"Investment Project Financing","project_name":"OECS- Skills and Innovation Project","p2a_updated_date":"2024-01-15 00:00:00.0","totalcommamt":"36,000,000","boardapprovaldate":"2024-01-11T00:00:00Z","closingdate":"1/8/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179210","status":"Active","project_abstract":{"cdata!":"The development objective of the Skills and Innovation Project for Caribbean is to: (i) enhance youth transversal and advanced technical skills, strengthen regional collaboration in post-secondary education, and foster collaborative innovation; and (ii) in case of an eligible crisis or emergency, respond promptly and effectively to it. The project comprises of four components. The first component, fostering regional collaboration for skills and innovation in the post-secondary space will support the development of an overarching regional strategic framework for post-secondary education and of mechanisms to enhance collaboration among Organization of Eastern Caribbean States (OECS) Member States on post-secondary education, the improvement of post-secondary data at the regional level, and the development of a regional innovation ecosystem with strong participation of post-secondary institutions. It consists of following sub-components: (i) developing regional collaboration in post-secondary education; and (ii) fostering regional innovation ecosystems with the participation of post-secondary institutions. The second component, strengthening post-secondary institutions and collaborative innovation will provide direct support to National Colleges and other selected post-secondary institutions in participating countries to implement regional enhancement plans (REPs), develop new or enhance existing programs for priority skills, and support collaborative innovation projects, with the objective of promoting improved learning environments and fostering better skills and innovation in the OECS to respond to increasing private sector demand for skills. It consists of following sub-components: (i) developing and implementing regional enhancement plans; (ii) developing programs to foster priority skills; and (iii) enabling the innovation ecosystem and sponsoring collaborative innovation. The third component, project management and technical assistance will provide technical assistance to support the implementation of Project activities and finance the establishment and functioning of three Project Implementation Unit (PIUs). The fourth component, contingent emergency response component (CERC) will facilitate the use of critical resources in the event of an eligible national emergency. It will have an initial zero budget allocation but would allow for rapid reallocation of project funds in the event of an eligible natural disaster or crisis that has caused or is likely to imminently cause major adverse economic and or social impacts."}},"P502492":{"id":"P502492","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Access to Finance to Import Strategic Commodities Project","p2a_updated_date":"2024-01-11 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2024-01-10T00:00:00Z","closingdate":"1/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P502492","status":"Active"},"P181410":{"id":"P181410","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the BI-Jiji and Mulembwe Hydropower","p2a_updated_date":"2024-01-11 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2024-01-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181410","status":"Active"},"P180987":{"id":"P180987","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to the Burundi Digital Foundations Project - Modernization of Public Financial Management","p2a_updated_date":"2024-01-11 00:00:00.0","totalcommamt":"42,000,000","boardapprovaldate":"2024-01-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180987","status":"Active"},"P181434":{"id":"P181434","countryname":["Republic of Uzbekistan"],"lendinginstr":"Investment Project Financing","project_name":"Uzbekistan Solar and Renewable Energy Storage Project","p2a_updated_date":"2024-01-10 00:00:00.0","totalcommamt":"12,000,000","boardapprovaldate":"2024-01-03T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181434","status":"Active","project_abstract":{"cdata!":"The development objective of the Solar and Renewable Energy Storage (USRES) Project for Uzbekistan is to increase private sector led renewable energy supply in Uzbekistan. The project comprises of one component, construction, and operation of a 250 MW solar power plant and 63 MW/126 MWh of battery energy storage system (BESS) by Abu Dhabi Future Energy Company PJSC - Masdar at Bukhara site and power purchase by the state-owned off-taker (NEGU) supported through International Bank for Reconstruction and Development (IBRD) project-based payment guarantee."}},"P180465":{"id":"P180465","countryname":["Republic of Kenya"],"lendinginstr":"Investment Project Financing","project_name":"Kenya Green and Resilient Expansion of Energy (GREEN) Program Phase 2 Project","p2a_updated_date":"2023-12-28 00:00:00.0","totalcommamt":"153,500,000","boardapprovaldate":"2023-12-27T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180465","status":"Active","project_abstract":{"cdata!":"The objective of the Second Phase of Green and Resilient Expansion of Energy Program Project for Kenya is to increase the capacity of Kenya Power System for energy trade and renewable energy integration. There are four components to the project, the first component being installation of system stabilization equipment. This component will finance installation of STATCOMs to improve the fault levels, increase voltage stability, and allow for greater import of cheaper and renewable energy from Ethiopia. One of the STATCOMs will be installed at the existing Suswa substation where the 500 HVDC Ethiopia-Kenya transmission interconnector terminates while the second STATCOM will be installed at 220/132kV Rabai substation at the coast region of Kenya. The second component is the construction of a 400kV Substation at Kimuka. The Kimuka substation will enable export of power from Ethiopia to Tanzania through Kenya by allowing the Suswa-Isinya line to be operated at full design capacity. The third component is the battery energy storage systems. Implemented by KenGen, the component will support the installation of the first BESS of up to 200MWh for load shifting renewable energy sources (primarily geothermal) but also grid stability by providing system reserves (both fast and backup reserves). The charging will occur during the off-peak period (between 10pm and 5am), while the provision of backup reserves peaks during the morning and evening hours (at 4am and 6pm). Finally, the fourth component is the technical assistance, capacity building and project management. This component includes five subcomponents: The solar auctions preparatory studies, The transaction advisory for solar auction (including legal and procurement), sector technical assistance, capacity building and project management, technical assistance to KETRACO, and technical assistance to KenGen."}},"P179189":{"id":"P179189","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Tamil Nadu Climate Resilient Urban Development Program","p2a_updated_date":"2023-12-25 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-12-21T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179189","status":"Active"},"P181308":{"id":"P181308","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Regional Climate Resilience Program for Eastern and Southern Africa 2 Project (RCRP2)","p2a_updated_date":"2023-12-22 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2023-12-21T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181308","status":"Active","project_abstract":{"cdata!":"The objective of the Second Regional Climate Resilience Program for Eastern and Southern Africa Project is to improve resilience to water-related climate shocks in Malawi and in the Eastern and Southern Africa region, and in case of an eligible crisis or emergency, to respond promptly and effectively to it. There are five components to the project, the first component being risk management and climate financing. The objective of this component is to build regional and national institutional capacity in watershed and catchment management; and to strengthen cooperation on climate and related disasters risk management and climate financing. This component includes four subcomponents: consolidating and Implementing basin plans, emergency preparedness and response and early warning systems, strengthening Monitoring, Reporting, and Verification (MRV) capacity to facilitate access to climate finance, and capacity building to enhance hydromet systems and climate finance. The second component is the infrastructure investments and sustainable asset management for climate resilience. This component includes three subcomponents: basin-level infrastructure development, district-led resilience building, and capacity building to strengthen flood and drought risk vulnerability analysis and O&M of flood protective infrastructure. The third component is the adaptive climate services for resilient. This component includes three subcomponents: expanding social registry in urban areas, design and pilot urban climate smart public works program, and mainstreaming climate resilience in social protection and empowering communities. The fourth component is the project management. This component will finance project management activities, equipment and materials, and TA in Malawi (US15 million dollars) and AU (US1.5 million dollars) to ensure that the project is compliant with World Bank fiduciary and environment and social (E&S) risk management procedures and standards. Finally, the fifth component is the contingent emergency response component."}},"P181011":{"id":"P181011","countryname":["Republic of Zambia"],"lendinginstr":"Development Policy Lending","project_name":"Zambia Second Macroeconomic Stability, Growth and Competitiveness DPF","p2a_updated_date":"2023-12-25 00:00:00.0","totalcommamt":"125,000,000","boardapprovaldate":"2023-12-21T00:00:00Z","closingdate":"1/15/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181011","status":"Active"},"P180634":{"id":"P180634","countryname":["Republic of India"],"lendinginstr":"Program-for-Results Financing","project_name":"Sikkim: Integrated Service Provision and Innovation for Reviving Economies Operation","p2a_updated_date":"2023-12-25 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-12-21T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180634","status":"Active"},"P180298":{"id":"P180298","countryname":["United Republic of Tanzania"],"lendinginstr":"Investment Project Financing","project_name":"DAR ES SALAAM METROPOLITAN DEVELOPMENT PROJECT PHASE 2","p2a_updated_date":"2023-12-22 00:00:00.0","totalcommamt":"385,000,000","boardapprovaldate":"2023-12-20T00:00:00Z","closingdate":"4/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180298","status":"Active","project_abstract":{"cdata!":"The objective of the Second Phase of the Dar Es Salaam Metropolitan Development Project for Tanzania is to improve climate resilient urban infrastructure and services and strengthen institutional capacity in the Dar es Salaam Region. There are five components to the project, the first component being climate-smart priority infrastructure. This component includes four subcomponents: resilient transport infrastructure, resilient and green drainage systems, resilient parks, public spaces, riparian and coastal landscapes, and area-based urban development. The second component is the integrated solid waste management infrastructure and services. This component includes four subcomponents: waste disposal, waste transfer and transport, waste recycling and organic waste management, and establishment of Intermunicipal solid waste management institution. The third component is the strengthening urban institutions. This component will support improved urban services, municipal finances, urban planning and emergency planning and response. This component includes four subcomponents: capacity building for resilient urban services, implementation of Own Source Revenue (OSR) management system, capacity building for resilient urban planning, and capacity building for emergency planning and response. The fourth component is the project management. This component will finance the direct costs of management and operation of the project to ensure smooth delivery and compliance with World Bank policy and guidelines. Finally, the fifth component is the contingency emergency response."}},"P180504":{"id":"P180504","countryname":["United Republic of Tanzania"],"lendinginstr":"Development Policy Lending","project_name":"Tanzania Second Inclusive and Resilient Growth Development Policy Financing","p2a_updated_date":"2023-12-21 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2023-12-20T00:00:00Z","closingdate":"2/28/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180504","status":"Active"},"P179012":{"id":"P179012","countryname":["Republic of Kenya"],"lendinginstr":"Program-for-Results Financing","project_name":"Kenya Water, Sanitation, and Hygiene Program","p2a_updated_date":"2023-12-22 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2023-12-20T00:00:00Z","closingdate":"6/30/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179012","status":"Active"},"P181385":{"id":"P181385","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"South Sudan Health Sector Transformation Project (HSTP)","p2a_updated_date":"2023-12-22 00:00:00.0","totalcommamt":"117,000,000","boardapprovaldate":"2023-12-20T00:00:00Z","closingdate":"7/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181385","status":"Active","project_abstract":{"cdata!":"The development objective of the Health Sector Transformation Project for South Sudan is to expand access to a basic package of health and nutrition services, improve health sector stewardship, and strengthen the health system. The project comprises of four components. The first component, provision of basic health services nationwide will deliver basic health services nationwide, guided by the Ministry of Health (MoH’s) health sector strategic plan (HSSP) and building on the experiences obtained under the Coronavirus disease 2019 (COVID-19) Emergency Response and Health System Preparedness Project (CERHSPP) and the health pooled fund (HPF), with a focus on improving service availability including to refugees and host communities. It consists of following sub-components: (i) delivery of high impact basic health and nutrition services nationwide through health facilities; (ii) Boma health initiative; (iii) pharmaceutical and supply last mile delivery; and (iv) climate resilient health service delivery. The second component, health systems strengthening is aligned with the MoH’s HSSP and will undertake activities to strengthen South Sudan’s health system to facilitate health service access and capacity improvements, with an emphasis on developing the stewardship capacity of the MoH, State Ministry of Health (SMoHs), and CHDs. It consists of following sub-components: (i) health emergency preparedness and response, laboratory strengthening, and disease control; (ii) blood banking and transfusion; (iii) health service quality improvement; (iv) health management information systems; and (iv) health sector stewardship and financing. The third component, monitoring and evaluation (M and E) and project management will finance costs related to M and E and management of project activities. It consists of following sub-components: (i) third party monitoring; (ii) data analysis and visualization platform; (iii) contract and program management capacity development; and (iv) project management. The fourth component, contingent emergency response component (CERC) objective is to facilitate access to rapid financing by allowing for reallocation of uncommitted project funds in the event of an eligible emergency as defined in OP 8.00, such as a disease outbreak or health emergency with the potential to cause a major adverse economic and or social impact."}},"P172648":{"id":"P172648","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Development Policy Lending","project_name":"Second Resilient Institutions for Sustainable Economy","p2a_updated_date":"2023-12-20 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2023-12-19T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P172648","status":"Active","project_abstract":{"cdata!":"The development objectives of the Second Resilient Institutions for Sustainable Economy Development Policy Financing (DPF) for Pakistan are: (i) enhancing the policy and institutional framework to improve fiscal management, and (ii) improving the regulatory framework to foster growth and competitiveness. The operation was designed to take account of country-specific lessons from past operations. The design is informed by lessons from the 2018 Implementation Completion and Results Report (ICR) of the fiscally sustainable inclusive growth programmatic DPF series, the 2018 ICR of the competitiveness and growth DPF, and the 2020 Project Performance Assessment Report. Lessons have been incorporated into this series by: (i) focusing on institutional reform for better macro-fiscal management; (ii) including the provincial governments in critical reforms; (iii) complementing the operation with technical assistance project support; and (iv) seeking to calibrate the substance and pace of the reform program with the previous International Monetary Fund- Extended Fund Facility (IMF-EFF) program and the government’s implementation capacity."}},"P181083":{"id":"P181083","countryname":["Republic of Liberia"],"lendinginstr":"Investment Project Financing","project_name":"Rural Economic Transformation Project Second Additional Financing","p2a_updated_date":"2023-12-20 00:00:00.0","totalcommamt":"85,000,000","boardapprovaldate":"2023-12-19T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181083","status":"Active"},"P178382":{"id":"P178382","countryname":["Kingdom of Morocco"],"lendinginstr":"Development Policy Lending","project_name":"Second Strengthening Human Capital for a Resilient Morocco DPF","p2a_updated_date":"2023-12-20 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2023-12-19T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178382","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Strengthening Human Capital for a Resilient Morocco Development Policy Financing (DPF) for Morocco is to improve protection against health risks, human capital losses during childhood, and poverty in old age and to improve climate risk management and resilience against catastrophic events. The DPF series has three pillars and supports three core reform imperatives of the government program. Pillar 1 supports the universalization of health insurance and the revamping of the health system. Pillar 2 supports the expansion of pension coverage and reforms to implement the direct social benefits (DSB) program. Pillar 3 supports strengthening resilience to natural disasters and risks, including through the establishment of adequate institutional, coordination, and response mechanisms."}},"P179078":{"id":"P179078","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Health Security Program in Western and Central Africa","p2a_updated_date":"2023-12-21 00:00:00.0","totalcommamt":"158,000,000","boardapprovaldate":"2023-12-19T00:00:00Z","closingdate":"1/31/2032 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179078","status":"Active","project_abstract":{"cdata!":"The development objective of the Health Security Program in Western and Central Africa Project for Cabo Verde, Guinea, Liberia is to increase regional collaboration and health system capacities to prevent, detect, and respond to health emergencies in Western and Central Africa. The project comprises of five components. The first component, prevention of health emergencies focuses on strengthened planning and management of health security resources, as well as preventing and minimizing impacts of health threats such as zoonoses and antimicrobial resistance (AMR). It consists of following sub-components: (i) health security governance, planning, and stewardship; and (ii) scaling-up one health agenda and combatting AMR. The second component, detection of health emergencies focuses on multisectoral surveillance systems and mechanisms for data sharing within and across borders, strong regional laboratory networks and multisectoral and integrated workforce required to enable early detection of health emergencies. It consists of following sub-components: (i) collaborative surveillance; (ii) laboratory quality and capacity; and (iii) multi-disciplinary human resources for health emergencies. The third component, health emergency response will build and sustain capacities that can prevent and prepare for an outbreak from becoming an epidemic or pandemic, through a focus on disease control and effective health emergency response. It consists of following sub-components: (i) health emergency management; and (ii) health service delivery for health emergencies. The fourth component, program management and institutional capacity will support the critical building blocks for strong implementation and coordination required for implementing a regional program. The fifth component, contingency emergency response component (CERC) will facilitate access to rapid financing by allowing for the reallocation of uncommitted project funds in the event of a public health emergency (PHE) in a country, either by a formal declaration of a national emergency or upon a formal request from the respective government of a Participating Country."}},"P181324":{"id":"P181324","countryname":["Republic of Honduras"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening Honduras' National Civil Registry and Identification Ecosystem Project","p2a_updated_date":"2023-12-19 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-12-18T00:00:00Z","closingdate":"8/26/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181324","status":"Active"},"P180587":{"id":"P180587","countryname":["Macedonia, Republic of North"],"lendinginstr":"Development Policy Lending","project_name":"North Macedonia Sustainability and Resilience DPO","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-12-15T00:00:00Z","closingdate":"6/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180587","status":"Closed","project_abstract":{"cdata!":"The development objective of the Sustainability and Resilience Development Policy Operation Program is to support energy and financial sector climate transition, strengthen the sustainability of public finances, and safeguard financial sector stability. The EUR93.8 million stand-alone Sustainability and Resilience Development Policy Operation (DPO) supports North Macedonia’s efforts in energy and financial sector climate transition, strengthening the sustainability of its public finances, and safeguarding financial sector stability. Following the start of the accession negotiations process with the European Union (EU), and the screening process in July 2022, the government embarked on an ambitious reform program to safeguard macroeconomic stability, strengthen human capital for inclusive development, improve the competitiveness of domestic companies and their integration in the global value chains, and foster green transition. The DPO supports selected, high priority reforms to safeguard fiscal sustainability and financial sector stability as well as boost climate mitigation and adaptation actions that form part of a larger reform agenda of the government. This operation has been closely coordinated with international partners (including the IMF, European Commission, and other bilateral partners) to ensure that policy support and technical assistance are complementary, and to mobilize parallel financing from OPEC Fund. The DPO objectives are aligned with the upcoming World Bank Group (WBG) Country Partnership Framework (CPF) FY24-FY282 as well as with the WBG’s Evolution Roadmap approach. The operation is private capital enabling (PCE) under the Maximizing Finance for Development-Enabling (MFD-E) framework, as it supports the legislative and regulatory changes to unlock private investment in renewables. In addition to the Paris Agreement, North Macedonia’s green transition agenda, outlined in the National Energy and Climate Plan, is increasingly aligned with the European Green Deal."}},"P180093":{"id":"P180093","countryname":["Republic of Congo"],"lendinginstr":"Development Policy Lending","project_name":"Republic of Congo Second Fiscal Management and Inclusive Growth DPF","p2a_updated_date":"2023-12-18 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2023-12-15T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180093","status":"Active","project_abstract":{"cdata!":"The operation supports the government’s reform efforts to strengthen fiscal performance and diversify the economy by improving the conditions for inclusive and sustainable growth. The first pillar of the proposed DPF supports reforms to strengthen revenue mobilization from both the oil and non-oil sectors and PFM. The second pillar consists of reforms to support the country’s economic diversification and inclusion agendas through strengthened competition, improved business environment, human capital accumulation, protection of the most vulnerable populations, and improved access to electricity. This DPF is complementary to World Bank-financed investment and Program-for-Results operations and builds on the World Bank’s core analytics, notably the recent Country Economic Memorandum, Public Finance Review, and Public Expenditure and Financial Accountability assessment. The operation also supports adjustments to climate change through key adaptation actions. Congo is the 166th most vulnerable country to climate change out of 182 countries on the Notre Dame GAIN Country Index.10 Mean temperatures have increased, and precipitation has been more erratic. The impact of climate change is already observable in the form of more frequent floods and higher incidence of heat-related and vector-borne illnesses, with the country’s main agricultural zone severely affected, causing harm to the poor who rely heavily on agriculture as their primary income source. Given these impacts, adjusting to the realities of climate change will require key adaptation actions with a focus on strengthening the social safety net and building resilience in agriculture, labor productivity, coastal areas, and health. Several actions in this DPF will help Congo adapt to climate change including by improving the social protection system (including for those affected by climate change and who rely on forests for their livelihoods), improving service delivery including for health and education, and incorporating sustainable development objectives into the public procurement process."}},"P181469":{"id":"P181469","countryname":["Somali Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Somalia Shock Responsive Safety Net for Human Capital Project Third Additional Financing","p2a_updated_date":"2023-12-18 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-12-15T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181469","status":"Active"},"P180216":{"id":"P180216","countryname":["Co-operative Republic of Guyana"],"lendinginstr":"Development Policy Lending","project_name":"Enhancing Policies for Human Capital Accumulation","p2a_updated_date":"2023-12-18 00:00:00.0","totalcommamt":"35,000,000","boardapprovaldate":"2023-12-14T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180216","status":"Active"},"P179687":{"id":"P179687","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Investment Project Financing","project_name":"Nigeria Distributed Access through Renewable Energy Scale-up Project","p2a_updated_date":"2023-12-18 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2023-12-14T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179687","status":"Active","project_abstract":{"cdata!":"The development objective of the Distributed Access Through Renewable Energy Scale-Up Project for Nigeria is to increase access to electricity services for households and micro, small, and medium-sized enterprises (MSMEs) with private sector led distributed renewable energy generation. The project comprises of three components. The first component, solar hybrid mini grids for economic development will support the development of privately owned and operated solar hybrid mini grids in unserved (primarily rural and remote) and underserved (primarily urban and peri-urban) areas with high economic growth potential. It consists of following sub-components: (i) minimum subsidy tender; and (ii) performance-based grants program. The second component, standalone solar systems (SAS) for households, MSMEs, and agribusinesses will expand the availability and affordability of SAS for households (basic electrification), MSMEs, and agribusinesses (PUE support) in rural areas. It consists of following sub-components: (i) performance-based grants for standalone solar; and (ii) catalytic grants. The third component, technical assistance will be supported by parallel financing and collaboration from various development partners, such as Global Energy Alliance for People and Planet (GEAPP), Sustainable Energy for All (SEforALL), Japan International Cooperation Agency (JICA), United States Agency for International Development (USAID), etc., to create an ecosystem for universal electrification. It consists of following sub-components: (i) institutional strengthening; (ii) distributed access through renewable energy scale-up (DARES) ecosystem and implementation; and (iii) engagement with states."}},"P181514":{"id":"P181514","countryname":["Ukraine"],"lendinginstr":"Investment Project Financing","project_name":"Sixth Additional Financing for Public Expenditures for Administrative Capacity Endurance (PEACE) in Ukraine","p2a_updated_date":"2023-12-15 00:00:00.0","totalcommamt":"1,346,000,000","boardapprovaldate":"2023-12-14T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181514","status":"Active"},"P178910":{"id":"P178910","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Morocco Accelerating the Transformation of Higher Education and Scientific Research Operation","p2a_updated_date":"2023-12-18 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-12-14T00:00:00Z","closingdate":"4/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178910","status":"Active","project_abstract":{"cdata!":"The development objective of the Accelerating the Transformation of Higher Education (HE) and Scientific Research Operation for Morocco is to improve labor market relevance of priority programs at public universities and strengthen the governance of higher education and scientific research. To address challenges in HE and research and implement the new development model (NDM), Ministry of Higher Education, Scientific Research and Innovation (MESRSI) launched a transformative and ambitious sector plan in 2023, the National Plan for the Acceleration of the Transformation of the Ecosystem of HE, Scientific Research and Innovation (Plan National d’Accélération de la Transformation de l’Ecosystème de l’Enseignement Supérieur, de la Recherche Scientifique et de l’Innovation, PACTE-ESRI), which was endorsed by the highest level of government. It consists of a comprehensive set of strategic reforms with the potential to transform HE and scientific research, focused on four pillars: (i) academic excellence, (ii) research excellence, (iii) governance and operational excellence, and (iv) innovation."}},"P178322":{"id":"P178322","countryname":["Republic of Sierra Leone"],"lendinginstr":"Development Policy Lending","project_name":"Sierra Leone Third Inclusive and Sustainable Growth DPF","p2a_updated_date":"2023-12-15 00:00:00.0","totalcommamt":"65,000,000","boardapprovaldate":"2023-12-14T00:00:00Z","closingdate":"12/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178322","status":"Active","project_abstract":{"cdata!":"This Development Policy Financing  (DPF) series addresses critical developmental challenges by supporting reforms related to macroeconomic stability, mining sector governance, land management practices, gender equality, and accountability of the public sector, while helping to meet increased financing needs. The supported reforms will help (i) address poor governance of the mining and land sectors; (ii) enhance inclusion in access to financial services, employment, and education; and (iii) contribute to reducing fiscal and debt vulnerabilities. This DPF builds on the strong foundation established by the two earlier operations in the series which initiated landmark legislative reforms, including to promote decentralized and inclusive land management and strengthen governance and licensing practices in the mining sector. By addressing key shortcomings in land management, mining sector governance and state-owned enterprise (SOE) governance, this operation is also strengthening climate adaptation and resilience. The structural reforms supported by this DPF are complemented by macro-stabilization reforms under the International Monetary Fund’s (IMF) Extended Credit Facility (ECF) program, which contains quantitative quarterly fiscal and monetary targets. The World Bank is also supporting key fiscal and debt reforms through the Sustainable Development Finance Policy (SDFP) engagement and ongoing technical assistance."}},"P176255":{"id":"P176255","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"ADDITIONAL FINANCING -  TRADE LOGISTICS PROJECT","p2a_updated_date":"2023-12-14 00:00:00.0","totalcommamt":"90,000,000","boardapprovaldate":"2023-12-13T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176255","status":"Active"},"P180512":{"id":"P180512","countryname":["Dominican Republic"],"lendinginstr":"Investment Project Financing","project_name":"Distribution Efficiency Improvement and Utility Strengthening Project","p2a_updated_date":"2023-12-14 00:00:00.0","totalcommamt":"225,000,000","boardapprovaldate":"2023-12-13T00:00:00Z","closingdate":"11/2/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180512","status":"Active","project_abstract":{"cdata!":"The objective of the Distribution Efficiency Improvement and Utility Strengthening Project is to improve access to more reliable, efficient, and environmentally sustainable electricity supply to the population of the Dominican Republic. There are three components to the project, the first component being improving governance of the distribution companies. This component includes two subcomponents: a commercial management system, and a metering data management system. This component will also support the implementation of the reforms laid out in the CUED resolution, which is aimed at improving the governance of the three distribution companies for better performance and results. The second component is the supporting the implementation of the integrated loss reduction plan. This component includes four subcomponents: replacement of obsolete metering equipment and installation of metering equipment for new clients, distribution network rehabilitation and standardization of supplies to clients, implementation of a macro- and micro-metering system for loss reduction monitoring, and social and environmental management. The third component is the capacity building, administration, monitoring, and evaluation. This component will support project execution, including, inter alia, with regards to procurement, financial management, monitoring and evaluation, environmental and social compliance, audits, trainings, and operating costs."}},"P179040":{"id":"P179040","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Ethiopia Digital ID for Inclusion and Services Project","p2a_updated_date":"2023-12-15 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2023-12-13T00:00:00Z","closingdate":"1/7/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179040","status":"Active","project_abstract":{"cdata!":"The objective of the Digital ID for Inclusion and Services Project is to establish an inclusive digital ID ecosystem and improve service delivery for registered persons in Ethiopia. There are five components to the project, the first component being building institutions and trust. This component includes three subcomponents: supporting stakeholder engagement and communications, establishing and operationalizing the ID Institution, and establishing and operationalizing the Data Protection Commission of Ethiopia. The second component is the establishing scalable and secure Fayda ICT infrastructure. This component includes three subcomponents: supporting the design, development and maintenance of appropriate software for Fayda, supporting development of data infrastructure, and strengthening digital security. The third component is the inclusive ID issuance. This component includes three subcomponents: supporting mass registration and issuance of physical IDs to Ethiopian residents, supporting mass registration and issuance of physical IDs to Ethiopian residents in host communities and refugees, and supporting integration of Fayda and digital civil registration. The fourth component is the improving service delivery. This component includes two subcomponents: supporting the integration of Fayda and developing an Ethiopia digital stack. Finally, the fifth component is the project management. This component will facilitate effective implementation of the project by supporting the establishment and functioning of the Project Management Unit (PMU) to undertake financial management (FM), procurement, risk management, ESF management, and reporting responsibilities, as well as act as the secretariat for the PSC and augment technical expertise in more complex activities."}},"P175072":{"id":"P175072","countryname":["Republic of Malawi"],"lendinginstr":"Development Policy Lending","project_name":"Malawi First Growth and Resilience DPO with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2023-12-14 00:00:00.0","totalcommamt":"137,000,000","boardapprovaldate":"2023-12-12T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P175072","status":"Active","project_abstract":{"cdata!":"It is the first in a programmatic series of two in the amount of US80 million dollars equivalent and is combined with a Catastrophe Deferred Drawdown Option (Cat-DDO) of US57 million dollars equivalent. It helps the Government of Malawi (GoM) address longstanding macroeconomic imbalances, as supported through a new International Monetary Fund (IMF) program and strengthen structural and governance foundations for a more dynamic and resilient economy. The reforms underpinning this operation will also increase the country’s preparedness for future shocks, especially climate-related disasters that have had a disproportionate impact on the poor. The operation supports the aims of the country’s national development plan, Malawi 2063, and the World Bank’s Country Partnership Framework (CPF), FY2021-25. By strengthening resilience to climate change impacts in one of the world’s most vulnerable countries, it aligns with the World Bank’s Evolution priorities. To address persistent problems in fiscal governance and transparency, pillar 1 aims to strengthen the legal framework for PFM, attract private finance, increase transparency in procurement, and improve the targeting and financial management of the AIP. Pillar 2 addresses core constraints to private sector-led growth by strengthening the institutional foundations of the energy sector, supporting the digital economy through robust data protection legislation, and enabling the development of a deposit insurance system that can foster financial inclusion and financial sector stability. Pillar 3 operationalizes Malawi’s CCDR by protecting poor households’ livelihoods through effective shock-sensitive social safety nets, improving the legal and regulatory framework for government to both manage and respond to disaster risks and to enhance the resilience of buildings. These reforms are being implemented in close coordination with a prospective ECF program and are complemented by planned budget support programs from other development partners to help ensure the Government has support in the medium term as it implements difficult but essential reforms. Over the past two years, the World Bank has been 'leaning in' during a critical time for Malawi, including through emergency financing for recurrent costs, the scale up of social protection, a backstopping facility for strategic commodity imports and the triggering of Contingency Emergency Response Components. This DPO complements these efforts."}},"P179381":{"id":"P179381","countryname":["Republic of Kenya"],"lendinginstr":"Investment Project Financing","project_name":"Kenya Jobs and Economic Transformation (KJET) Project","p2a_updated_date":"2023-12-13 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-12-11T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179381","status":"Active","project_abstract":{"cdata!":"The objective of the Jobs and Economic Transformation Project for Kenya is to increase private sector investments, access to markets and sustainable finance to create and improve jobs. There are four components to the project, the first component being strengthening business and investment enabling reforms. This component will address prioritized Business Regulatory and Investment Policy and Promotion reforms to support private sector growth, through a combination of diagnostics, legal and regulatory reforms, institutional capacity development, and integration of a One Start One Stop digital platform (OSOS). The second component is the Enhancing MSME Cluster Competitiveness. This component includes two subcomponents: Technical Assistance (TA) on competitive cluster development initiatives and building capacities of MSME clusters. The third component is the scaling up green financing and strengthening climatic resilience for SMEs. This component includes two subcomponents: scaling up green SME financing and strengthening MSMEs climatic resilience. Finally, the fourth component is the project management, monitoring and evaluation. This component will strengthen the Monitoring and Evaluation (M&E) systems and capacity of national implementing agencies, and finance project management activities with the aim to build sustainable systems that last beyond the lifetime of this project."}},"P179265":{"id":"P179265","countryname":["Republic of Cabo Verde"],"lendinginstr":"Development Policy Lending","project_name":"Cabo Verde: First Fiscal Space and Sustainable Growth DPF","p2a_updated_date":"2023-12-13 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2023-12-11T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179265","status":"Active","project_abstract":{"cdata!":"The  objective of the First Fiscal Space and Sustainable Growth Development Policy Financing Project is to (i) rebuild fiscal space, enhance climate resilience of public investments, and improve state-owned enterprise (SOE) performance, and (ii) promote sustainable growth through the green and blue economy, and inclusive economic participation. The operation consists of an International Development Association (IDA) credit in the amount of SDR 19.2 million (US25 million dollars equivalent) and is the first of three single-tranche DPF operations in a programmatic series. It supports reforms to advance fiscal consolidation and place public debt on a decisive downward path while promoting a transition to the green and blue economy. The DPF also focuses on advancing fiscal consolidation while building fiscal space, including for climate resilient investments. Elevated fiscal deficits, due to higher expenditures in 2020 and 2021, increased public debt from 108.5 percent of GDP in 2019 to 152 percent of GDP in 2021, financed through domestic and external debt. While strong growth and an improvement in the primary balance decreased public debt to 126.5 percent of GDP in 2022, concessional IDA resources remain important given lack of access to international capital markets and costly domestic debt. Furthermore, high vulnerability to climate change will demand additional fiscal resources in the short term. Over the last decade, economic losses from disaster and climate-related shocks have increased, with annual average losses estimated at 1 percent of GDP, mainly due to climate-related events. With a third of the population engaged in activities potentially affected by climate change, increased weather variability poses a major threat to the sustainability of poverty reduction efforts."}},"P178836":{"id":"P178836","countryname":["Republic of Djibouti"],"lendinginstr":"Investment Project Financing","project_name":"Djibouti Agri-Food Value Chain Development Project","p2a_updated_date":"2023-12-13 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2023-12-11T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178836","status":"Active","project_abstract":{"cdata!":"The  objective of the Agri-Food Value Chain Development Project for Djibouti is to improve the competitiveness and the resilience of selected agri-food value chains in the areas targeted by the project. There are four components to the project, the first component being public infrastructure and services for agri-food value chain development. This component aims at improving the enabling environment for agri-food value chains development, with a focus on areas with growth potential. This component includes three subcomponents: public infrastructure, regulatory and institutional framework, and innovation support. The second component is the support to agri-food investment and access to financing. This component aims at providing (i) support to agri-food investors in the development and implementation of bankable and climate-informed business plans, and support to financial institutions to improve their knowledge of the agri-food sector and develop financial tools adapted to the sector, and (ii) financing resources tailored to the needs of agri-food investors. It will have two sub-components: support to business plans and advisory services, and support to financial services providers. The third component is the project management. This component will finance the daily project implementation activities. The project will finance the operations of a Project Implementation Unit (PIU) at the MAEPE-RH, including a Project Coordinator, and staff dedicated to administrative and fiduciary management, technical tasks, Environmental and Social compliance, communications and Monitoring and Evaluation (M&E). Finally, the fourth component is the Contingent Emergency Response Component (CERC). This component will include a Contingent Emergency Response Component (CERC), designed to provide a swift response in the event of an eligible crisis or emergency, defined as “an event that has caused, or is likely to imminently cause, a major adverse economic and/or social impact associated with natural or man-made crises or disasters."}},"P179006":{"id":"P179006","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Development Policy Lending","project_name":"Cote d'Ivoire Second Investment for Growth DPF","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-12-08T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179006","status":"Active","project_abstract":{"cdata!":"The objective of the Second Investment for Growth Development Policy Financing Project is to: (1) strengthen competition in key enabling sectors and domestic revenue mobilization; (2) expand equitable access to health and education services; (3) promote the sustainable use of natural resources. The operation consists of a credit in the amount of EUR 281.4 million (equivalent to US300 million dollars). The operation supports key reforms for advancing Côte d’Ivoire’s medium term inclusive growth objective of becoming an upper middle-income economy by 2030, which entails doubling real Gross Domestic Product (GDP) per capita and halving poverty to 20 percent from 39.5 percent in 2018. The DPF also supports the need to strengthen fiscal and debt sustainability. While growth was relatively resilient in 2020, with a strong rebound in 2021, fiscal deficits have risen since the onset of the global COVID-19 crisis, aggravated by the impact of Russia’s invasion of Ukraine on global inflation and commodity prices. The fiscal deficit (incl. grants) more than doubled over 3 years, from 2.3 to 6.8 percent of GDP between 2019 and 2022, in 2022 due to additional expenditures through price caps and subsidies to contain prices, high capital expenditure levels and security spending due to insecurity in the northern region, while efforts on domestic revenue mobilization have remained below expectation. Public and publicly guaranteed (PPG) debt has increased significantly from just about 40 percent of GDP in 2019 to almost 60 percent of GDP in 2022. Rising external borrowing costs are limiting Côte d’Ivoire’s capacity to access sustainably international markets in the short-term. Recognizing the need to increase fiscal space, and maintain debt sustainability, the government entered a 40, months ECF-EFF arrangement with the IMF in May 2023."}},"P179599":{"id":"P179599","countryname":["Tuvalu"],"lendinginstr":"Investment Project Financing","project_name":"Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience: Tuvalu","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"13,050,000","boardapprovaldate":"2023-12-08T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179599","status":"Active","project_abstract":{"cdata!":"The objective of the Pacific Islands Regional Oceanscape Program-Second Phase for Economic Resilience Project is to strengthen regional collaboration and national capacity for the management and the sustainable development of the oceanic and coastal fisheries sector in Tuvalu. There are four components to the project, the first component being strengthening policy and institutions. This component will provide institutional support to the national fisheries program, thereby enabling better regional, national, and subnational fisheries management and development. This component includes three subcomponents: technical assistance to support the tfd transition into the TFA, meeting Tuvalu’s flag and port state responsibilities, and strengthening seafood safety standards. The second component is the strengthening Regional Collaboration and National Capacity for Oceanic Fisheries. This component includes two subcomponents: consolidating oceanic fisheries management and harnessing of oceanic fisheries. The third component is the strengthening regional collaboration and national capacity for coastal fisheries. This component includes two subcomponents: strengthening coastal fisheries monitoring and management and developing research and small-scale aquaculture. Finally, the fourth component is the project management. This component will finance the day-to-day management and implementation of the project, including but not limited to consultancy costs for financial management (FM), procurement administration, monitoring and evaluation, management of environmental and social (E&S) risks, costs of information and communication technology (ICT) equipment, citizen engagement activities, and reimbursement of project preparation costs."}},"P180811":{"id":"P180811","countryname":["Republic of Indonesia"],"lendinginstr":"Investment Project Financing","project_name":"Indonesia Health Systems Strengthening Project","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"1,484,000,000","boardapprovaldate":"2023-12-08T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180811","status":"Active","project_abstract":{"cdata!":"The objective of the Health Systems Strengthening Project is to increase the availability of functional equipment in public health facilities and improve the utilization of public health services across Indonesia. There are four components to the project, the first component being procurement, installation, operation, and maintenance of equipment to primary care facilities across Indonesia, SOPHI component. The second component is the Procurement, installation, operation, and maintenance of equipment to referral hospital facilities across Indonesia, SIHREN component. The third component is the procurement, installation, operation, and maintenance of equipment to tier 2, 3, 4, and 5 public health laboratory facilities across Indonesia, InPULS component. Finally, the fourth component is the project management, administration, digitization, and training across the SOPHI, SIHREN, and InPULS components. This component covers activities related to project management administration and soft activities for a Project Management Unit (PMU) for three components, as well as project management and administration costs for the establishment and operationalization of Central Project Management Unit (CPMU) and Central Procurement Unit (CPU)."}},"P180196":{"id":"P180196","countryname":["Republic of Rwanda"],"lendinginstr":"Development Policy Lending","project_name":"Boosting Green Finance, Investment and Trade in Rwanda","p2a_updated_date":"2024-05-02 00:00:00.0","totalcommamt":"125,000,000","boardapprovaldate":"2023-12-08T00:00:00Z","closingdate":"4/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180196","status":"Closed","project_abstract":{"cdata!":"The development objective of Boosting Green Finance, Investment and Trade in Rwanda Programmatic Development Policy Financing Project for Rwanda is to support the implementation of a reform agenda to boost green, private sector-led growth in Rwanda and stimulate green investments. This operation supports a far-reaching reform program that reflects the Government’s goals to stimulate private sector-led and green growth captured in Rwanda’s Vision 2050. This project has two pillars as follows: Pillar A: Increase the private sector’s participation, trade, and contestability; and Pillar B: Facilitate climate finance and green public and private investments. This programmatic DPF series removes key constraints to private sector investment and green growth through synergistic reforms prioritized based key lessons learned from the World Bank’s extensive experience in preparing DPF operations and specific selection criteria. The set of reforms is aligned with the World Bank’s Country Partnership Framework (CPF) 2021–2025, with a focus on maximizing finance for development, expanding the economic role of the private sector, and promoting green growth. This programmatic series with two single-tranche operations is designed to help the GoR address key priorities set out in the World Bank’s Systematic Country Diagnostic (SCD) (2019), most notably on the theme of market and private sector development. The programmatic DPF series is closely aligned to the World Bank’s CPF FY2021–2026. This programmatic DPF series also builds on the overall objectives of Rwanda’s NST1 (2017–2024) which provides the medium-term framework for achieving the country’s development aspirations. Finally, this programmatic DPF meets the World Bank’s commitment to aligning its financial flows with the Paris Agreement and the country’s pathway toward low greenhouse gas emissions and climate-resilient development."}},"P181388":{"id":"P181388","countryname":["Solomon Islands"],"lendinginstr":"Investment Project Financing","project_name":"Urban Water Supply and Sanitation Sector Project Additional Financing","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"41,260,000","boardapprovaldate":"2023-12-08T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181388","status":"Active"},"P180935":{"id":"P180935","countryname":["Republic of Kenya"],"lendinginstr":"Program-for-Results Financing","project_name":"Second Kenya Devolution Support Program","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-12-07T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180935","status":"Active"},"P180470":{"id":"P180470","countryname":["Republic of Uzbekistan"],"lendinginstr":"Development Policy Lending","project_name":"First Inclusive and Resilient Market Economy Development Policy Operation","p2a_updated_date":"2023-12-11 00:00:00.0","totalcommamt":"800,000,000","boardapprovaldate":"2023-12-07T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180470","status":"Active","project_abstract":{"cdata!":"This Development Policy Operation (DPO) of US$800 million supports the Government of Uzbekistan in advancing the country’s transition to an inclusive and resilient market economy. It comprises an IBRD Loan of US$300 million and three IDA Credits: a concessional IDA Credit of US160 million dollars; a concessional IDA Shorter‐Maturity Loan (SML) Credit of US240 million dollars (US100 million dollars of which is made available through the IDA Scale‐Up Window [SUW]) 2 and a non‐ concessional IDA Credit of US100 million dollars through the IDA SUW. The proposed operation is the first in a series of two operations supporting reforms across three areas: (i) creating markets; (ii) improving fiscal risk management and public procurement; and (iii) supporting social inclusion and green resilience. Following five successive standalone operations, the shift to a programmatic DPO series reflects the maturation of the government policy and planning process. The operation is central to the World Bank Group’s (WBG) overall engagement with Uzbekistan, as outlined in the 2022-2026 Country Partnership Framework (CPF). Per IDA20 SUW-SML implementation arrangements, this program is aligned with the WBG Global Crises Response Framework (GCRF) pillar 2: protecting people and preserving jobs, GCRF pillar 3: strengthening resilience, and GCRF pillar 4: strengthening policies, institutions and investments for rebuilding better. The Asian Infrastructure Investment Bank (AIIB) and KfW Development Bank (KfW) are also expected to provide parallel financing in support of this operation."}},"P503036":{"id":"P503036","countryname":["West Bank and Gaza"],"lendinginstr":"Investment Project Financing","project_name":"Gaza Health Emergency Response Project","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"10,000,000","boardapprovaldate":"2023-12-06T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P503036","status":"Active","project_abstract":{"cdata!":"The development objective of the Health Emergency Response Project for Gaza to provide emergency support for provision of essential health services to the population of Gaza. The project has two project development objectives (PDO)-level indicators that will be utilized to track progress: i) number of beneficiaries of essential health and nutrition services (disaggregated by gender and age); and ii) number of health facilities provided with drugs, medical equipment, medical supplies, and non-medical supplies for provision of essential health services. The project has three components that include procurement of essential drugs, medical supplies and medical equipment, essential non-medical equipment to ensure delivery, as well as critical restoration activities of the facilities damaged due to the conflict.. The first component will address the needs related to maternal, newborn and child (MNCH) health services, including essential medication and supplies needed throughout the pregnancy, labor and post-birth period for women as well as for acute and chronic conditions for more than one million children in Gaza. The second component focuses on emergency care needs of the population as well as critical services and medications for the patients with non-communicable diseases (NCDs). Where needed, components 1 and 2 will finance minor civil work services, including sanitation, to allow operability of the damaged facilities in Gaza to ensure continuous delivery of essential services. Component 3 will focus on project coordination and monitoring, including independent monitoring arrangements to ensure accountability."}},"P179365":{"id":"P179365","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Brazil: Support to New Bolsa Familia Conditional Cash Transfer Program","p2a_updated_date":"2023-12-08 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-12-06T00:00:00Z","closingdate":"4/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179365","status":"Active","project_abstract":{"cdata!":"The objective of the Support to New Bolsa Familia Conditional Cash Transfer Program Project for Brazil is to protect the income of poor families with children from 0 to 6 years of age and mitigate risks that might damage those children’s human capital. The project will support the financing of the BF CCT program for children from 0 to 6 years living in poor families (US299.25 million dollars). The project consists of a single component of benefits, paid to families that have members in specific age groups (0–6 years), who will be complying with human capital conditionalities (health and education). By financing cash transfers in BF, the loan would generally follow the same structure and activities as the latest IPF with the same ministry, which closed in December 2022, ensuring continuity of World Bank support to the program for an additional two years. The loan will start disbursing in the last quarter of 2023 and close in the second quarter 2025 (20 months). The World Bank project implementation support will provide technical assistance (TA) to overcome the overall implementation challenges of the new BF program, including improving the quality of the single registry and better monitoring conditionalities, as the package of services will determine the effectiveness of the project financing."}},"P179785":{"id":"P179785","countryname":["Republic of Chile"],"lendinginstr":"Program-for-Results Financing","project_name":"Chile: Program for Universal Primary Healthcare Coverage and Resilience","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-12-06T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179785","status":"Active"},"P500689":{"id":"P500689","countryname":["Republic of Indonesia"],"lendinginstr":"Development Policy Lending","project_name":"Indonesia Universal Health Coverage Development Policy Loan","p2a_updated_date":"2024-12-26 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2023-12-06T00:00:00Z","closingdate":"12/24/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500689","status":"Closed","project_abstract":{"cdata!":"The development objective of Universal Health Coverage Development Policy Loan (DPL) Project for Indonesia is to support the government’s efforts to strengthen the supply of medical care professionals. Within the Government of Indonesia (GoI’s) program and priorities as defined by the Rencana Pembangunan Jangka Panjang Nasional (RPJPN) and Rencana Pembangunan Jangka Menengah Nasional (RPJMN), the DPL includes a set of Prior Actions (PAs) that support select high-impact policy reforms centered around the Health Omnibus Law (HOL). PA 1 supports policy reforms that change the previously overlapping and convoluted policies for the registration and licensing of medical doctors which limited the domestic supply of doctors and created opportunities for rent-seeking. PA 2 supports policy reforms to improve the supply of foreign medical doctors and Indonesian medical doctors who graduated abroad, including by exempting certain such professionals from a competency test. PA 3 supports policy reforms to create viable pathways for non-Indonesian medical doctors to practice in Indonesia, to improve the supply of such doctors by extending their permitted duration of practice. PA 4 supports policy reforms to expand the supply of specialist medical doctors through a nationwide hospital-based residency program with codified competency standards. PA 5 supports policy reforms to enhance health system resilience through establishing a healthcare worker reserve. The policy reforms supported by the DPL are expected to unlock critical constraints in the health system. The DPL is aligned with the goals of the Paris Agreement and consistent with Indonesia’s climate commitments."}},"P180349":{"id":"P180349","countryname":["Dominican Republic"],"lendinginstr":"Investment Project Financing","project_name":"Program to Support the Strengthening of the National Health System","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"190,000,000","boardapprovaldate":"2023-12-06T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180349","status":"Active"},"P181363":{"id":"P181363","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for the SADC Regional Statistics Project","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"60,000,000","boardapprovaldate":"2023-12-05T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181363","status":"Active"},"P180940":{"id":"P180940","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"South Sudan Resilient Agricultural Livelihoods Project Additional Financing","p2a_updated_date":"2023-12-05 00:00:00.0","totalcommamt":"30,500,000","boardapprovaldate":"2023-12-04T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180940","status":"Active"},"P177688":{"id":"P177688","countryname":["Republic of Burundi"],"lendinginstr":"Investment Project Financing","project_name":"Burundi Jobs and Economic Transformation Project","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-12-01T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177688","status":"Active","project_abstract":{"cdata!":"The development objective of Jobs and Economic Transformation Project for Burundi is to improve Micro, Small and Medium Enterprise (MSMEs’) access to finance, especially for MSMEs owned by women and refugees, and increase job creation by MSMEs. This project has five components. 1) The first component, MSME access to markets and value chain development, has the following sub-components: (i) Expand MSME access to sustainable productive infrastructure; (ii) Upgrade MSME capabilities; and (iii) Supplier development and market linkage programs. 2) The second component, Financial inclusion and sustainable access to finance for MSMEs, has the following sub-components: (i) Strengthen credit infrastructure; (ii) Enhance MSME access to credit; and (iii) Adoption of digital financial services. 3) The third component, Sustainable business enabling environment and investment climate support, has the following sub-components: (i) Business enabling environment reforms; and (ii) Institutional capacity building for MSME support and private sector development."}},"P176163":{"id":"P176163","countryname":["Republic of Albania"],"lendinginstr":"Investment Project Financing","project_name":"Clean and Resilient Environment for Blue Sea Project","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"80,000,000","boardapprovaldate":"2023-12-01T00:00:00Z","closingdate":"3/29/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176163","status":"Active","project_abstract":{"cdata!":"The development objective of Clean and Resilient Environment for Blue Sea Project is to reduce pollution from land-based sources into the aquatic environment in selected areas of the South-West Coastal Belt of Albania. This project has three components. 1) The first component, Promote Integrated and Circular Approaches for Protection of Landscapes and Water Resources, has the following sub-components: (i) Institutional support for sustainable performance, enhanced monitoring and transition to circular economy; (ii) Environmental-Performance Based Investments for local pollution prevention; and (iii) Behavioral change support and dissemination for scaling up. 2) The second component, Reduce Water Pollution in the Vjosa River, has the following sub-components: (i) Expansion of sanitation infrastructure; (ii) Improved sanitation facilities and management; and (iii) Non-point source pollution prevention. 3) The third component, Project Management, Monitoring and Evaluation, has the following sub-components: (i) Management and coordination activities by Ministry of Tourism and Environment (MoTE); and (ii) Management and coordination activities by National Agency for Water, Sewage and Waste Infrastructure (AKUM)."}},"P180931":{"id":"P180931","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Eastern Africa Regional Digital Integration Project SOP-II","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"130,000,000","boardapprovaldate":"2023-12-01T00:00:00Z","closingdate":"1/7/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180931","status":"Active","project_abstract":{"cdata!":"The development objective of Regional Digital Integration Project Series of Projects II for Eastern and Southern Africa is to advance digital market integration in the Eastern Africa region by increasing affordable access to regional broadband connectivity, and strengthening the enabling environment and policy convergence for cross-border data flows, and developing digital skills. This project has three components. 1) The first component, Connectivity Market Development and Integration, has the following sub-components: (i) Cross-border and national backbone network connectivity; (ii) Last mile connectivity, including in borderland areas; and (iii) Enabling legal, regulatory, and institutional ICT environment. 2) The second component, Data Market Development and Integration, has the following sub-components: (i) Cybersecurity frameworks, infrastructure and capacity; and (ii) Data exchange, governance, and protection. 3) The third component, Online Market Development and Integration, has the following sub-components: (i) Digital enablers for cross-border trade and service delivery; and (ii) Research and education networks and training for digital skills. 4) The fourth component, Project Management and Implementation Support, aims to finance project management and implementation of project-associated activities. 5) The fifth component, Contingent Emergency Response Component, aims to allow for rapid reallocation of uncommitted IDA funds in the event of an eligible emergency declared in one of the participating countries."}},"P177794":{"id":"P177794","countryname":["Republic of Kiribati"],"lendinginstr":"Development Policy Lending","project_name":"Kiribati First Resilient Growth Development Policy Operation with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2023-12-01 00:00:00.0","totalcommamt":"10,000,000","boardapprovaldate":"2023-11-30T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177794","status":"Active","project_abstract":{"cdata!":"The operation is the first in a programmatic series of two development policy operations (DPO), and includes a Disaster Risk Management (DRM) policy grant with a Catastrophe Deferred Drawdown Option (Cat DDO). The objectives and pillars of the operation are: (i) strengthening fiscal management, and (ii) promoting inclusive and climate-resilient economic development. The first operation provides grant financing of US$10.0 million, comprising of US$8.0 million in a development policy grant and US$2.0 million in Cat DDO on grant terms. This operation builds on the World Bank engagement with Kiribati, as laid out in the Regional Partnership Framework (RPF) FY17-FY21, which has been extended to FY23. The proposed operation seeks to build fiscal resilience for the government, financial resilience for households, and disaster and climate resilience for the i-Kiribati communities. It seeks to improve the country’s ability to absorb and recover from shocks, without endangering its development trajectory. Fiscal resilience requires enhancing fiscal transparency, revenue generation, and public expenditures management. Household resilience is supported through financial intermediation. Disaster and climate resilience is pursued through regulatory reforms that protect the environment, improve disaster response mechanism, and build climate-resilient infrastructure, which is central to this operation as natural disasters and climate change affect poor communities disproportionately, making them prone to seek social welfare and burden the fiscal position."}},"P178883":{"id":"P178883","countryname":["Lao People's Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Reducing Rural Poverty and Malnutrition Project II (RRPM II)","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"37,000,000","boardapprovaldate":"2023-11-30T00:00:00Z","closingdate":"12/8/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178883","status":"Active","project_abstract":{"cdata!":"The development objective of Second Reducing Rural Poverty and Malnutrition Project for Lao People's Democratic Republic is to strengthen the social protection system and enhance the convergence of multisectoral interventions to improve nutrition behaviors in targeted areas, and in case of an eligible crisis or emergency, respond promptly and effectively to it. This project has five components. 1) The first component, Strengthening Social Protection Building Blocks, has the following sub-components: (i) Support regular updating of the social registry and its use by other programs; (ii) Enhancing Beneficiary Management and Payments; and (iii) Adaptive Social Protection. 2) The second component, Supporting the Implementation of the Nutrition-Sensitive Conditional Cash Transfer program, has the following sub-components: (i) Helping Hand Conditional Cash Transfer Program; and (ii) Social and Behavior Changing Communication and Village Facilitator Support. 3) The third component, Implementation Management Support & Institutional Strengthening, will finance project management costs related to operations, capacity building, and training, including financial audits, service fees for financial service providers, and implementation of environmental and social framework activities. 4) The fourth component, Enhancing the Nutrition Convergence Oversight and Coordination, aims to support the Ministry of Planning and Investment (MPI) in the overall oversight and coordination of the Nutrition Convergence program. 5) The fifth component, Contingent Emergency, aims to allow for the reallocation of financing to provide an immediate response to an eligible crisis or emergency, as needed."}},"P181081":{"id":"P181081","countryname":["Ukraine"],"lendinginstr":"Investment Project Financing","project_name":"Investing in Social Protection for Inclusion, Resilience, and Efficiency (INSPIRE) Project","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"1,200,000,000","boardapprovaldate":"2023-11-30T00:00:00Z","closingdate":"3/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181081","status":"Active","project_abstract":{"cdata!":"The objective of the Investing in Social Protection for Inclusion, Resilience, and Efficiency (INSPIRE) Project is to: (i) contribute to the sustainable provision of social assistance to vulnerable groups, and (ii) improve the coverage and efficiency of selected social safety net programs. There is one component to the project, the first component being provision of social assistance to vulnerable groups. This component will finance the selected 29 types of social benefits envisaged by five state budget programs from January 2023 to June 2024. These benefits provide support to around 2.4 million beneficiaries (individuals), including vulnerable families and children, adults and children with disabilities and caregivers, social pensioners, socially vulnerable students, and victims of human trafficking and the Chornobyl nuclear disaster. Before Russia’s invasion of Ukraine, the GoU made notable progress in strengthening the targeting of these programs and introduced means testing as an eligibility rule for several of them. The ongoing war in Ukraine exacerbates vulnerabilities and heightened economic, social, and health risks for the beneficiaries of these programs, and most of them rely on monthly social payments as their only income source to cover basic needs. Hence, sustaining the GoU’s capacity to provide social assistance under selected programs during the war is critical, particularly given these groups’ growing vulnerability to ensure their food security and safety. The estimated budget allocated by the GoU for these types of benefits for 2023 is US1 billion dollars equivalent. The project will finance expenditures on 29 selected social benefits paid through the MoSP and PFU to eligible beneficiaries (households or individuals) in compliance with the program rules and procedures outlined in the applicable laws and regulations during the 2023 calendar year and in January to June 2024. The GoU undertakes that no project proceeds or resources may be used for defense, security, or military purposes."}},"P176932":{"id":"P176932","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Digital Transformation for Africa/ Western Africa Regional Digital Integration Program SOP1","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"266,500,000","boardapprovaldate":"2023-11-30T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176932","status":"Active","project_abstract":{"cdata!":"The SOP program development objectives (PrDO) are to increase broadband access and usage in participating countries and to promote the establishment of a single digital market in Western Africa. There are six components to the project, the first component being Enabling environment for the establishment of an African SDM. This component will support AU´s strategic vision of creating an SDM in Africa by 2030 through the development of appropriate policies and regulations for coordinated digital transformation in Africa. This component includes two subcomponents: Legal and regulatory environment for a continental SDM, and Institutional capacities for a continental SDM. The second component is the connectivity market development and integration. This component aims to develop and integrate the regional connectivity market in a way that encourages private sector competition and investments. This component includes two subcomponents: legal, regulatory, and institutional capacity for telecommunications sector and digital economy, and international and core backbone network infrastructure. The third component is the data market development and integration. This component aims to build trust in online transactions and strengthen the security and resilience of digital infrastructure and systems as a prerequisite for a functional SDM. This component includes two subcomponents: data safeguards: Legal, regulatory, and institutional capacity for cybersecurity and data protection, and data enablers: Data regulations for regional data flow and data infrastructure.  The fourth component is the online market development and integration. This component aims to promote creation, access and delivery of digital goods and services seamlessly and freely across the region. This component includes three subcomponents: digital adoption for regional integration: e-commerce, digital entrepreneurship, and digital skills, access to and use of digital financial services, and digital government services for regional integration. The fifth component is the project management and implementation support. This component will finance support to the recipients’73 project management and implementation of project associated activities, including procurement, financial management (FM), monitoring and evaluation (M&E), project communication, environmental and social safeguards, and citizen engagement. Finally, the sixth component is the contingent emergency response component. The project will include a contingent emergency response component to help participating countries respond swiftly to eligible crises and emergencies."}},"P178676":{"id":"P178676","countryname":["Solomon Islands"],"lendinginstr":"Development Policy Lending","project_name":"The First Solomon Islands Resilience DPO with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2023-12-04 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2023-11-30T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178676","status":"Active","project_abstract":{"cdata!":"The development objective of The First Solomon Islands Resilience DPO with a Catastrophe Deferred Drawdown Option Project for Solomon Islands aims to support the Solomon Islands government through two series in its efforts to improve fiscal management, private sector development, and climate and disaster resilience. The series supports the government’s objective to improve fiscal management, support private sector development, enhance resilience to climate change, natural disasters and health emergencies. Pillar 1 aims to support fiscal management by reforming the tax system, improving the fiscal regime of the extractives sector and a better management of public investments. This is aligned with the government’s policy to implement tax reforms for revenue mobilization. Pillar 2 serves to improve the business environment by reducing energy costs, enhancing private sector credit and foreign investment, aligned with the government’s policy statement to create and promote more opportunities for business. Finally, pillar 3 is aligned with the government’s objective to enhance resilience to climate, natural disasters and health emergencies by updating the climate change policy, increasing resilience of buildings and improving the institutional and regulatory framework for health emergencies."}},"P177467":{"id":"P177467","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Kyrgyz Republic Air Quality Improvement Project","p2a_updated_date":"2023-12-01 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-11-29T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177467","status":"Active","project_abstract":{"cdata!":"The development objective of Air Quality Improvement Project for Kyrgyz Republic is to i) strengthen the capacity of the Kyrgyz Republic to manage air quality; and ii) reduce net PM2.5 and Greenhouse Gas (GHG) emissions in Bishkek. This project has four components. 1) Strengthen Air Quality Management System, has the following components: (i) Enhancing Ambient AQ Data Collection, Analysis, and Dissemination; and (ii) Enhancing AQ Management and Pollution Control. 2) The second component, Support the adoption of clean heating solutions, has the following sub-components: (i) Establishment of a revolving mechanizm, to provide Subsidiary Loans to PFIs for provision of Sub-loans to Beneficiaries to carry out Sub-projects; and (ii) Supporting adoption of clean heating. 3) The third component, Improve Urban Greening, has the following sub-components: (i) Supporting measures to preserve and expand urban green cover in Bishkek, including creating green belts to mitigate the impacts of windblown dust; (ii) Construction of irrigation system to ensure sustainability of urban green in Bishkek; and (iii) Strengthening institutional capacity of the municipal greening and irrigation agencies in Bishkek. 4) The fourth component, Project Implementation Support, aims to support project implementation through provision of adequate funds for the Ministry of Natural Resources, Ecology, and Technical Supervision (MNRETS) Project Implementing Unit (PIU) and Ministry of Finance (MoF) PIU operations."}},"P180287":{"id":"P180287","countryname":["Republic of Kenya"],"lendinginstr":"Program-for-Results Financing","project_name":"Second Program for Strengthening Governance for Enabling Service Delivery and Public Investment in Kenya","p2a_updated_date":"2023-12-01 00:00:00.0","totalcommamt":"250,000,000","boardapprovaldate":"2023-11-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180287","status":"Active","project_abstract":{"cdata!":"The development objective of Second Program for Strengthening Governance for Enabling Service Delivery and Public Investment in Kenya (GESDeK II) Project is to enhance revenue mobilization and deepen accountability and transparency in public finance management at the national government level. GESDeK II is organized around four Results Area (RAs) and six Disbursement-Linked Indicator (DLIs). RA 1 supports core aspects of the government’s revenue mobilization agenda. RA 2 will support efforts to strengthen the accountability and transparency of public spending. RA 3 supports efforts to strengthen national government coordination. RA 4 supports efforts to promote external audit and oversight. GESDeK II will support the implementation of the PFM Reform Strategy for 2023–2028. The PFM Reform Program has national coverage and apply to all MDAs. Among the key results areas anticipated under the new PFM Reform Strategy, GESDeK II will specifically support the ones regarding: (a) enhancing revenue mobilization; (b) strengthening accountability and transparency of public spending; (c) improving the implementation of priority programs and projects; and (d) promoting external audit and oversight. While the scope of the government’s PFM Reform Program includes the counties, GESDeK II will maintain its focus on the national level considering: (a) the selectivity that the Program is exercising regarding supporting initiatives that will have systemic impact across the public sector; and (b) there is another PforR operation (KDSP II) that will support PFM outcomes at the county level."}},"P181311":{"id":"P181311","countryname":["Islamic Republic of Mauritania"],"lendinginstr":"Investment Project Financing","project_name":"Decentralization and Productive Intermediate Cities Support Project AF","p2a_updated_date":"2023-11-30 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2023-11-29T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181311","status":"Active"},"P180547":{"id":"P180547","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Sustainable & Clean Energy Access Transformation Program Using the Multiphase Programmatic Approach","p2a_updated_date":"2023-11-30 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180547","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P179829":{"id":"P179829","countryname":["Republic of El Salvador"],"lendinginstr":"Investment Project Financing","project_name":"Promoting Job Opportunities and Skills Development in El Salvador","p2a_updated_date":"2023-11-30 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179829","status":"Active","project_abstract":{"cdata!":"The  objective of the Promoting Job Opportunities and Skills Development Project is to improve access to employment opportunities and skills development of selected vulnerable groups of El Salvador, and in case of an eligible crisis or emergency, respond promptly and effectively to it.  There are five components to the project, the first component being aims to improve access to and delivery of demand-driven skills, promote entry to private sector jobs, and enhance the employment support ecosystem. This component includes three subcomponents: enhancing access to and delivery of demand-driven skills for employability, promoting access to private sector jobs, and enhancing the employment support ecosystem. The second component is the promoting entrepreneurship opportunities. The component will support entrepreneurship development of startups and existing businesses led by youth and young adult entrepreneurs. This component includes two subcomponents: skills training and technical support for entrepreneurship, and entrepreneurship financing through entrepreneur grants. The third component is the enhancing access to integrated service delivery through adequate infrastructure. The component will implement a service delivery modality to facilitate the integration of and access to interventions under components 1 and 2, through adequate infrastructure in selected areas. The fourth component is the project management, monitoring and evaluation, and institutional strengthening. This component includes two subcomponents: strengthening of MINEC for project management, monitoring and evaluation (US9.13 million dollars). The subcomponent will finance a dedicated Project Implementation Unit (PIU) in MINEC and administrative and technology support; and strengthening of BANDESAL to support payment of project benefits (US1.23 million dollars). This subcomponent will expand the institutional capacity of BANDESAL to deliver payments to project beneficiaries, while leveraging its experience and know-how. Finally, the fifth component is the contingent emergency response component. This component will provide immediate response to an eligible crisis or emergency, as needed. An eligible crisis or emergency is an event that has caused, or is likely to imminently cause, a major adverse economic and/or social impact associated with natural or man-made crises or disasters."}},"P180575":{"id":"P180575","countryname":["Republic of Rwanda"],"lendinginstr":"Investment Project Financing","project_name":"Rwanda - Accelerating Sustainable and Clean Energy Access Transformation in AFE MPA (ASCENT - Rwanda))","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180575","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P179631":{"id":"P179631","countryname":["United Republic of Tanzania"],"lendinginstr":"Program-for-Results Financing","project_name":"TANZANIA Accelerating Sustainable and Clean Energy Access Transformation in Eastern and Southern Africa Program","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179631","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P180723":{"id":"P180723","countryname":["Solomon Islands"],"lendinginstr":"Investment Project Financing","project_name":"Building Capacity in Statistics and Audit Project","p2a_updated_date":"2023-11-30 00:00:00.0","totalcommamt":"6,500,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/28/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180723","status":"Active"},"P179037":{"id":"P179037","countryname":["Republic of Peru"],"lendinginstr":"Investment Project Financing","project_name":"Irrigation for Climate Resilient Agriculture","p2a_updated_date":"2023-11-30 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179037","status":"Active","project_abstract":{"cdata!":"The objective of the Irrigation for Climate Resilient Agriculture Project for Peru is to improve the sustainability and efficacy of water services for irrigation and the productivity of water on family farms in selected areas that are vulnerable to climate change. There are three components to the project, the first component being technified irrigation projects. This component aims to improve water delivery services for irrigation and agricultural water productivity in 130 selected and prioritized subprojects covering a total of 8,014.38 hectares, involving 130 FGs (GGRTs) and serving 7,767 producer households (thereby reaching an estimated total of 24,128 beneficiaries). This component includes three subcomponents: modernization of communal (off-farm) irrigation systems, irrigation technology improvement (on-farm irrigation systems), and technical assistance and capacity building to FGS (GGRTs). The second component is the other Initiatives: institutional strengthening for effective and sustainable irrigation services. This component includes two subcomponents: strengthening WUOs for Improved management of reliable and sustainable water services for irrigation; and TA to subnational governments for the scaling up of improved irrigation investments. Finally, the third component is the project management and interagency coordination. This component includes activities to support the administration of the Project and the strengthening of the PSI, the PIU. The component will support capacity building on financial, environmental, social, and technical management as well as M&E. In addition, this component will include activities to promote coordination between project and existing government entities (e.g., ANA), other government programs (such as Sierra-Selva Exportadora, AGROIDEAS, AGRORURAL, etc.), and programs that involve NGOs, farmers associations, and universities. Selection criteria and draft templates for the corresponding cooperation arrangements between the project and ongoing programs will be detailed in the project operation manual."}},"P181328":{"id":"P181328","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Sustainable and Clean Energy Access Transformation   - Regional Energy Access Financing Platform","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"275,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181328","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P177099":{"id":"P177099","countryname":["Democratic Republic of Sao Tome and Prin"],"lendinginstr":"Investment Project Financing","project_name":"Access to Clean Resilient Electricity under the ASCENT Regional Program - Multi Programmatic Approach (MPA)","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"38,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177099","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P181341":{"id":"P181341","countryname":["Somali Democratic Republic"],"lendinginstr":"Investment Project Financing","project_name":"Accelerating Sustainable and Clean Energy Access Transformation in SOMALIA","p2a_updated_date":"2023-12-07 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"11/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181341","status":"Active","project_abstract":{"cdata!":"The objective of the Accelerating Sustainable and Clean Energy Access Transformation Program using the Multiphase Programmatic Approach Project, to which participating countries and regional institutions will contribute, is to increase access to sustainable and clean energy in Eastern and Southern African countries. There are five components to the project, the first component being Digital Monitoring, Reporting, and Verification (D-MRV) platforms for energy access and climate finance. The second component is the Project Preparation Facility (PPF). This component includes three subcomponents: Project development support to national agencies, Cross-border solutions, and Support to private-sector DRE and clean cooking companies. The third component is the advisory support facility. This component will support participating countries on strengthening the policy and regulatory environment for energy access. The fourth component is the knowledge exchange, skills development, consumer engagement, convening and partnerships. This component will build data, knowledge, and skills for energy-access planners, funders, and providers, as well as their current and prospective employees and energy-access consumers. Finally, the fifth component is the project management and capacity-building support to the COMESA Project implementation unit. This component will provide the COMESA PIU specific support for building capacity to implement and monitor activities under the regional Platform and strengthen capacities in specific areas, including DRE, E&S, and gender."}},"P180302":{"id":"P180302","countryname":["Dominican Republic"],"lendinginstr":"Investment Project Financing","project_name":"Support for the Implementation of the Public Administration Reform and Modernization Plan","p2a_updated_date":"2023-11-29 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-11-28T00:00:00Z","closingdate":"5/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180302","status":"Active","project_abstract":{"cdata!":"The objective of the Support for the Implementation of the Public Administration Reform and Modernization Plan Project for Dominican Republic is to improve the efficiency, accessibility, and responsiveness of selected administrative services for citizens and businesses. There are four components to the project, the first component being enabling environment for better administrative services. This component seeks to establish the technical, institutional, legal, and regulatory foundations for modern and efficient administrative services. The second component is the coordination and interoperability. This component seeks to modernize core public administration back-office operations to facilitate coordination, planning and interoperability among Government agencies. The third component is the modernization and innovation in service delivery. This component seeks to support the development and adoption of tools and procedures to engage citizens and businesses in the design of selected administrative services and delivery channels that are more effective in responding to the needs of users and especially women and vulnerable groups. Finally, the fourth component is the capacity building and project management. This component seeks to build capacity and raise awareness of all stakeholders to facilitate delivery and use of administrative services and delivery channels that are more user friendly."}},"P179108":{"id":"P179108","countryname":["Republic of Uzbekistan"],"lendinginstr":"Investment Project Financing","project_name":"Uzbekistan Digital Inclusion Project","p2a_updated_date":"2023-11-29 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-11-27T00:00:00Z","closingdate":"1/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179108","status":"Active","project_abstract":{"cdata!":"The development objective of Digital Inclusion Project is to support digital inclusion by expanding access to skills and employment opportunities in the digital economy. This project has three components. 1) The first component, Digital Inclusion and Enabling Environment, has the following sub-components: (i) Skills Development; and (ii) Modernization of Legal, Regulatory and Institutional Frameworks. 2) The second component, Development of country-wide regional infrastructure and incentives for IT-enabled services (ITES), has the following sub-components: (i) ITES Incentives Program; and (ii) ITES Infrastructure Development. 3) The third component, Location Attractiveness Promotion, has the following sub-components: (i) ITES Industry Promotion and Location Attractiveness; (ii) ITES Strategy and Institutional Development; and (iii) Project Implementation Unit (PIU) Support."}},"P178668":{"id":"P178668","countryname":["Republic of Mozambique"],"lendinginstr":"Development Policy Lending","project_name":"Mozambique Second Institutions and Economic Transformation DPF","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-11-22T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178668","status":"Active","project_abstract":{"cdata!":"The development objectives of the Second Institutions and Economic Transformation Development Policy Financing for Mozambique are to: (i) strengthen budget institutions and responsibility; (ii) improve the investment climate and financial access; and (iii) promote resilient and low-carbon growth potential. These three pillars complement and reinforce each other. First, greater fiscal responsibility will improve investor confidence and support private sector-led growth. Second, an improved business environment that attracts investment and facilitates access to credit will help strengthen the fiscal position. Third, Mozambique’s emboldened climate change commitments and improved financial position of public utilities will reassure investors, enabling access to climate finance and supporting resilient and low-carbon development path."}},"P181219":{"id":"P181219","countryname":["Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Central Asia South Asia Electricity Transmission and Trade (CASA-1000) Project for Republic of Tajikistan","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"11,000,000","boardapprovaldate":"2023-11-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181219","status":"Active"},"P181346":{"id":"P181346","countryname":["Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing CASA-1000 Community Support Project Tajikistan","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"10,000,000","boardapprovaldate":"2023-11-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181346","status":"Active"},"P178417":{"id":"P178417","countryname":["Kingdom of Cambodia"],"lendinginstr":"Investment Project Financing","project_name":"Water Supply and Sanitation Acceleration Project","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"163,000,000","boardapprovaldate":"2023-11-21T00:00:00Z","closingdate":"12/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178417","status":"Active","project_abstract":{"cdata!":"The development objective of Water Supply and Sanitation Acceleration Project for Cambodia is to increase access to safely managed water supply and sanitation services in selected areas, strengthen institutions for water supply and sanitation service delivery, and in case of an eligible crisis or emergency, respond promptly and effectively to it. This project has three components. 1) The first component, Province-wide Water Supply Development, has the following sub-components. (i) Water Supply Expansion and Modernization of Public Water Utilities in the Battambang, Pursat and Mondul Kiri Provinces; (ii) Water Supply System Development and Improvement Outside Service Areas of Public Water Utilities in the Battambang and Pursat Provinces; and (iii) Water Supply Institutional Strengthening, Capacity Building, and Project Management. 2) The second component, Provincial Municipality Sanitation Development, has the following sub-components: (i) Sanitation System Development in the Battambang, Pursat, and Ta Khmau Municipalities; and (ii) Sanitation Institutional Strengthening and Project Management. 3) The third component, Contingent Emergency Response, aims to provide immediate response to an eligible crisis or emergency, as needed."}},"P178644":{"id":"P178644","countryname":["Republic of Cabo Verde"],"lendinginstr":"Investment Project Financing","project_name":"Improving Connectivity and Urban Infrastructure in Cabo Verde","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-11-21T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178644","status":"Active","project_abstract":{"cdata!":"The development objective of Improving Connectivity and Urban Infrastructure in Cabo Verde Project is to improve access to climate-resilient transport and urban infrastructure for selected project areas in the recipient's territory. This project has five components. 1) The first component, Enhancing Resilient Urban and Community Infrastructure, aims to rehabilitate public spaces and upgrade key public assets to maximize climate change adaptation and low-carbon economic development. 2) The second component, Enhancing Transport Connectivity and Resilience, aims to finance climate-informed rehabilitation and upgrading of inter-city and rural roads, with the objective of ensuring reliable all-season connectivity and access to transport services and reduce transport costs in project areas in Cabo Verde. 3) The third component, Technical Assistance, aims to provide support for capacity building and technical assistance activities for improved, climate resilient low-carbon integrated urban and transport planning, intermodal connectivity, and transport asset management. 4) The fourth component, Project Management, aims to provide support for the management and implementation of the proposed project. 5) The fifth component, Contingent Emergency Response Component (CERC), aims to provide an immediate response to an eligible crisis or emergency, as needed, by financing the implementation of emergency infrastructure rehabilitation and reconstruction."}},"P180638":{"id":"P180638","countryname":["Oriental Republic of Uruguay"],"lendinginstr":"Investment Project Financing","project_name":"Institutional Strengthening for Greater Competitiveness in Uruguay","p2a_updated_date":"2023-11-23 00:00:00.0","totalcommamt":"16,000,000","boardapprovaldate":"2023-11-21T00:00:00Z","closingdate":"3/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180638","status":"Active"},"P177748":{"id":"P177748","countryname":["Republic of The Gambia"],"lendinginstr":"Development Policy Lending","project_name":"Gambia First Boosting Resilience and Unlocking Productive Potential DPF with Cat DDO","p2a_updated_date":"2023-11-22 00:00:00.0","totalcommamt":"60,000,000","boardapprovaldate":"2023-11-20T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177748","status":"Active","project_abstract":{"cdata!":"The development objective of First Boosting Resilience and Unlocking Productive Potential Development Policy Financing with a Catastrophe Deferred Drawdown Option Project is to support The Gambia’s efforts to (i) unlock its productive potential; (ii) strengthen procurement, economic governance of SOEs, and domestic revenue mobilization; and (iii) strengthen climate and social resilience. This operation is the first in a programmatic series of two single-tranche DPF operations designed to boost The Gambia’s resilience to shocks and unlock its productive potential in the medium term. The reform program is based on three pillars: Pillar 1 – Unlocking the productive potential. Reforms aim to tackle bottlenecks in key enabling sectors by supporting the diversification of the energy mix while creating the conditions for private sector participation in the energy sector, facilitating agri-food development and exports, fostering competition, and leveling the playing field in the groundnut sector. Reform measures will, for example, focus on creating the conditions for enabling the use of digital and electronic payments. Pillar 2 – Strengthening procurement, economic governance of SOEs and domestic revenue mobilization. Reforms aim to build fiscal space and improve transparency and efficiency in the use of public resources and institutions by strengthening the efficiency of the procurement system, improving competitive neutrality, enhancing the governance, performance, and oversight of state-owned enterprises (SOEs), and boosting domestic revenue collection, with the aim to build the capacity of The Gambia to absorb shocks while improving debt sustainability. Pillar 3 – Strengthening climate and social resilience. Reforms aim to strengthen The Gambia’s adaptation and resilience to climate change. Reform efforts primarily focus on improving the disaster risk management (DRM) and financing framework and the adaptive social protection system, ensuring that the needs of especially women and girls are met. The DPF series is aligned with the priorities of the Country Partnership Framework (CPF) and the SCD."}},"P500589":{"id":"P500589","countryname":["Republic of Malawi"],"lendinginstr":"Investment Project Financing","project_name":"De-risking Importation of Strategic Commodities","p2a_updated_date":"2023-11-21 00:00:00.0","totalcommamt":"0","boardapprovaldate":"2023-11-20T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P500589","status":"Active","project_abstract":{"cdata!":"The development objective of De-risking Importation of Strategic Commodities Project is to increase supply of trade finance for importation of essential commodities to Malawi. This project has a single component, Trade Facility for imports, with a Deferred Drawdown Option (DDO), through which the World Bank will provide contingent financing to backstop the payment obligations of local issuing banks to their correspondent confirming banks."}},"P179338":{"id":"P179338","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Program-for-Results Financing","project_name":"Côte d'Ivoire Rural Land Tenure Management Strengthening Program","p2a_updated_date":"2023-11-20 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-11-17T00:00:00Z","closingdate":"2/1/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179338","status":"Active","project_abstract":{"cdata!":"The development objectives of Rural Land Tenure Management Strengthening Program Project for Côte d'Ivoire are to: digitize and increase coverage of customary rural land administration systems and increase customary land registration efficiency and inclusivity. The Program builds on the World Bank’s experience of financing and strengthening local government and land registration globally through Program-for-Results (PforRs).  The PforR will prioritize expanding landholder access to customary land registration in areas aligned with the CPF objectives and priorities: source regions for sustainable value chains, conflict-affected regions, and economically lagging regions. High social risk activities that may increase social tensions and/or result in involuntary resettlement are excluded from the PforR, including land titling (Results Area [RA] 2), titling public lands in the name of the State (RA1), and reforms that restrict access to formal land use contracts (RA1). This Program is aligned with the World Bank Country Partnership Framework (CPF) FY23-27."}},"P180027":{"id":"P180027","countryname":["Plurinational State of Bolivia"],"lendinginstr":"Investment Project Financing","project_name":"Bolivia Improving Sustainable Access to Electricity Project (IDTR III)","p2a_updated_date":"2023-11-20 00:00:00.0","totalcommamt":"125,000,000","boardapprovaldate":"2023-11-16T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180027","status":"Active","project_abstract":{"cdata!":"The development objective of the Improving Sustainable Access to Electricity Project for Bolivia is to expand and improve access to sustainable electricity services in rural areas of Bolivia. The project comprises of three components. The first component, expand and improve access to sustainable electricity services in rural areas supports interventions to expand and improve access to electricity services for households, public institutions, and small-scale productive uses through grid extensions, and other technological solutions such as standalone photovoltaic (PV), mini-grid systems powered by renewable energy. It consists of following sub-components: (i) grid extension for households; and (ii) grid extension for productive uses. The second component, strengthen the electricity sector will focus on strengthening the Vice Ministry of Electricity and Renewable Energy (VMEER’s) capacities by supporting analytical work to enhance the overall sustainability, climate mitigation, and resilience and decarbonization of the energy sector. It consists of following sub-components: (i) policy support towards a just energy transition; and (ii) strengthening of the distribution sector. The third component, project implementation support will support overall project management and facilitate resources within the electricity program for living with dignity (PEVD) and National Electricity Company (ENDE) for the implementation of components 1 and 2. It consists of following sub-components: (i) project management and coordination; and (ii) maximizing project impact."}},"P180585":{"id":"P180585","countryname":["Republic of the Philippines"],"lendinginstr":"Development Policy Lending","project_name":"Philippines Disaster Risk Management and Climate Development Policy Loan with a Catastrophe Deferred-Drawdown Option","p2a_updated_date":"2023-11-17 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2023-11-16T00:00:00Z","closingdate":"12/31/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180585","status":"Active","project_abstract":{"cdata!":"The development objective of the Disaster Risk Management and Climate Development Policy Loan with a Catastrophe Deferred Drawdown Option for Philippines is to strengthen the Government of the Philippines’ capacity to manage disaster and climate risks, including those in the education, human settlements, and health systems. The project includes following pillars: pillar a: strengthening the resilience of the education system; pillar b: strengthening the resilience of the human settlements system; and pillar c: strengthening the resilience of the health system."}},"P179367":{"id":"P179367","countryname":["Oriental Republic of Uruguay"],"lendinginstr":"Development Policy Lending","project_name":"Uruguay Green and Resilient Growth Development Policy Loan","p2a_updated_date":"2023-11-20 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2023-11-16T00:00:00Z","closingdate":"11/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179367","status":"Active","project_abstract":{"cdata!":"The development objective of the Green and Resilient Growth Development Policy Loan for Uruguay is to promote: (i) greening of the economy, and (ii) stronger and more resilient growth. The two pillars of this operation support these efforts by endorsing measures that mitigate greenhouse gas (GHG) emissions and promote biodiversity, which contribute to global public goods and underpin the country’s brand on climate stewardship, increasingly important for its integration into the global economy. This operation also promotes institutional strengthening and structural measures that advance competitiveness and resilience in the face of negative shocks, a critical contribution coming out of the Coronavirus disease (COVID) pandemic, which followed years of sluggish growth and stagnating productivity due to long-standing growth bottlenecks."}},"P179182":{"id":"P179182","countryname":["Federative Republic of Brazil"],"lendinginstr":"Development Policy Lending","project_name":"Rio de Janeiro Fiscal Management and Sustainable Development Policy Loan","p2a_updated_date":"2023-11-17 00:00:00.0","totalcommamt":"135,240,000","boardapprovaldate":"2023-11-16T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179182","status":"Active","project_abstract":{"cdata!":"The development objective of the Rio De Janeiro Fiscal Management and Sustainable Development Policy Loan for Brazil is to support the Municipality of Rio de Janeiro in: (i) strengthening fiscal management to improve medium-term fiscal sustainability; and (ii) accelerating the transition towards a low-carbon, resilient and inclusive urban development. Pillar 1 is related to the PE and PPA area of governance, as it supports the strategic initiatives to strengthen fiscal responsibility and increase the accountability and efficiency of public spending. Pillar 2 supports several initiatives across the six strategic areas under the PE and PPA, including: quality of the transport system and public space, safe traffic and transportation, women and gender equity, downtown revival (Reviver Centro), low emission district and climate management, and resilience and risk management."}},"P180872":{"id":"P180872","countryname":["Republic of Panama"],"lendinginstr":"Investment Project Financing","project_name":"Consolidation of the Panama Public Financial Management Information System","p2a_updated_date":"2023-11-16 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-11-14T00:00:00Z","closingdate":"12/15/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180872","status":"Active","project_abstract":{"cdata!":"The development objective of Consolidation of the Panama Public Financial Management Information System Project is to improve the operational efficiency and quality of information of public financial management in the Republic of Panama. This project has four components. 1) The first component, Consolidating Core Public Financial Management Functions, has the following sub-components: (i) Strengthening PFM governance framework; (ii) Strengthening core PFM processes, methodologies, capabilities, and information systems; and (iii) Improving integration within the PFM ecosystem. 2) The second component, Administrative and Resource Management Functions, has the following sub-components: (i) Strengthening public asset management; (ii) Modernizing government payroll management; (iii) Modernizing customs administration; and (iv) Strengthening public investment management. 3) The third component, Cybersecurity and IT Management, has the following sub-components: (i) Strengthening the MEF’s capabilities to protect information resources; and (ii) Strengthening the MEF’s IT Management capabilities. 4) The fourth component, Fiscal Transparency, Reform Sustainability and Project Management, has the following sub-components: (i) Reform sustainability; (ii) Fiscal transparency; and (iii) Project management."}},"P181184":{"id":"P181184","countryname":["Republic of Congo"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing to the Climate-Resilient and Inclusive Livelihoods Project","p2a_updated_date":"2023-11-13 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-11-10T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181184","status":"Active"},"P178274":{"id":"P178274","countryname":["Republic of Turkiye"],"lendinginstr":"Investment Project Financing","project_name":"Green Finance Project","p2a_updated_date":"2023-11-10 00:00:00.0","totalcommamt":"155,000,000","boardapprovaldate":"2023-11-09T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178274","status":"Active","project_abstract":{"cdata!":"The development objective of the Green Finance Project for Türkiye is to support the greening of firms through equity financing and mobilized private capital and expand climate financing in Türkiye’s capital markets. The project has a single component under which International Bank for Reconstruction and Development (IBRD) will lend to Türkiye Sınai Kalkınma Bankası (TSKB) (as borrower) and TSKB (in its capacity as sponsor and Limited Partner) will use the funds to partially capitalize a Türkiye Green Fund (TGF), which will in turn provide equity financing to green and greening companies."}},"P180861":{"id":"P180861","countryname":["Democratic Socialist Republic of Sri Lan"],"lendinginstr":"Investment Project Financing","project_name":"Financial Sector Safety Net Strengthening Project","p2a_updated_date":"2023-11-13 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-11-09T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180861","status":"Active","project_abstract":{"cdata!":"The objective of the Financial Sector Safety Net Strengthening Project is to strengthen the financial and institutional capacity of Sri Lanka's financial sector safety net, with the focus on the deposit insurance scheme. There are three components to the project, the first component being capitalization of Sri Lanka deposit insurance scheme. The first component will finance the reserves of SLDIS. The disbursement under this component will be based on results and eligible expenditures, linked to the progress in SLDIS’s institutional reform. As in other WB projects of this nature, the use of WB credit proceeds towards the deposit insurance scheme reserves will constitute the eligible expenditure, irrespective of whether or not these reserves later on will need to be deployed for insured deposit payout or contributing to bank resolution. The second component is the institutional capacity building for CBSL. This component will finance technical assistance activities to address the large capacity building requirements identified in the recent IADI CP assessment. Finally, the third component is the project implementation and monitoring. This component aims to provide support to the CBSL for effective project implementation, in line with the WB’s applicable standards of financial management (FM), procurement, social and environmental risk management, monitoring and evaluation (M&E), and reporting. It will finance the operations of the small project implementation unit (PIU) under CBSL auspices, including staff responsible for project coordination, financial management, procurement, and monitoring and evaluation. PIU will be responsible for general project coordination, ensuring compliance with WB’s fiduciary and Environmental & Social (E&S) requirements, and monitoring and reporting the project results."}},"P179804":{"id":"P179804","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Africa Think Tank Platform Project","p2a_updated_date":"2023-11-03 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-11-02T00:00:00Z","closingdate":"8/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179804","status":"Active","project_abstract":{"cdata!":"The development objective of the Think Tank Platform Project for Africa is to establish a sustainable platform to strengthen the capacity for effective policy research and policy making on cross-boundary priorities in Africa. The project comprises of three components. The first component, establish capacity to operate a sustainable policy making platform will develop the capacity of the African Union Commission (AUC) to create and set up the structures and systems necessary to operate a continent-wide platform that brings together a wide variety of stakeholders to support economic policy making across the region. The second component, strengthen the quality, relevance, and uptake of policy research on priority issues will support activities to improve the quality and relevance of policy research on continental priority issues and facilitate its dissemination and utilization to inform policy making by countries across the continent and beyond. The third component, support platform sustainability objective is to develop the capacity of the AUC to mobilize resources and establish facilities to crowd-in funds from a variety of stakeholders to support the sustainability of the platform and policy research over the long term."}},"P181218":{"id":"P181218","countryname":["Central Asia"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Central Asia South Asia Electricity Transmission and Trade (CASA-1000) Project for Kyrgyz Republic","p2a_updated_date":"2023-11-02 00:00:00.0","totalcommamt":"18,300,000","boardapprovaldate":"2023-11-01T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181218","status":"Active"},"P181086":{"id":"P181086","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Technical Assistance for Kambarata 1 Hydropower Plant Project","p2a_updated_date":"2023-11-01 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2023-10-31T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181086","status":"Active","project_abstract":{"cdata!":"The development objective of the Technical Assistance for Kambarata 1 Hydropower Plant (HPP) Project for Kyrgyz Republic is to assess the Kambarata 1 HPP project’s technical feasibility, enhance its environmental and social sustainability, and strengthen its financial and commercial frameworks. The project comprises of four components. The first component is updating previous studies to verify the technical feasibility and economic viability. The second component is strengthening the environmental and social framework (ESF) and benefit-sharing aspect of Kambarata 1 HPP. The third component is developing a macroeconomically sustainable financing plan and a commercial framework. The fourth component is project implementation support and capacity building."}},"P178133":{"id":"P178133","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Bangladesh Enhancing Investments and Benefits for Early Years (BEIBEY) Project","p2a_updated_date":"2023-11-01 00:00:00.0","totalcommamt":"210,000,000","boardapprovaldate":"2023-10-31T00:00:00Z","closingdate":"10/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178133","status":"Active","project_abstract":{"cdata!":"The development objective of the Enhancing Investments and Benefits for Early Years (BEIBEY) Project for Bangladesh is to provide consumption support to vulnerable households with pregnant women and mothers of children under 4 years of age and increase knowledge of nurturing care services that contribute to early childhood development (ECD). The project comprises of three components. The first component will support expanding coverage of the mother and child benefit program (MCBP) and strengthening program systems. The second component, supporting implementation of the MCBP consists of following sub-components: (i) enhancing MCBP outreach and monitoring; and (ii) project implementation, monitoring, and coordination. The third component, contingent emergency response is included for situations of urgent need of assistance. In the event of an eligible crisis or emergency, the component will contribute to providing an immediate and effective response."}},"P178720":{"id":"P178720","countryname":["Republic of El Salvador"],"lendinginstr":"Investment Project Financing","project_name":"El Salvador Transport and Resilient Infrastructure Project","p2a_updated_date":"2023-11-01 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-10-30T00:00:00Z","closingdate":"12/28/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178720","status":"Active","project_abstract":{"cdata!":"The objective of the Transport and Resilient Infrastructure Project for El Salvador is to (i) improve resilient connectivity in targeted areas of the Northern Metropolitan Area of San Salvador, (ii) enhance sustainable national road sector management and (iii) in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. There are four components to the project, the first component being connectivity improvement for the Northern Metropolitan Area of San Salvador. This component seeks to strengthen the road infrastructure in northern Metropolitan Area of San Salvador including the municipalities Apopa, Tonacatepeque, and Ciudad Delgado by building a bypass and implementing complementary road safety and resilient connectivity interventions in the area. The second component is the institutional capacity building for a climate-resilient, safe, and inclusive road infrastructure. This component will implement capacity-building activities to strengthen GoES institutional capacity in managing the national road network. The third component is the project management. This subcomponent will strengthen the MOPT’s implementation capacity, by providing support for, inter-alia: (i) project management and coordination; (ii) monitoring result evaluation and impact assessment activities; (iii) fiduciary administration and oversight, internal controls, and project financial and technical audits; (d) MOPT’s systems for environmental and social standards risk management; (iv) outreaching stakeholders for awareness on the project, citizen engagement and establishment of grievance mechanisms; and (v) training of the PIU staff, including on fiduciary and environmental and social matters. Finally, the fourth component is the Contingency Emergency Response Components (CERC) (with an initial zero-dollar allocation)."}},"P180732":{"id":"P180732","countryname":["Ukraine"],"lendinginstr":"Investment Project Financing","project_name":"Ukraine Agriculture Recovery Inclusive Support Emergency (ARISE) Project","p2a_updated_date":"2023-10-31 00:00:00.0","totalcommamt":"550,000,000","boardapprovaldate":"2023-10-30T00:00:00Z","closingdate":"9/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180732","status":"Active"},"P180619":{"id":"P180619","countryname":["Republic of Serbia"],"lendinginstr":"Investment Project Financing","project_name":"Serbia Noncommunicable Diseases Prevention and Control Project","p2a_updated_date":"2023-10-30 00:00:00.0","totalcommamt":"75,000,000","boardapprovaldate":"2023-10-27T00:00:00Z","closingdate":"3/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180619","status":"Active"},"P181345":{"id":"P181345","countryname":["Republic of Kenya"],"lendinginstr":"Investment Project Financing","project_name":"SECOND ADDITIONAL FINANCING FOR KENYA WATER SECURITY AND CLIMATE RESILIENCE PROJECT","p2a_updated_date":"2023-10-30 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2023-10-27T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181345","status":"Active"},"P178993":{"id":"P178993","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Mato Grosso Resilient, Inclusive, and Sustainable Learning Project","p2a_updated_date":"2023-10-30 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-10-26T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178993","status":"Active"},"P179214":{"id":"P179214","countryname":["Republic of Peru"],"lendinginstr":"Development Policy Lending","project_name":"Peru: Enabling a Green and Resilient Development DPF - DDO II","p2a_updated_date":"2023-10-27 00:00:00.0","totalcommamt":"750,000,000","boardapprovaldate":"2023-10-26T00:00:00Z","closingdate":"11/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179214","status":"Active"},"P178831":{"id":"P178831","countryname":["Republic of Tajikistan"],"lendinginstr":"Investment Project Financing","project_name":"Tajikistan Millati Solim Project","p2a_updated_date":"2023-10-26 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-10-24T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178831","status":"Active"},"P179077":{"id":"P179077","countryname":["Republic of South Africa"],"lendinginstr":"Development Policy Lending","project_name":"South Africa Sustainable and Low-Carbon Energy Transition Development Policy Loan","p2a_updated_date":"2023-10-25 00:00:00.0","totalcommamt":"1,000,000,000","boardapprovaldate":"2023-10-24T00:00:00Z","closingdate":"2/28/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179077","status":"Active"},"P180361":{"id":"P180361","countryname":["Republic of Ecuador"],"lendinginstr":"Investment Project Financing","project_name":"Ecuador Inclusive and Resilient Housing and Urban Development Project","p2a_updated_date":"2023-10-09 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-10-05T00:00:00Z","closingdate":"3/13/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180361","status":"Active","project_abstract":{"cdata!":"The development objective of Ecuador Inclusive and Resilient Housing and Urban Development Project is to (i) improve access to affordable and resilient housing to low-income segments of the population and improve urban infrastructure and services in selected Ecuadorian settlements; (ii) strengthen the capacity of the Government of Ecuador (GoE) to implement and scale affordable housing and settlement upgrading policies and instruments; and (iii) in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. This project has four components. 1) The first component, Provision of affordable and resilient housing for vulnerable households, has the following sub-components: (i) Upfront subsidies for the construction of new housing on urban areas; and (ii) Upfront partial subsidies for the acquisition of new housing on urban areas. 2) The second component, Sustainable habitat improvement in targeted neighborhoods, has the following sub-components: (i) Infrastructure and basic services; and (ii) Technical Studies and Designs and Community and Local Government Strengthening. 3) The third component, Contingent Emergency Response, will enable a speedy response to disaster, as needed. 4) The fourth component, Institutional Strengthening and Project Management, will finance (i) studies, analytical activities, and capacity support of national and subnational governments’ capacities for the efficient and scalable implementation of habitat, land and housing policies and projects and (ii) support Project management."}},"P178567":{"id":"P178567","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Piauí Health and Social Protection Development Project","p2a_updated_date":"2023-10-09 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-10-05T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178567","status":"Active","project_abstract":{"cdata!":"The objective of the Piauí Health and Social Protection Development Project is to strengthen health surveillance, social protection, and employment service delivery systems to benefit the Borrower’s vulnerable population. There are four components to the project, the first component being strengthening health surveillance systems and capacities. This component aims to strengthen the state health surveillance systems and capacities by improving their structures and introducing coordination and management mechanisms for service provision, focused on priority populations and regions of the state with weaker services. The second component is the strengthening social protection systems and capacities. This component aims to improve the state social protection and employment service delivery systems and capacities by strengthening benefits of social assistance for those in immediate need, structuring services to promote economic opportunities, and improving the state’s ability to play a more effective role in overseeing and supporting the social protection and labor activities in the state, especially to respond more effectively to economic, social, and climate-related shocks. The third component is the strengthening food and nutrition surveillance and food security response. This component responds to the growing challenge, including due to climate impacts, of food insecurity in Piauí, requiring a coordinated approach. Finally, the fourth component is the project management. This component aims to strengthen the capacity of state agencies and provide overall implementation support to the Project Coordination Unit (Unidade de Coordenação do Projeto, PCU) and Project Implementation Unit (Unidades de Implementação do Projeto, PIU) in technical, environmental, social, fiduciary, supervision, monitoring and evaluation (M&E), and communications-related areas, including training and operating costs."}},"P178663":{"id":"P178663","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Progestão Piauí: Public Sector Management Efficiency","p2a_updated_date":"2023-10-05 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-10-03T00:00:00Z","closingdate":"6/29/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178663","status":"Active","project_abstract":{"cdata!":"The development objective of the Progestão Piauí: Public Sector Management Efficiency Project for Brazil is to improve efficiency in public resource management in selected departments of the State of Piauí. The project comprises of three components. The first component, whole-of-government management systems consists of following sub-components: (i) human resource management; (ii) pensions management; (iii) public procurement; (iv) public investment management and budgeting; and (v) asset management. The second component, management systems in strategic sectors consists of following sub-components: (i) health; (ii) education; and (iii) social assistance. The third component, project and change management consists of following sub-components: (i) project management unit; and (ii) change management."}},"P178161":{"id":"P178161","countryname":["Republic of Rwanda"],"lendinginstr":"Investment Project Financing","project_name":"Volcanoes Community Resilience Project","p2a_updated_date":"2023-10-04 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-10-02T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178161","status":"Active","project_abstract":{"cdata!":"The objective of the Volcanoes Community Resilience Project for Rwanda is to reduce the risk of flooding, strengthen watershed management, and improve livelihoods of people in the project area. There are five components to the project, the first component being flood risk management. This component seeks to reduce flood risks in the Volcano and Vunga corridor by implementing comprehensive flood risk reduction interventions and by improving flood early warning systems (FEWS) and community-level flood preparedness. This component includes two subcomponents: flood risk reduction investments, and flood early warning system (FEWS) and community-level flood preparedness. The second component is the landscape restoration and catchment management. This component supports landscape restoration and catchment management interventions aimed at improving livelihoods; reducing surface runoff and erosion; and enhancing efforts to restore and protect biodiversity in the region. This component includes three subcomponents: integrated catchment and landscape restoration, and ecological restoration of priority conservation areas, and livelihoods diversification. The third component is the VNP expansion and livelihood restoration. This component includes two subcomponents: VNP expansion, and a model smart green village, and livelihood diversification and income generation activities. The fourth component is the project management, monitoring and evaluation, and capacity building. This component will finance project management costs of the implementing agencies, notably the Project Implementation Units (PIUs), for core staff in project coordination, environmental and social (E&S) risks management, FM, procurement, and M&E, including a midterm review, and end-project completion report. Finally, the fifth component is the contingent emergency response component."}},"P180127":{"id":"P180127","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Health Emergency Preparedness, Response and Resilience Program Using the Multiphase Programmatic Approach","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"359,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"3/31/2030 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180127","status":"Active","project_abstract":{"cdata!":"The development objective of the Health Emergency Preparedness, Response, and Resilience Program Using the Multiphase Programmatic Approach (MPA) Project is to strengthen health system resilience and multisectoral preparedness and response to health emergencies in Eastern and Southern Africa. There are four components to the project, the first component being strengthening the preparedness and resilience of regional and national health systems to manage health emergencies. This component will finance capacity strengthening of essential institutions, and activities that directly contribute to the resilience of the health systems to cope with HEs and are complementary to other health systems strengthening (HSS). This will have four subcomponents: (i) multisectoral and cross-border planning, financing, and governance; (ii) health workforce development, including a focus on identifying and addressing gender gaps in career progression; (iii)  access to quality health commodities, including building capacity for local vaccine and pharmaceutical manufacturing, based on the lessons learned from the challenges in accessing COVID-19 vaccines in the region; and (iv) information systems for HEs and the digitalization. The second component is the improving the detection of and response to HEs through a multisectoral approach. the third component is the program management. The component will finance expenditures related to M&E, the program leaning agenda including building a body of evidence on gender in PPR, and program implementation and coordination. Finally, the fourth component is the contingent emergency response component. This component will facilitate access to rapid financing by allowing for the reallocation of uncommitted project funds in the event of a natural disaster in a country, either by a formal declaration of a national emergency or upon a formal request from the government."}},"P176954":{"id":"P176954","countryname":["Republic of Indonesia"],"lendinginstr":"Program-for-Results Financing","project_name":"Strengthening Intergovernmental Transfers and Subnational Finance for Service Delivery in Indonesia (SINERGIS) Program","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"400,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176954","status":"Active","project_abstract":{"cdata!":"The development objective of the Strengthening Intergovernmental Transfers and Subnational Finance for Service Delivery in Indonesia (Sinergis) Program for Indonesia is to improve the equity, efficiency, and accountability of district spending financed by intergovernmental transfers. villages. It includes four pillars: (i) reducing vertical and horizontal disparities, (ii) harmonizing central and subnational government (SNG) spending, (iii) improving subnational spending quality, and (iv) strengthening local taxing powers. The results areas (RA) are: RA1: allocating the general allocation fund (DAU) more equitably and efficiently; RA2: strengthening the needs-based allocation of the specific allocation fund (DAK) Fisik and its performance-orientation; and RA 3: strengthening district monitoring and evaluation (M and E) and public financial management (PFM) systems for better decision-making and accountability."}},"P176693":{"id":"P176693","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Sub-Saharan Africa Women’s Empowerment and Demographic Dividend Plus Project","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"365,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176693","status":"Active","project_abstract":{"cdata!":"The objective of the Sub-Saharan Africa Women’s Empowerment and Demographic Dividend Plus (SWEDD+) Project is to increase girls’ and women’s access to learning, economic opportunities, and utilization of health services, and to strengthen the region-wide institutional capacity for gender equality. There are three components to the project, the first component being Design and implement gender transformative interventions that promote girls’ and women’s social and economic autonomy. Component 1 will focus on social and behavioral change activities through five subcomponents. Principal beneficiaries in this component are AGYW, and parents, siblings, boys, husbands, children, and communities as secondary beneficiaries. This component includes five subcomponents: social and behavior change communication campaign, improve life skills and sexual and reproductive health knowledge of adolescents, keep girls in school through at least secondary level to delay marriage and early childbearing, economic and financial inclusion to increase agency and opportunities for AGYW, and strengthen GBV prevention and response actions. The second component is to improve the availability of RMNCAHN services and the number of qualified health workers at the community level. This component includes three subcomponents: enhance the availability of contraceptives and RMNCAHN services at the community level, enhance the performance of the pharmaceutical supply chain, including last mile delivery, and: improve the availability and capacity of health workers providing RMNCAHN services in rural/isolated areas. Finally, the third component is the foster regional and national commitment and capacity for policy making on gender equality and project management. This component includes three subcomponents: strengthen legal frameworks and political commitment for girls’ and women’s reproductive health rights at continental, regional, and national levels, strengthen capacity for policy making and M&E related to demographic dividend and gender issues, and support project implementation capacity."}},"P178928":{"id":"P178928","countryname":["Republic of Mozambique"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for the Integrated Feeder Roads Development Project","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"25,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178928","status":"Active"},"P180266":{"id":"P180266","countryname":["Republic of Mauritius"],"lendinginstr":"Investment Project Financing","project_name":"Rodrigues Airport Project","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180266","status":"Active","project_abstract":{"cdata!":"The development objective of the Rodrigues Airport Project for Mauritius is to improve air transport access and enhance the climate resilience and productivity of the island of Rodrigues. The project comprises of five components. The first component, infrastructure development will fund the construction of a new airport runway and associated facilities on Rodrigues Island. The second component, technical assistance for project implementation and sector reforms consists of following sub-components: (i) support to aviation sector development; and (ii) support to project implementation. The third component, support Rodrigues’ sustainable integrated development with a particular focus on access to water and food security will support local governments, rural communities, and the private sector on the island of Rodrigues to carry out small key investments and implement a sustainable territorial development strategy for Rodrigues. It consists of following sub-components: (i) strengthening of the local food systems; and (ii) supporting improved water management and development. The fourth component, supporting the sustainable development of the tourism sector in Rodrigues consists of following sub-components: (i) supporting tourism promotion and attraction of investments; (ii) skills development to support the tourism sector; (iii) supporting sustainable tourism among Micro, Small and Medium Enterprises (MSMEs); and (iv) strengthening sustainable tourism infrastructure. The fifth component, contingent emergency support (CERC) will facilitate access to rapid financing by allowing for the reallocation of uncommitted project funds in the event of a natural disaster, either by a formal declaration of a national emergency or upon a formal request from the government."}},"P179763":{"id":"P179763","countryname":["Union of the Comoros"],"lendinginstr":"Development Policy Lending","project_name":"Comoros First Fiscal Management and Resilient Growth (FIMARG) Development Policy Financing Series","p2a_updated_date":"2024-12-20 00:00:00.0","totalcommamt":"20,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/15/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179763","status":"Closed","project_abstract":{"cdata!":"The development objectives of the First Fiscal Management and Resilient Growth Development Policy Financing (DPF) for Comoros are the following: (i) enhance debt management and public expenditure efficiency; (ii) strengthen resilience to shocks; and (iii) improve state-owned enterprises governance and performance. The DPF series is closely aligned with multiple pillars of the Emerging Comoros Plan (PCE), especially those focused on promoting Comoros a financial hub, investing in human capital, maintaining a sound macroeconomic framework, and bolstering resilience to climate change and disasters."}},"P177881":{"id":"P177881","countryname":["Federal Democratic Republic of Ethiopia"],"lendinginstr":"Investment Project Financing","project_name":"Ethiopia Education and Skills for Employability Project","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177881","status":"Active","project_abstract":{"cdata!":"The development objective of the Education and Skills for Employability Project for Ethiopia is to improve employment outcomes of the technical and vocational education and training (TVET) system of Ethiopia with a focus on women and marginalized groups. The project comprises of three components. The first component, strengthening public polytechnics for improved labor market outcomes will strengthen selected Polytechnic Colleges (PTCs) to produce high-quality skilled graduates that meet the industry’s needs in priority sectors of the economy. The second component, skills for jobs will support short-term skills programs through a competitive and performance-based financing model that links payments to the employment outcomes of participants. The third component, system strengthening will enhance the information, coordination, and capacity of the TVET system to make it more dynamic in responding to the evolving technical skill needs in the economy and improving employability of its graduates. It consists of following sub-components: (i) information for decision-making; (ii) strengthened system coordination; and (iii) strengthened system capacity for policymaking and implementation."}},"P179361":{"id":"P179361","countryname":["Republic of the Philippines"],"lendinginstr":"Development Policy Lending","project_name":"Philippines First Digital Transformation Development Policy Financing","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"600,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179361","status":"Active","project_abstract":{"cdata!":"The development objective of the First Digital Transformation Development Policy Financing for Philippines is to support government reforms to foster an enabling environment for greater digital technology adoption by: (a) improving digital transformation of government and digital infrastructure policies, (b) expanding financial inclusion through digital finance, and (c) boosting business growth in digital services. The development policy loans (DPL) series builds on the nation’s long-term vision articulated in AmBisyon Natin 2040 and the recently launched Philippine Development Plan 2023-2028 to achieve inclusive growth and supports the government’s reform agenda in accelerating digitalization."}},"P180688":{"id":"P180688","countryname":["Republic of Ecuador"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening the Resilience of Ecuadorian Schools Project","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"190,000,000","boardapprovaldate":"2023-09-29T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180688","status":"Active","project_abstract":{"cdata!":"The development objectives of Strengthening the Resilience of Ecuadorian Schools Project are to: (i) improve the safety, resilience, and quality of physical learning environments and prepare preschool students for learning in selected public schools; and (ii) in case of an Eligible Crisis or Emergency, respond promptly and effectively to it. There are four components to the project, the first component being supporting resilient, inclusive, and learning-centered school infrastructure. This component will support investments in school infrastructure for basic education in Ecuador to ensure that they are inclusive, climate and seismic resilient, energy-efficient, healthy, and learning-centered, following norms of universal access. This component includes three subcomponents: improving resilience to climate events and other crises, adaptation, rehabilitation, and construction of schools for safety and quality, and replacement of damaged infrastructure. The second component is the strengthening fundamental skills and equipping children to learn. This component includes three subcomponents: implementation of new pedagogical models and classroom adaptation in ECE, creation of reading environments in rural schools, and technical studies and evaluations. The third component is the strengthening project management. This component will provide technical assistance and resources for the implementation and monitoring of the project. Finally, the fourth component is the contingent emergency response component."}},"P179278":{"id":"P179278","countryname":["Republic of South Sudan"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening South Sudan’s Financial Sector","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"18,000,000","boardapprovaldate":"2023-09-28T00:00:00Z","closingdate":"9/27/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179278","status":"Active","project_abstract":{"cdata!":"The development objective of Strengthening South Sudan’s Financial Sector Project for South Sudan is to strengthen the institutional and supervisory capacity of the central bank and improve the efficiency of core financial sector infrastructure. This project has four components. 1) The first component, Formulating Financial Sector Policies, has the following sub-components: (i) Financial Sector Development Strategy and Roadmap; and (ii) Building the capacity of Bank of South Sudan (BoSS) staff to formulate and implement financial sector policies. 2) The second component, Institutional Strengthening of the Central Bank, has the following sub-components: (i) Enhancing the Supervisory and Regulatory Oversight of BoSS; and (ii) Supporting the Establishment of the South Sudan Institute of Banking and Finance (SSIBF). 3) The third component, Supporting the Development and Modernization of Key Infrastructure for the Financial Sector, has the following sub-components: (i) Upgrade and Customization of the Core Banking System; and (ii) Enhancing the Effectiveness of the Financial Intelligence Unit. 4) The fourth component, Project Management and Coordination, aims to provide additional capacity through hiring of a full-time project coordinator, a senior procurement specialist, a Financial Management (FM) specialist, and an environmental and social specialist."}},"P179293":{"id":"P179293","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"East Africa Girls' Empowerment and Resilience","p2a_updated_date":"2023-10-01 00:00:00.0","totalcommamt":"392,000,000","boardapprovaldate":"2023-09-28T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179293","status":"Active","project_abstract":{"cdata!":"The development objectives of East Africa Girls' Empowerment and Resilience Project is to increase girls’ and women’s educational attainment and earnings in the program areas, and to strengthen the institutional capacity to implement gender-equality policies. There are four components to the project, the first component being boosting human capital accumulation. This component aims to support girls (aged 10-17) in fully taking advantage of adolescence to accumulate human capital and get ready to enter the labor market. This component includes two sub-components: keep girls in school, and safe spaces for out-of-school girls. The second component is the enabling access to productive employment. This component will address gender-specific constraints that prevent women from successfully performing in the labor market both as wage employees and entrepreneurs. This component includes three subcomponents: school-to-work transition, economic transformation, and economic inclusion. The third component is the building the enabling environment. This component aims to generate change across both formal and informal institutions that define girls’ and women’s environment, including policies and regulatory frameworks, markets, and social norms, by engaging with a wide range of stakeholders beyond girls and women. This component includes three sub-components: policies and markets, social norms and GBV, and eager knowledge platform. Finally, the fourth component is the program implementation support. This component will finance program management and implementation of project-associated activities. It will cover the operating costs of the project implementation units (PIUs) in each participating country and the regional bodies."}},"P177918":{"id":"P177918","countryname":["Burkina Faso"],"lendinginstr":"Investment Project Financing","project_name":"Secondary Cities Urban Mobility and Development Project","p2a_updated_date":"2023-09-29 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-09-28T00:00:00Z","closingdate":"9/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177918","status":"Active","project_abstract":{"cdata!":"The development objective of the Secondary Cities Urban Mobility and Development Project for Burkina Faso is to improve urban mobility, access to basic services and economic opportunities, and strengthen institutional capacity for urban management in selected secondary cities in Burkina Faso. The project comprises of five components. The first component, urban mobility services and infrastructure will support the improvement of urban mobility in the three cities by financing the rehabilitation and upgrading of urban roads and road safety improvements. It consists of following subcomponents: (i) urban mobility services; (ii) urban mobility infrastructure; and (iii) road safety. The second component, urban infrastructure and basic services will focus on improving the living condition of the population through the provision of safe, resilient, green, inclusive urban infrastructure, and socioeconomic services in the three cities using a spatial and people-centered approach that also considers vulnerability to climate shocks (e.g., floods and extreme temperatures). It consists of following sub-components: (i) urban infrastructure for better living conditions; (ii) urban infrastructure and capacity building for economic opportunities; and (iii) prevention, monitoring, and mitigation of sexual exploitation and abuse, (SEA) and gender-based violence (GBV). The third component, institutional strengthening will update and improve existing urban mobility and urban development planning frameworks to ensure the sustainable and climate-resilient use of urban land along selected corridors, as well as institutional strengthening, and capacity building for urban development at central (including the General Directorate of Cooperation - DGCOOP) and local levels. The fourth component, project management consists of following sub-components: (i) project management; and (ii) monitoring and evaluation (M and E). the fifth component, contingent emergency response component (CERC) will draw from the uncommitted resources under the Project from other Project components to cover emergency response."}},"P178653":{"id":"P178653","countryname":["Republic of Mozambique"],"lendinginstr":"Program-for-Results Financing","project_name":"Urban Water Security Program","p2a_updated_date":"2023-09-29 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-09-28T00:00:00Z","closingdate":"9/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178653","status":"Active","project_abstract":{"cdata!":"The development objective of the Urban Water Security Program for Mozambique is to increase access to improved water supply services and to improve service delivery capacity in selected cities. The program will support the implementation of the Urban Water Supply Investment Program (UWSIP) between 2023 and 2029, focusing on the expansion of access and performance improvement of water supply services. The program will also support the ongoing sector reform, which aims to engage the private sector in efforts to improve the performance of services and sustainability of operations with private sector participation (PSP). The program’s three result areas (RAs) are: (i) RA 1: improving the enabling environment for private sector participation; (ii) RA 2: sustainable and climate resilient service delivery (access); and (iii) RA 3: improvement of performance and efficiency of services."}},"P180085":{"id":"P180085","countryname":["Western and Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2)","p2a_updated_date":"2023-09-29 00:00:00.0","totalcommamt":"290,000,000","boardapprovaldate":"2023-09-28T00:00:00Z","closingdate":"12/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180085","status":"Active","project_abstract":{"cdata!":"The development objective of the Harmonizing and Improving Statistics in West and Central Africa - Series of Projects Two (HISWACA - SOP 2) for Central Africa, Central African Republic, Republic of Congo, Cameroon, Gabon, Chad is to improve country statistical performance, regional harmonization, data access and use, and to enhance modernization of the statistical system in participating countries. The project comprises of four components. The first component, harmonization and production of core statistics using international data quality standards relate to supporting the regional statistical harmonization process and the production of quality core statistics to improve data sources and data infrastructure pillars of the statistical performance indicator (SPI), where participating countries in the region are doing poorly in terms of statistical performance. It consists of following sub-components: (i) regional coordination and adoption of harmonized data quality standards; (ii) demographic and socio-economic statistical production; (iii) real and fiscal sector statistical production; (iv) agricultural and climate change statistical production; and (v) sectoral and sub-national administrative data curation. The second component, statistical modernization, institutional reform, human capital, data accessibility and use aim to support statistical modernization; institutional reforms; improvement to data access, dissemination, and use; and human resources development. It consists of following sub-components: (i) statistical modernization of national statistical offices (NSOs); (ii) institutional reforms for selected national statistical systems (NSSs); (iii) enhance human capital; (iv) data accessibility and dissemination; and (v) data use and analysis to inform public policy. The third component, construction, upgrading, and modernization of physical infrastructure component aims to strengthen the capacity of NSOs and statistical schools with the equipment and tools needed to adequately fulfill their mandates. It consists of following sub-components: (i) construction and infrastructure upgrading of selected NSOs and statistical schools; and (ii) modernization of information and communications technology (ICT) and statistical infrastructure of NSO and statistical schools. The fourth component, project management, monitoring, and evaluation goal is to support project management and monitor project results and user satisfaction. It consists of following sub-components: (i) project management; (ii) project results and user satisfaction monitoring; and (iii) performance-based financing for Central African Republic - ICASEES."}},"P178704":{"id":"P178704","countryname":["Republic of Sierra Leone"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing for Sierra Leone Free Education Project","p2a_updated_date":"2023-09-27 00:00:00.0","totalcommamt":"33,730,000","boardapprovaldate":"2023-09-26T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178704","status":"Active"},"P178487":{"id":"P178487","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Program-for-Results Financing","project_name":"Learning Acceleration in Secondary Education Operation","p2a_updated_date":"2023-09-23 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-09-22T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178487","status":"Active","project_abstract":{"cdata!":"The development objective of the Learning Acceleration in Secondary Education (LAISE) Operation for Bangladesh is to improve student learning and retention and build system resilience in secondary education. LAISE will support secondary education program (SEP) through three results areas (RAs). RA1: student support for improved learning, retention, and resilience through improved and inclusive curriculum for better learning outcomes for all students, including improved assessment and enhanced learning opportunities, reading habit development, access to information and communication technology (ICT) and blended learning for resilience, mental and physical wellbeing for improved retention, and initiatives for improved student access to secondary education. RA2: improved teacher competency through enhanced support and capacity development for learning acceleration, climate change education, continuous teacher professional development, and enhanced leadership and management capacity. RA3: improved secondary systems and resilience through introduction and rolling out of blended learning, improved inspection and online monitoring, improved climate change behaviors, and supporting vocational education in the secondary schools."}},"P180220":{"id":"P180220","countryname":["Solomon Islands"],"lendinginstr":"Investment Project Financing","project_name":"Solomon Islands Community Benefits Sharing Project -- Phase 2","p2a_updated_date":"2023-09-25 00:00:00.0","totalcommamt":"5,000,000","boardapprovaldate":"2023-09-22T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180220","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Phase of the Community Benefits Sharing Project is to enable target communities to benefit from improved access to and use of basic infrastructure and services and to operationalize the Community Benefit Sharing Fund (CBSF). There are four components to the project, the first component being operationalize the community benefit sharing fund. Component 1 will seek to operationalize the Community Benefits Sharing Fund ('Fund') by installing and testing the institutional arrangements for the Fund’s operations and by building capacity for Fund management and oversight. This component includes two subcomponents: institutional support to the fund, and CBSF community sub-projects. The second component is to improve access to basic services. This component will support access improvements to basic public services for the project’s target communities. This component includes three subcomponents: rural water supply, rural road improvements, and rural electrification. The third component is the Enhance Skills of Community Members. This component will support activities that aim to increase CBSP community members’ knowledge and confidence to participate in the CBSF processes and local economic development opportunities, and to provide knowledge and skills aimed at income-generating opportunities in both the formal and informal sectors. Finally, the fourth component is the project management, monitoring and evaluation. This component will support project management and administration, monitoring and evaluation, and reporting. As under the CBSP Pilot, the CBSP2 Project Management Unit (PMU) will be closely linked with the Project Office (PO) of TRHDP, which has helped support synergies between the two projects, and the offices may be co-located depending on available office space."}},"P179820":{"id":"P179820","countryname":["Tuvalu"],"lendinginstr":"Development Policy Lending","project_name":"Tuvalu First Climate and Disaster Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option","p2a_updated_date":"2023-09-23 00:00:00.0","totalcommamt":"11,500,000","boardapprovaldate":"2023-09-22T00:00:00Z","closingdate":"10/30/2026 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179820","status":"Active","project_abstract":{"cdata!":"The development objective of the First Climate and Disaster Resilience Development Policy Financing with a Catastrophe Deferred Drawdown Option for Tuvalu aims to support the Government of Tuvalu to: (i) promote climate and disaster resilient fiscal policy and trade facilitation, and (ii) improve the institutional and regulatory framework for climate and disaster resilient infrastructure. As such, pillar 1 supports fiscal risk reporting and subsequent provisioning in the event of natural disasters, and the roll out of climate budget tagging and its integration in Tuvalu’s public financial management (PFM) system. The pillar also supports expedited clearance of critical goods trade during emergencies and natural disasters. Pillar 2 continues to support institutional policy reforms for increased resilience of the built environment and infrastructure, stronger emergency preparedness, response, and post-disaster recovery."}},"P181317":{"id":"P181317","countryname":["Republic of Yemen"],"lendinginstr":"Investment Project Financing","project_name":"Second Additional Financing Yemen Emergency Human Capital Project","p2a_updated_date":"2023-09-23 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-09-22T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181317","status":"Active"},"P179281":{"id":"P179281","countryname":["Federal Republic of Nigeria"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing for Adolescent Girls Initiative for Learning and Empowerment","p2a_updated_date":"2023-09-22 00:00:00.0","totalcommamt":"700,000,000","boardapprovaldate":"2023-09-21T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179281","status":"Active"},"P172499":{"id":"P172499","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Jamuna River Sustainable Management Project 1","p2a_updated_date":"2023-09-20 00:00:00.0","totalcommamt":"108,000,000","boardapprovaldate":"2023-09-19T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P172499","status":"Active","project_abstract":{"cdata!":"The development objective of the First Jamuna River Sustainable Management Project for Bangladesh is to increase capacity for flood management and navigation along the Jamuna River. The project comprises of five components. The first component, flood and riverbank erosion management invest in integrated green and grey infrastructure and institutions that oversee and manage it. The second component, navigation channel development invests in fundamental steps toward establishing dynamic navigation channels of adequate depth that can accommodate large cargo vessels year-round. It consists of following sub-components: (i) hydrography and river information services (RIS); (ii) prototype structures; (iii) institutional strengthening; and (iv) preparation for the second project. The third component, financial protection of communities offers cash payments to the communities soon after payout-eligible flood events occur. It consists of following sub-components: (i) design and development of prearranged financial solutions; and (ii) institutional strengthening. The fourth component, project management will support the Bangladesh Water Development Board (BWDB), Bangladesh Inland Water Transport Authority (BIWTA), Insurance Development and Regulatory Authority (IDRA’s) Project Implementation Units (PIUs) for implementing the Project. The fifth component, contingent emergency response is a provisional zero amount component, which will allow for rapid reallocation of loan proceeds from other project components during an emergency, including climate events, under streamlined procurement and disbursement procedures."}},"P180286":{"id":"P180286","countryname":["Republic of Benin"],"lendinginstr":"Development Policy Lending","project_name":"Benin Boosting Inclusive Growth and Resilience DPF1 series with Cat DDO","p2a_updated_date":"2023-09-18 00:00:00.0","totalcommamt":"230,000,000","boardapprovaldate":"2023-09-15T00:00:00Z","closingdate":"12/31/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180286","status":"Active","project_abstract":{"cdata!":"The development objective of the First Boosting Inclusive Growth and Resilience Development Policy Financing with a Catastrophe-Deferred Drawdown Option for Benin is to support the government’s efforts to: (i) enhance private sector-led growth, (ii) boost domestic revenue collection, and (iii) strengthen social and climate resilience. The first reform pillar supports private sector-led growth by fostering private participation with a new public-private partnership (PPP) framework, creating an ecosystem for micro-, small, and medium-sized enterprise (MSME) development and growth, and improving the investment climate. The second pillar aims to build fiscal resilience and space to absorb shocks by strengthening domestic revenue collection. The third pillar of the program is intended to promote inclusive growth and reduce poverty by supporting access to health services for the most vulnerable population and deploying an adaptative social registry."}},"P178699":{"id":"P178699","countryname":["Central African Republic"],"lendinginstr":"Investment Project Financing","project_name":"Local Governance and Community Resilience Project","p2a_updated_date":"2023-09-07 00:00:00.0","totalcommamt":"90,000,000","boardapprovaldate":"2023-09-06T00:00:00Z","closingdate":"8/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178699","status":"Active","project_abstract":{"cdata!":"The development objective of the Local Governance and Community Resilience Project for Central African Republic is to build state and citizen capacity for local service delivery, improve access to basic socio-economic climate adaptive infrastructure, and provide socio-economic support to the reintegration of ex-combatants. The project comprises of five components. The first component, strengthening central systems underpinning decentralization and enhancing local capacity for service delivery will enhance the capacity of central and local governments, as well as citizens, to improve local service delivery. The component’s activities are organized into three interrelated subcomponents, targeting central state capacity, local state capacity, and citizen capacity. It consists of following sub-components: (i) operationalization of the multi-level governance framework and systems to enable local development; (ii) enhancing the capacity of local authorities to perform their functions; and (iii) enhancing citizen capacity and the citizen-state interface for local development. The second component, community resilience adopts a community and local development-driven approach to increase resilience of the local communities, increase social cohesion among various groups within and between communities, and enhance transparency and accountability. It consists of following sub-components: (i) small scale infrastructure sub-projects; (ii) labor-intensive public works (LIPWs); and (iii) socioeconomic resilience of both farmers and pastoralists to promote. The third component, socioeconomic reintegration of ex-combatants focuses on three key activities: (i) constructing and rehabilitating small-scale climate resilient infrastructure chosen in a participatory manner; (ii) providing civic education, literacy training, psycho-social support, vocational training, and forming income generating groups for ex-combatants; and (iii) engaging ex-combatants in cash-for-work. It consists of following sub-components: (i) small-scale infrastructure sub-projects; (ii) civic education, vocational training, and creation of income generating groups; and (iii) participation of ex-combatants in cash-for-work through LIPW program. The fourth component, project management will support activities including: (i) the planning, implementation, and technical oversight of program activities; (ii) social and environmental risks management; (iii) financial management and procurement; and (iv) putting in place a solid grievance redress mechanism (GRM) system. The fifth component, contingency emergency response will allow for rapid reallocation of project proceeds in the event of natural or man-made disasters or crisis that has caused, or is likely to cause, a major adverse economic and or social impact."}},"P179294":{"id":"P179294","countryname":["Republic of Togo"],"lendinginstr":"Development Policy Lending","project_name":"Togo's First Sustainable and Inclusive Development Policy Financing","p2a_updated_date":"2024-10-22 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-09-06T00:00:00Z","closingdate":"10/20/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179294","status":"Closed","project_abstract":{"cdata!":"The development objective of the First Sustainable and Inclusive Development Policy Financing for Togo is to support green, inclusive, and resilient development in Togo by: (i) promoting sustainable agriculture, rural electrification, and climate mitigation; (ii) boosting human capital and resilience to shocks; and (iii) rebuilding fiscal space for priority interventions. This operation is seeking to reinforce the foundations for green, inclusive, and resilient development in Togo with a particular focus on maximizing opportunities for vulnerable populations in underserved rural areas. The reform program supported by this operation addresses some of the key constraints to faster growth and poverty reduction identified in recent World Bank diagnostics."}},"P180051":{"id":"P180051","countryname":["Democratic Republic of Sao Tome and Prin"],"lendinginstr":"Investment Project Financing","project_name":"Third Additional Financing to STP COVID-19 Emergency Response Project","p2a_updated_date":"2023-09-03 00:00:00.0","totalcommamt":"2,800,000","boardapprovaldate":"2023-08-31T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180051","status":"Active"},"P171144":{"id":"P171144","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"Urban Health, Nutrition and Population Project","p2a_updated_date":"2023-08-31 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-08-30T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P171144","status":"Active","project_abstract":{"cdata!":"The development objective of the Urban Health, Nutrition, and Population (HNP) Project for Bangladesh is to improve delivery of comprehensive primary healthcare services for selected urban areas. The project comprises of two components. The first component, improve urban primary HNP services led by the Ministry of Health and Family Welfare (MoHFW) will support delivery of essential health services in selected urban areas. The second component, improve public health services led by the Local Government Division (LGD), Ministry of Local Government, Rural Development, and Cooperatives (MoLGRD and C) will support delivery of environmental health and preventive services in selected urban areas."}},"P181200":{"id":"P181200","countryname":["Ukraine"],"lendinginstr":"Investment Project Financing","project_name":"Housing Repair for People's Empowerment Project  (HOPE)","p2a_updated_date":"2023-09-01 00:00:00.0","totalcommamt":"70,000,000","boardapprovaldate":"2023-08-30T00:00:00Z","closingdate":"12/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181200","status":"Active","project_abstract":{"cdata!":"The development objective of Housing Repair for People's Empowerment Project for Ukraine is to increase households’ access to repaired housing units damaged by Russia's invasion. This project has three components. 1) The first component, Repair of residential units with partial damage, has the following sub-components: (i) Repair of residential units with minor damage; and (ii) Repair of residential units with medium damage. 2) The second component, Design and capital repair of partially damaged Multi-family buildings (MFBs), has the following sub-compUronents: (i) Preparation of design and project documentation for partially damaged MFBs; (ii) Capital Repair of partially damaged MFBs; and (iii) Support for integrated housing and urban recovery support in selected Local Self Government (LSGs). 3) The third component, Project management and capacity strengthening, aims to finance project management and strengthening project implementation capacity."}},"P174275":{"id":"P174275","countryname":["Democratic Republic of Sao Tome and Prin"],"lendinginstr":"Development Policy Lending","project_name":"Third COVID-19 Recovery and Resilience Development Policy Financing","p2a_updated_date":"2023-08-30 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2023-08-29T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174275","status":"Active","project_abstract":{"cdata!":"The development objective of the Third COVID-19 Recovery and Resilience Development Policy Financing for São Tomé and Príncipe (STP) is to support the government’s response to the human and economic impact of the COVID-19 pandemic and economy-wide and sectoral reforms for a stronger recovery. The programmatic series is organized around two pillars. Pillar 1 has the objective of mitigating the impacts of the COVID-19 crisis on lives and livelihoods and strengthening investment in human capital. Pillar 2 has the objective of mitigating the impact of the COVID-19 crisis on businesses and jobs and laying the foundations for sustainable economic growth. Furthermore, this operation is aligned with Government of STP (GoSTP’s) climate change mitigation and adaptation objectives and will directly support STP’s resilience to climate change related disasters and other shocks, including future pandemics."}},"P180092":{"id":"P180092","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening Food Programs for Vulnerable Populations","p2a_updated_date":"2023-08-23 00:00:00.0","totalcommamt":"450,000,000","boardapprovaldate":"2023-08-22T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180092","status":"Active","project_abstract":{"cdata!":"The development objective of the Strengthening Food Programs for Vulnerable Populations Project for Argentina is to improve the effectiveness and traceability of food programs implemented by the Ministry of Social Development (MDS). The project comprises of three components. The first component, improve food programs managed by MDS aims to improve and strengthen the design, capacity, and quality of Argentina’s two main food assistance programs. The second component, decentralized feed the community program will support the decentralized implementation of the feed the community program (FCP) and finance cash transfers to pre‐paid credit cards of community kitchens to be used exclusively for food purchases. The third component, food benefit program (FBP) financing aims to improve the design and coverage of the FBP."}},"P178635":{"id":"P178635","countryname":["Kingdom of Bhutan"],"lendinginstr":"Development Policy Lending","project_name":"Bhutan Second Green and Resilient Growth Development Policy Credit","p2a_updated_date":"2024-07-10 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-08-22T00:00:00Z","closingdate":"6/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178635","status":"Closed","project_abstract":{"cdata!":"The Bhutan Second Green and Resilient Growth Development Policy Credit aims to (i) strengthen resilient and private sector-led growth through fiscal sustainability and enhanced access to finance and markets, and (ii) foster green growth focused on renewable natural resources. This operation supports reforms for a more resilient economy with a green and diverse production base, to enhance resilience to future shocks and support future development. Reforms to strengthen public debt management and fiscal oversight of SOEs and related fiscal risks are crucial to address short-term macroeconomic vulnerabilities and risks to private investment. Increased access to international finance for firms can support private sector development and firm growth, and free up funds from lending to larger borrowers to smaller companies, thereby enhancing access to credit for smaller companies. Developing a vibrant private sector to generate jobs and diversify the economy, while sustaining Bhutan’s natural environment, will be crucial to build resilience and ensure green and inclusive development. In doing so, Bhutan can seize new opportunities, such as the acceleration of digital development and e-trade in goods and services, which can reduce the cost of distance and remoteness. Finally, Bhutan can leverage its renewable natural resources and carbon-negative status for job creation and additional financing for climate adaptation and mitigation."}},"P180456":{"id":"P180456","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Access to Sustainable Finance for Micro, Small and Medium Enterprises Project","p2a_updated_date":"2023-08-23 00:00:00.0","totalcommamt":"200,000,000","boardapprovaldate":"2023-08-22T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180456","status":"Active","project_abstract":{"cdata!":"The development objective of the Access to Sustainable Finance for Micro, Small, and Medium Enterprises (MSMEs) Project for Argentina is to promote access to sustainable finance for MSMEs and to respond effectively in case of an eligible crisis or emergency. The project comprises of four components. The first component, strengthening the capacity of financial sector stakeholders aims to support key financial sector stakeholders to implement relevant actions to facilitate and speed up the transition of the financial sector into a sustainable financial system that is aligned and contributes to the achievement of the Paris Agreement objectives. The second component, promoting access to sustainable finance for MSMEs consists of following sub-components: (i) line of credit; (ii) partial credit guarantee; and (iii) innovative financial instruments. The third component, project management will finance the activities required for the coordination, implementation, monitoring, and evaluation of the project. The fourth component, contingent emergency response component (CERC) is a contingent financing mechanism available to Argentina to have immediate access to Bank financing to respond to an eligible crisis or emergency, defined as an event that has caused, or is likely to imminently cause, a major adverse economic and or social impact associated with natural or man-made crises or disasters."}},"P180319":{"id":"P180319","countryname":["Republic of Ecuador"],"lendinginstr":"Development Policy Lending","project_name":"Ecuador Third Green and Resilient Recovery DPF (EGARR-DPF3)","p2a_updated_date":"2023-08-08 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2023-08-04T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180319","status":"Active","project_abstract":{"cdata!":"The development objective of the Third Green and Resilient Recovery Development Policy Financing for Ecuador is to assist the government of Ecuador in its agenda to tackle selected structural challenges to foster inclusive, resilient, and low-carbon development. It is organized around two pillars: (i) tackle selected structural challenges to foster green growth, inclusion, and climate resilience; and (ii) strengthen low-carbon development."}},"P178136":{"id":"P178136","countryname":["Republic of Cameroon"],"lendinginstr":"Program-for-Results Financing","project_name":"Cameroon Power Sector Reform Program","p2a_updated_date":"2023-08-08 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-08-03T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178136","status":"Active","project_abstract":{"cdata!":"The development objective of the Power Sector Reform Program for Cameroon is to improve financial performance and transparency of the electricity sector and increase access to electricity in Cameroon. In line with the objectives of national development strategy (NDS)-30, the Government of Cameroon (GoC) has elaborated its Cameroon electricity sector recovery plan (CESRP) 2023-2027 to implement reforms that will address the challenges faced by the sector. The CESRP encompasses the following seven priority areas: (a) a greener electricity generation mix; (b) a resilient transmission grid; (c) a financially sustainable sector; (d) a well-performing operator; (e) an increased access to electricity; (f) an expanded industrial load; and (g) a skilled local workforce."}},"P174157":{"id":"P174157","countryname":["Socialist Republic of Vietnam"],"lendinginstr":"Investment Project Financing","project_name":"Nghe An Province's Vinh City Priority Infrastructure and Urban Resilience Development Project","p2a_updated_date":"2023-07-31 00:00:00.0","totalcommamt":"129,600,000","boardapprovaldate":"2023-07-28T00:00:00Z","closingdate":"11/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174157","status":"Active","project_abstract":{"cdata!":"The development objective of the Nghe An Province’s Vinh City Priority Infrastructure and Urban Resilience Development Project for Vietnam is to reduce flood risk in the core urban area, strengthen capacity for urban resilience management, and support the development of integrated infrastructure in Vinh city. The project comprises of four components. The first component, integrated drainage, environmental sanitation, and connectivity investments will implement the delay and discharge parts of Vinh city’s resilience strategy by expanding and improving the secondary and tertiary combined sewer system in all urban wards, while constructing transport links with improved drainage and wastewater collection capacity. It consists of following sub-components: (i) integrated secondary and tertiary sewer improvement; and (ii) resilient road connectivity improvement. The second component, expansion of water storage capacity will implement the storage part of Vinh city’s resilience strategy. It consists of following sub-components: (i) Hung Hoa 2 regulation lake; and (ii) Hoi Chua drainage pumping station. The third component, river improvements and upgrades will further implement the discharge portion of Vinh city’s resilience strategy by increasing the water discharge capacity into the Vinh River and improving the protective capacity of its riverbank. The fourth component, systems and capacity development will support the development of tools and systems that will enable city officials to better plan and guide the city’s rapid urbanization in a risk-informed and resilient manner and enhance coordination across relevant departments. It consists of following sub-components: (i) integrated flood risk management system development; and (ii) project implementation support."}},"P179307":{"id":"P179307","countryname":["Somali Democratic Republic"],"lendinginstr":"Development Policy Lending","project_name":"Somalia Second Inclusive Growth DPO","p2a_updated_date":"2023-07-31 00:00:00.0","totalcommamt":"75,000,000","boardapprovaldate":"2023-07-28T00:00:00Z","closingdate":"1/31/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179307","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Inclusive Growth Development Policy Financing (DPF) for Somalia is to promote inclusive growth by strengthening intergovernmental fiscal relations and transparency as well as enhancing economic resilience and investment. The operation supports critical elements of the ninth national development plan (NDP)9 as well as the government’s efforts to reach its key priority, the heavily indebted poor country (HIPC) completion point. This operation builds on lessons emerging from DPFs prepared in fragility, conflict, and violence (FCV) contexts."}},"P181070":{"id":"P181070","countryname":["Islamic Republic of Mauritania"],"lendinginstr":"Investment Project Financing","project_name":"Mauritania Youth Employability Project Additional Financing","p2a_updated_date":"2023-07-31 00:00:00.0","totalcommamt":"15,000,000","boardapprovaldate":"2023-07-28T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181070","status":"Active"},"P177661":{"id":"P177661","countryname":["Pacific Islands"],"lendinginstr":"Investment Project Financing","project_name":"Forum Fisheries Agency: Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience","p2a_updated_date":"2023-07-31 00:00:00.0","totalcommamt":"9,000,000","boardapprovaldate":"2023-07-28T00:00:00Z","closingdate":"7/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177661","status":"Active","project_abstract":{"cdata!":"The development objective of Forum Fisheries Agency (FFA) : Pacific Islands Regional Oceanscape Program - Second Phase for Economic Resilience Project for Pacific Islands is to strengthen the shared management of selected Pacific Island oceanic and coastal fisheries, and the critical habitats upon which they depend. This project has four components. 1) The first component, Consolidating oceanic fisheries management, has the following sub-components: (i) Identifying, quantifying and reducing risks of IUU fishing in oceanic fisheries;  and (ii) Enhancing the fisheries management capacity of Targeted FFA Members. 2) The second component, Harnessing economic benefits of oceanic fisheries to the regional economy, has the following sub-components: (i) Modelling and forecasting economic and social benefits of fisheries development; and (ii) Improving investment climate and negotiation capacity. 3) The third component, Strengthening FFA’s operating environment, has the following sub-components: (i) Low carbon transition for FFA’s infrastructure; (ii) Strengthening FFA’s cybersecurity, cloud business continuity, and business planning and accounting; and (iii) Engaging citizens on the regional importance of fisheries. 4) The fourth component, Project Management, aims to finance the Project Management Unit (PMU) to implement and manage the project, including staffing and operation of said unit to conduct monitoring and evaluation, environmental and social risk management, and financial and procurement management."}},"P179009":{"id":"P179009","countryname":["People's Republic of Bangladesh"],"lendinginstr":"Investment Project Financing","project_name":"GAS SECTOR EFFICIENCY IMPROVEMENT AND CARBON ABATEMENT PROJECT","p2a_updated_date":"2023-07-28 00:00:00.0","totalcommamt":"300,000,000","boardapprovaldate":"2023-07-27T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179009","status":"Active","project_abstract":{"cdata!":"The development objective of the Gas Sector Efficiency Improvement and Carbon Abatement Project for Bangladesh is to improve efficiency of gas distribution and end-use, and support carbon abatement in the gas sector. The project comprises of two components. The first component, strengthening the gas sector downstream monitoring and control capabilities consists of following sub-components: (i) enhancing efficiency of the gas distribution network and end-use through metering systems for residential and industrial consumers; (ii) reducing gas leakages on Pashchimanchal Gas Company Limited (PGCL’s) distribution network through reinforced monitoring and upgraded distribution infrastructure; and (iii) implementation support for Titas Gas Transmission and Distribution Company Limited (TGTDCL) and PGCL to supplement their institutional capacity to adequately deliver the project and comply with applicable World Bank policies. The second component, technical assistance for carbon abatement of the oil and gas value chain consists of following sub-components: (i) action plan for carbon abatement of sector operations; and (ii) roadmap for a carbon abatement framework."}},"P180507":{"id":"P180507","countryname":["Bosnia and Herzegovina"],"lendinginstr":"Investment Project Financing","project_name":"Sava and Drina Rivers Corridors Integrated Development Program Additional Financing","p2a_updated_date":"2023-07-26 00:00:00.0","totalcommamt":"40,530,000","boardapprovaldate":"2023-07-25T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180507","status":"Active"},"P179046":{"id":"P179046","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Progestão Acre: Public Sector Management Efficiency","p2a_updated_date":"2023-07-25 00:00:00.0","totalcommamt":"40,000,000","boardapprovaldate":"2023-07-24T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179046","status":"Active","project_abstract":{"cdata!":"The development objective of the Progestão Acre : Public Sector Management Efficiency Project for Brazil is to improve efficiency in public resource management in selected departments of the State of Acre. The project comprises of three components. The first component, whole-of-government management systems consists of following sub-components: (i) human resource management; (ii) pensions management; (iii) public procurement; (iv) public investment management; (v) state owned enterprises; and (vi) asset management. The second component, management systems in strategic sectors consists of following sub-components: (i) health; (ii) education; and (iii) social assistance. The third component, project and change management consists of following sub-components: (i) project management unit; and (ii) change management."}},"P179088":{"id":"P179088","countryname":["Federative Republic of Brazil"],"lendinginstr":"Investment Project Financing","project_name":"Progestão Tocantins: Public Sector Management Efficiency","p2a_updated_date":"2023-07-25 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-07-24T00:00:00Z","closingdate":"12/29/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179088","status":"Active","project_abstract":{"cdata!":"The development objective of the Progestão Tocantins: Public Sector Management Efficiency Project for Brazil is to improve efficiency in public resource management in selected departments of the State of Tocantins. The project comprises of three components. The first component, whole-of-government management systems consists of following sub-components: (i) human resource management; (ii) pensions; (iii) public procurement; (iv) public investment management and budgeting; and (v) asset management. The second component, management systems in strategic sectors consists of following sub-components: (i) health; (ii) education; and (iii) social assistance. The third component, project and change management consists of following sub-components: (i) project management unit; and (ii) change management."}},"P174485":{"id":"P174485","countryname":["Eastern and Southern Africa"],"lendinginstr":"Investment Project Financing","project_name":"Horn of Africa Initiative: Regional Economic Corridor Project (Addis-Djibouti Corridor)","p2a_updated_date":"2023-07-21 00:00:00.0","totalcommamt":"730,000,000","boardapprovaldate":"2023-07-20T00:00:00Z","closingdate":"10/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P174485","status":"Active","project_abstract":{"cdata!":"The development objective of the Horn of Africa Initiative : Regional Economic Corridor Project for Djibouti, Ethiopia, Kenya, Somalia is to improve regional connectivity and enhance logistics efficiency in Ethiopia along the Addis-Djibouti road corridor. The project comprises of five components. The first component, safe, smart, efficient, and climate-resilient design and construction of the MiesoDire Dawa road corridor will finance works, goods, and services on the Mieso-Dire Dawa segment of the Addis-Djibouti corridor. It consists of following sub-components: (i) design and construction of the Mieso-Dire Dawa segment of the Addis-Djibouti regional road corridor, including the design and implementation of an intelligent transportation system (ITS); and (ii) monitoring and supervision of the design and civil works, including the design and implementation of an ITS system. The second component, trade and logistics enhancement complements ongoing activities and investments by the Government of Ethiopia and development partners by supporting regulatory and institutional reform initiatives and investments in trade and logistics facilities. It consists of following sub-components: (i) improvement of infrastructure for Ethiopia and Djibouti at Galafi, and Dewelle and freight terminals along the Addis-Djibouti corridor to enhance trade and logistics; and (ii) regulatory and institutional reforms for overall logistics and service delivery. The third component, localized complementary infrastructure and interventions will finance roads connecting to the main Addis-Djibouti corridor and the agro-logistics infrastructure required to ensure that local communities benefit from enhanced regional connectivity. It consists of following sub-components: (i) construction and maintenance of key access roads in the woredas (districts) in the project corridor’s area of influence; (ii) construction of simple road-side auxiliary markets, climate-friendly storage, and sales facilities along link and access roads, with a section of each facility reserved for women traders; (iii) construction of water wells at key locations in the woredas in the project corridor’s area of influence based on water needs of people and livestock; (iv) consultancy services for detailed monitoring and supervision of the designs of selected access roads, markets, and water well infrastructure; and (v) eligible interventions arising from consultations related to the social development plan not captured in complementary infrastructure activities. The fourth component, institutional development and project implementation will focus on enhancing institutional development and building the capacity of the project implementing agencies for effective management and implementation of the project, including mainstreaming gender, climate change, jobs, inclusion, and citizen engagement initiatives. It consists of following sub-components: (i) capacity enhancement at the Ethiopian Roads Administration (ERA); (ii) capacity enhancement program for Ministry of Transport and Logistics (MoTL), Ministry of Urban and Infrastructure (MoUI), the Railway Regulatory Authority, and the Logistics Transformation Office (LTO) within the Ethiopian Maritime Affairs Authority (EMA); and (iii) support and technical assistance for project implementation and management. The fifth component, contingent emergency response component (CERC) with zero cost allocation will draw from uncommitted resources from other project components to cover an emergency response."}},"P178930":{"id":"P178930","countryname":["Grenada"],"lendinginstr":"Development Policy Lending","project_name":"Grenada Second Recovery and Resilience Programmatic DPC","p2a_updated_date":"2023-07-21 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2023-07-20T00:00:00Z","closingdate":"12/31/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178930","status":"Active","project_abstract":{"cdata!":"The development objective of the Second Recovery and Resilience Programmatic Development Policy Credit for Grenada is to support Grenada’s recovery, through two pillars, (i) promoting a greener and more climate-resilient economy; and (ii) improving sustainability, inclusiveness, and accountability of fiscal management. Reforms under the operation address pre-existing structural challenges, as well as gaps exposed by the pandemic. Pillar 1 helps Grenada build resilience to external shocks and climate change, by supporting comprehensive disaster risk management (DRM) legislation, the accountable and efficient use of energy, and the incentives to preserve resources. Reforms under pillar 2 will help the country strengthen responsible and sustainable fiscal policies, through promoting healthy behavior, reducing the gender gap, mitigating the impact of climate change, establishing an unemployment insurance (UI) program, and enhancing the transparency of the citizenship-by-investment (CBI) program."}},"P179192":{"id":"P179192","countryname":["Kingdom of Morocco"],"lendinginstr":"Program-for-Results Financing","project_name":"Morocco Water Security and Resilience Program","p2a_updated_date":"2023-07-19 00:00:00.0","totalcommamt":"350,000,000","boardapprovaldate":"2023-07-18T00:00:00Z","closingdate":"12/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179192","status":"Active","project_abstract":{"cdata!":"The development objective of the Water Security and Resilience Program for Morocco is to strengthen water sector institutions and increase water availability in selected areas in Morocco. The program is structured around three results areas (RA) that provide mutually reinforcing incentives for the completion of activities needed to achieve the program development objective (PDO): RA 1: strengthening water sector governance; RA 2: improving financial sustainability and water use efficiency; and RA 3: enabling the integration of non-conventional water resources."}},"P181161":{"id":"P181161","countryname":["Republic of The Gambia"],"lendinginstr":"Investment Project Financing","project_name":"Second AF to The Gambia Essential Health Services Strengthening Project","p2a_updated_date":"2023-07-14 00:00:00.0","totalcommamt":"8,830,000","boardapprovaldate":"2023-07-13T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181161","status":"Active"},"P178410":{"id":"P178410","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Program-for-Results Financing","project_name":"Punjab Family Planning Program","p2a_updated_date":"2023-07-14 00:00:00.0","totalcommamt":"100,000,000","boardapprovaldate":"2023-07-12T00:00:00Z","closingdate":"6/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178410","status":"Active","project_abstract":{"cdata!":"The development objective of the Punjab Family Planning Program-for-Results (PforR) for Pakistan is to increase utilization of effective quality family planning services in Punjab. The government program includes the population welfare program of the Population Welfare Department (PWD) and the Punjab Health Sector Strategy (2019-28) of the Primary and Secondary Health Department (P and SHD). The Punjab Health Sector Strategy 2019-28 provides the framework for future planning, management, and service delivery by the Punjab Health Department to address health outcomes over the next decade. The PforR will address the challenges by ensuring focus on 3 result areas. The three results areas capture all the operational strategies of the PWD and outcome 1 of the Punjab Health Sector Strategy 2019-28. The results areas are formulated as follows: results area 1: improved availability of family planning services and commodities; results area 2: increased demand for family planning commodities; and results area 3: advocacy and leadership."}},"P177722":{"id":"P177722","countryname":["Republic of Tajikistan"],"lendinginstr":"Investment Project Financing","project_name":"Financial and Private Sector Development Project","p2a_updated_date":"2023-07-11 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-07-10T00:00:00Z","closingdate":"9/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P177722","status":"Active","project_abstract":{"cdata!":"The development objective of the Financial and Private Sector Development Project for Tajikistan is to strengthen deposit insurance, promote bank lending to micro, small and medium-sized enterprises (MSMEs), and boost MSME integration in value chains. The project comprises of four components. The first component, deposit insurance will use a set of disbursement conditions, investments, and technical assistance to improve depositor trust, mitigate the likelihood of bank runs, and contribute to greater deposit mobilization. It consists of following sub-components: (i) individual deposit insurance fund (IDIF) financing; (ii) payout automation; and (iii) public awareness campaign. The second component, partial risk-sharing facility (PRSF) will finance a PRSF and related capacity building to share the credit risk of eligible MSME loans extended by eligible participating financial institutions (PFIs) through guarantee funds (GFs), in order to support MSMEs facing collateral constraints or higher risk aversion by banks. It consists of following sub-components: (i) PRSF financing; and (ii) capacity building. The third component, supplier and export development program will fund the capacity building and partial reimbursement grants for MSMEs to strengthen their linkages with prominent local and multinational corporations. It consists of following sub-components: (i) technical assistance and capacity building; and (ii) partial reimbursement grants. The fourth component, project implementation, coordination, and management will finance overall project implementation, coordination, and management."}},"P180748":{"id":"P180748","countryname":["Kyrgyz Republic"],"lendinginstr":"Investment Project Financing","project_name":"Heat Supply Improvement Project Additional Financing","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"6,900,000","boardapprovaldate":"2023-07-06T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180748","status":"Active"},"P176733":{"id":"P176733","countryname":["Republic of India"],"lendinginstr":"Investment Project Financing","project_name":"IN: Manipur Infotech eNabled Development Project","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"46,000,000","boardapprovaldate":"2023-07-06T00:00:00Z","closingdate":"9/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P176733","status":"Active","project_abstract":{"cdata!":"The objective of the Manipur Infotech Enabled Development Project for India is to promote digital skills and entrepreneurship, increase access to broadband in project areas, and to enhance and secure the foundations for digital government in Manipur. There are four components to the project, the first component being digital industry, skills, and jobs. This component includes three subcomponents: improving access to digital skills and job placement programs, encouraging digital startups, and promoting investment in digital industries. The second component is the broadband connectivity, access, and use. This component includes three subcomponents: reducing the cost of broadband deployment, stimulating broadband infrastructure investment, and boosting digital literacy and access to affordable technology. The third component is the foundations of digital government. This component includes three subcomponents: investing in data infrastructure, enhancing cybersecurity and data sharing, and implementing specific digital G2B services. Finally, the fourth component is the project management and coordination. This component will provide capacity building and project management support to the implementing agency of the Project (CCML), including environment and social framework, fiduciary, monitoring and evaluation, communications and stakeholder engagement, and coordination with public agencies, private sector, academia, and civil society."}},"P180707":{"id":"P180707","countryname":["Islamic Republic of Pakistan"],"lendinginstr":"Investment Project Financing","project_name":"Khyber Pakhtunkhwa Citizen-Centered Service Delivery Project","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-07-06T00:00:00Z","closingdate":"6/30/2025 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P180707","status":"Active","project_abstract":{"cdata!":"The objective of the Khyber Pakhtunkhwa (KP) Citizen-Centered Service Delivery Project for Pakistan is to promote access to child health services and enhance citizen-centered service delivery in selected districts of Khyber Pakhtunkhwa Province. There are two components to the project, the first component being promoting access to child health services. This component will focus on providing child health services, including child health awareness and counseling, screening of children for malnutrition using growth monitoring, immunization services, and referral of complicated cases to pre-identified stabilization centers and pediatricians, to mothers with children aged 0–24 months in selected districts of KP. This component is partly financed by the MDTF which supports reconstruction, rehabilitation, reforms, and other interventions needed to build peace and create the conditions for sustainable development in Khyber Pakhtunkhwa, including the NMDs, and Balochistan. Finally, the second component is the enhanced citizen-centered service delivery and program management. This component will focus on enhancing program management, transparency, and accountability at the federal, provincial, and local level administrations through capacity building, stakeholder consultation, social mobilization, strategic communication and awareness, and monitoring."}},"P181119":{"id":"P181119","countryname":["Republic of Haiti"],"lendinginstr":"Investment Project Financing","project_name":"Additional Financing - Haiti Caribbean Air Transport Connectivity Project","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"12,000,000","boardapprovaldate":"2023-07-05T00:00:00Z","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P181119","status":"Active"},"P178595":{"id":"P178595","countryname":["Jamaica"],"lendinginstr":"Investment Project Financing","project_name":"Jamaica Education Project","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"30,000,000","boardapprovaldate":"2023-07-05T00:00:00Z","closingdate":"6/30/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178595","status":"Active","project_abstract":{"cdata!":"The development objective of the Education Project for Jamaica is to improve teaching practices and learning conditions in secondary education, and the use of information for decision-making in the education system. The project comprises of five components. The first component, strengthening teaching and learning in secondary education consists of following sub-components: (i) support to teaching in secondary education; and (ii) support to articulation of flexible pathways and better use of learning assessments. The second component, supporting quality and resilient school infrastructure aims to improve access to quality and resilient school infrastructure through the construction of one secondary Science, Technology, Engineering and Mathematics (STEM) school. The third component, strengthening information systems and strategies for student retention will support the development of an efficient information system to improve the overall management of the education sector and deploy targeted intervention strategies to support student retention, particularly at the secondary level. It consists of following sub-components: (i) strengthening the education management information system (EMIS); and (ii) strengthening early warning systems and targeted interventions for student retention. The fourth component, technical assistance (TA), strengthening institutional capacity, and project management will provide TA on key aspects of the education system, strengthen institutional capacity, and support management of project activities. It consists of following sub-components: (i) provision of TA for the education sector; and (ii) strengthening institutional capacity for project management and implementation. The fifth component, contingent emergency response component (CERC) will not have any initial funding allocation, but uncommitted funds can be reallocated from other components in the event of an eligible emergency, in accordance with an emergency action plan prepared by the Government of Jamaica (GOJ) and the CERC’s implementation modalities."}},"P179534":{"id":"P179534","countryname":["Argentine Republic"],"lendinginstr":"Investment Project Financing","project_name":"Strengthening the Digital Health Agenda in the Province of Buenos Aires","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"50,000,000","boardapprovaldate":"2023-07-05T00:00:00Z","closingdate":"4/30/2027 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179534","status":"Active","project_abstract":{"cdata!":"The development objective of the Strengthening the Digital Health Agenda in the Province of Buenos Aires Project for Argentina is to increase access to health services and improve coordination and continuity of care in the public healthcare (PHC) network of the Province of Buenos Aires. The project comprises of three components. The first component, strengthening the implementation of electronic medical records (EMRs) and integrated health records (IHRs) will improve integration, coordination, and continuity of care. It consists of following sub-components: (i) adopting IHR in public health facilities of municipalities and provincial hospitals; (ii) promoting interoperability across health information systems of municipalities; and (iii) expanding IHR functionalities. The second component, developing and implementing virtual tools for health provision and communication will finance telemedicine solutions aimed at improving access to services, particularly under situations that can pose higher risks to patients in commuting to a health care facility, for example under heatwaves, floodings, and pandemics. It consists of following sub-components: (i) enabling a chatbot and implementing a virtual healthcare center; and (ii) implementing a virtual network of PHC facilities with hospital specialists. The third component, project management will support the strengthening of the Executing Agency and Sub-executing Agency in everything related to their functions for implementing the project."}},"P179550":{"id":"P179550","countryname":["Republic of Cote d'Ivoire"],"lendinginstr":"Investment Project Financing","project_name":"Côte d'Ivoire Health, Nutrition, and Early Childhood Development Program","p2a_updated_date":"2023-07-07 00:00:00.0","totalcommamt":"231,500,000","boardapprovaldate":"2023-06-30T00:00:00Z","closingdate":"6/30/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179550","status":"Active","project_abstract":{"cdata!":"The development objective of the Health, Nutrition, and Early Childhood Development (ECD) Program Project for Côte d’Ivoire is to: (i) reduce maternal mortality and stunting, (ii) improve ECD outcomes, and (iii) improve resilience against future pandemics. The project comprises of five components. The first component, strengthen and expand the social health protection (SHP) system will support the scale-up of the SHP system and strategic purchasing. It consists of following sub-components: (i) operationalize and scale-up the universal health insurance scheme (CMU); and (ii) institutionalize performance-based financing (PBF) and support health financing reforms. The second component, improve quality of health, nutrition, and ECD services consists of following sub-components: (i) improve human resource management; (ii) improve availability of essential medicines and nutritional inputs; (iii) strengthen governance; (iv) improve quality of clinical; radiology; and laboratory services through public-private partnership (PPPs); and (v) equip health facilities and expand wash, sanitation, and hygiene (WASH) services. The third component, strengthen delivery of nutrition, ECD, and reproductive, maternal, newborn, child, and adolescent health and nutrition (RMNCAH-N) services consists of following sub-components: (i) strengthen delivery of nutrition and ECD services; (ii) strengthen delivery of RMNCAH-N services; and (iii) demand creation and behavior change. The fourth component, institutional strengthening, monitoring and evaluation (M and E), and project management will finance interventions to strengthen the capacity of implementing agencies (Ministry of Health, Public Hygiene and Universal Health Coverage (MSHPCMU); (Ministry of Labor and Social Protection (MEPS); Executive Secretariate of the National Council for Nutrition, Food, and Early Childhood Development) (SE-CONNAPE)), including capacity to plan, implement, and evaluate the project interventions and institutional coordination at various levels from the national to the community level. The fifth component, contingent emergency response component (CERC) will utilize uncommitted project resources from other project components to cover the costs of emergency response."}},"P179512":{"id":"P179512","countryname":["Republic of Angola"],"lendinginstr":"Development Policy Lending","project_name":"Angola First Green, Resilient, Inclusive Growth and Diversification Development Policy Financing","p2a_updated_date":"2024-07-08 00:00:00.0","totalcommamt":"500,000,000","boardapprovaldate":"2023-06-30T00:00:00Z","closingdate":"6/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179512","status":"Closed","project_abstract":{"cdata!":"The development objective of the First Green, Resilient, Inclusive Growth, and Diversification Development Policy Loan for Angola is to support the Government of Angola to promote green, resilient, and inclusive growth by: (i) reducing economic distortions and strengthening fiscal and financial sector resilience; (ii) boosting equity by strengthening social inclusion; and (iii) Improving markets and infrastructures to build climate resilience. The development policy financing (DPF) is aligned with national development priorities and reflects the World Bank Group’s (WBG) engagement in Angola. The DPF builds on policy dialogue structured around analytical work, such as the 2019 Country Private Sector Diagnostic (CPSD), 2022 Public Finance Review (PFR), 2022 Country Climate and Development Report (CCDR), and other ongoing and planned WBG engagements. It builds also on the reforms supported by the previous DPF series. The following interdependent filters were applied to guide the choice of sectors and reforms included in the DPF series: (i) criticality and robustness of reforms; (ii) presence of strong analytical underpinnings to inform the choice of actions; (iii) robustness of implementation arrangements to support reforms including through complementary investment operations and technical assistance; (iv) Government of Angola (GoA) ownership to implement the reforms within the operation’s timeframe; and (v) coordination with other development partners."}},"P179297":{"id":"P179297","countryname":["Romania"],"lendinginstr":"Development Policy Lending","project_name":"Romania Second Programmatic Inclusive and Green Growth Development Policy Loan","p2a_updated_date":"2024-10-11 00:00:00.0","totalcommamt":"650,000,000","boardapprovaldate":"2023-06-30T00:00:00Z","closingdate":"9/30/2024 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P179297","status":"Closed","project_abstract":{"cdata!":"The development objective of Second Programmatic Inclusive and Green Growth Development Policy Loan Project is to support the government of Romania’s efforts to: 1) strengthen inclusion and fiscal management; and 2) foster decarbonization and climate resilience. The government’s program for 2021-2024 aims to build a cohesive and open society that benefits from improved education and health systems, and from reduced inequalities between men and women and between urban and rural areas. The government’s program to support the Forcibly Displaced Persons (FDPs) from Ukraine was set up swiftly and is evolving depending on the needs. This operation supports the government in all of the six pillars of the National Recovery and Resilience Plan (NRRP), facilitating increased absorption of EU Funds. The measures implemented to facilitate the access of the FDPs to social services and the labor market and their integration in the host communities are aligned with six NRRP pillars of: (i) green transition; (ii) digital transformation; (iii) smart, sustainable and inclusive growth; (iv) social and territorial cohesion; (v) health, and economic, social and institutional resilience; and (vi) policies for the next generation, children and the youth."}},"P175235":{"id":"P175235","countryname":["Central Africa"],"lendinginstr":"Investment Project Financing","project_name":"Central Africa Regional Waterways Project","p2a_updated_date":"2023-06-30 00:00:00.0","totalcommamt":"330,000,000","boardapprovaldate":"2023-06-29T00:00:00Z","closingdate":"10/31/2029 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P175235","status":"Active","project_abstract":{"cdata!":"The development objective of the Central Africa Regional Waterways Project for Central African Republic (CAR), Republic of Congo (ROC) of is to enhance transport and trade efficiency, infrastructure climate-resilience, and socio-economic inclusion, along the selected waterway and road corridor sections between CAR and ROC. The project comprises of five components. The first component, waterways, ports, and road infrastructure improvement consist of following sub-components: (i) Congo-Ubangi waterways improvement investments; (ii) Congo-Ubangi ports infrastructure improvement investments; (iii) key road infrastructure investment and asset preservation in CAR; and (iv) digital connectivity along the road in CAR. The second component, support for waterway and road sectors governance and trade facilitation consists of following sub-components: (i) technical assistance (TA) on trade facilitation for enhanced efficiency; (ii) TA to economic interest group for common waterways maintenance (GIE-SCEVN) for improved waterways maintenance capacity; (iii) TA to International Commission of the Congo-Ubangi-Sangha Basin (CICOS) for improved water resources and waterways management; and (iv) TA for enhanced climate resilience, navigability, road and river transport safety, port and waterway security, and road and port asset management. The third component, socially-inclusive investments and capacity building for riparian communities consists of following sub-components: (i) community-level infrastructure works; and (ii) capacity building for local traders. The fourth component, project management, implementation support, and institutional strengthening consists of following sub-components: (i) project management and operating costs; (ii) resettlement costs; and (iii) institutional strengthening. The fifth component, contingent emergency response (CERC) can be activated in CAR and in ROC to provide support for an immediate response to an eligible crisis or emergency as needed."}},"P178750":{"id":"P178750","countryname":["Republic of Senegal"],"lendinginstr":"Investment Project Financing","project_name":"SENEGAL HIGHER EDUCATION PROJECT - ESPOIR-JEUNES","p2a_updated_date":"2023-06-30 00:00:00.0","totalcommamt":"150,000,000","boardapprovaldate":"2023-06-29T00:00:00Z","closingdate":"7/31/2028 12:00:00 AM","url":"https://projects.worldbank.org/en/projects-operations/project-detail/P178750","status":"Active","project_abstract":{"cdata!":"The development objective of the Higher Education Project : Espoir‐Jeunes for Senegal is to increase equitable access to market‐relevant short‐term vocational tertiary education and strengthen governance and research in higher education. The project comprises of three components. The first component, diversifying and increasing access to tertiary technical and vocational education for improved employability of youth is designed to respond to the unmet demand for higher‐level technical and vocational skills development and address the critical challenges of low access to relevant short‐term tertiary education programs which are aligned with the labor market needs. It consists of following sub-components: (i) increasing access to and development of short‐term higher education through the construction and equipment of new Tertiary Education Vocational Institute (ISEPs); (ii) promoting pedagogical excellence in the ISEP network; and (iii) supporting the fund for vocational training (3FPT) in improving the employability of ISEP graduates. The second component, improving the management and governance of the higher education system will support improving the management and governance of the higher education system as well as contribute to more effective research. It consists of following sub-components: (i) improved university management through performance‐based contracts; (ii) spurring research for impact; and (iii) modernizing the sector through key institutional reforms and enhanced digitalization. The third component, strengthening project management and monitoring and evaluation consists of following sub-components: (i) project management and institutional support; and (ii) evaluation of childcare center model."}}},"facets":{}}